k` fry <br />t. <br />t� r <br />>•.., ,. ,u-._ .:.u��:.5 ;,� <r> n3 �, � �'� *' ems: - ,3' ,Px .,.. r� ,.�. - .� <br />APPLICATION RATES AND QUALITY STANDARDS FOR MULCH MATERIALS <br />MULCH MATERIALS QUALITY PRODUCTS APPLICATION RATES <br />STRAW <br />AIR-DRIED; FREE FROM UNDESIRABLE <br />2"-3" THICK; <br />SEED AND COARSE MATERIAL <br />5 BALES PER 1000 SF <br />OR 2-3 TONS PER ACRE <br />WOOD FIBER CELLULOSE <br />NO GROWTH INHIBITING FACTORS <br />APPROX. 35-45 LBS <br />PER 1000 SF, OR <br />1500-2000 LBS PER ACRE <br />COMPOST <br />NO VISIBLE WATER OR DUST DURING <br />2" THICK, MIN., (APPROX. 100 <br />HANDLING. MUST BE PURCHASED <br />TONS PER ACRE APPROX. 750 <br />FROM SUPPLIER WITH SOLID WASTE <br />LBS .PER CUBIC YARD) <br />HANDLING PERMIT <br />APPLICATION: <br />MULCH MAY BE APPLIED: <br />ON DISTURBED SURFACES THAT WILL REMAIN UNWORKED FOR MORE THAN 7 DAYS <br />(2 DAYS IN THE WET SEASON). <br />ON DISTURBED AREAS THAT NEED COVER MEASURES FOR LESS THAN 30 DAYS. <br />AS A COVER FOR SEED DURING THE WET SEASON AND DURING THE HOT SUMMER MONTHS. <br />GRADIN 1I DURING THE WET SEASON, ON DISTURBED SLOPES STEEPER THAN 3H:1 V <br />CUT = 890 C.Y. WITH MORE THAN 10 FEET OF VERTICAL RELIEF. <br />FILL = 890 C.Y. MAINTENANCE: <br />GRADING QUANTITIES ESTIMATED MULCH MUST BE INSPECTED REGULARLY AND MORE MULCH ADDED AS NEEDED TO <br />BASED ON CURRENT SITE MAINTAIN THE SUGGESTED APPLICATION RATE, ALL RIPS OR TEARS IN PLASTIC <br />INFORMATION & ASSUMED <br />EXCAVATIONS NECESSARY FOR SHEETING SHALL BE REPAIRED, SHEETING SHALL BE CHECKED TO ENSURE IT iS <br />PROPOSED IMPROVEMENTS. PROPERLY OVERLAPPED AND WEIGHTED IN PLACE; SHEETING SHALL BE RE --LAPPED <br />AND WEIGHTS REPLACED AS NEEDED. <br />IVUL Oil <br />PAR WY OF EVERM <br />PER SWMUWW <br />RMP C121 <br />PERMANENT COVER BMP (HYDROSEEDING GENERAL <br />NOTES) <br />1: CONSTRUCTION ACCEPTANCE: WILL BE <br />SUBJECT TO A WELL ESTABLISHED GROUND COVER <br />THAT FULFILLS THE REQUIREMENT OF THE <br />APPROVED CONSTRUCTION PLANS. <br />2. ALL DISTURBED AREAS SUCH AS DETENTION <br />FACILITIES, ROADWAY BACK —SLOPES, ETC. SHALL <br />BE SEEDED WITH A PERENNIAL GROUND COVER <br />GRASS TO MINIMIZE EROSION. GRASS SEEDING WILL <br />BE DONE USING AN APPROVED HYDROSEEDER OR <br />AS OTHERWISE APPROVED BY THE CITY OF <br />EVERETT. <br />3. PREPARATION OF SURFACE: ALL AREAS TO BE <br />SEEDED SHALL BE CULTIVATED TO THE <br />SATISFACTION OF THE CITY INSPECTOR. THIS MAY <br />BE ACCOMPLISHED BY DISCING, RAKING, HARROWING <br />OR OTHER ACCEPTABLE MEANS. <br />4. IMMEDIATELY FOLLOWING FINISH GRADING, <br />PERMANENT VEGETATION (CONSISTING OF RAPID, <br />PERSISTENT AND LEGUME) WILL BE APPPLIED. <br />(MINIMUM 80# PER ACRE). THIS IS TO INCLUDE THE <br />FOLLOWING: 20% ANNUAL, PERENNIAL OR HYBRID <br />RYE GRASS, 40% CREEPING RED FESCUE, 40% <br />WHITE CLOVER. HYDROSEED REQUIRED. <br />5. FERTILIZER: SHALL BE APPLIED AT 400# PER <br />ACRE OF 10-20-20 (10 LB. PER 1,100 SQUARE <br />FEET) OR EQUIVALENT. <br />PERMA NEN r SEEDING <br />PER C17Y ®f RE7T <br />PER SWMMWW <br />BMP C120 <br />CONS TRUC TION SEQUENCE <br />1. PRIOR TO ANY CONSTRUCTION ACTIVITY THE CONTRACTOR SHALL <br />N <br />v W.M <br />SCHEDULE AND ATTEND A PRE —CONSTRUCTION CONFERENCE WITH THE <br />g CITY OF EVERETT INSPECTOR. (CITY OF EVERETT PLANNING SHALL BE <br />INCLUDED 1N THE MEETING.) <br />2< INSTALL ORANGE PLASTIC CLEARING LIMIT FENCING AS INDICATED. <br />3. INSTALL ALL SILT FENCE AND INLET PROTECTION. <br />4. CLEAR FOR AND CONSTRUCT THE TEMPORARY CONSTRUCTION ACCESS <br />STABILIZATION TO GRADE, <br />)CA5. CLEAR, GRUB, AND GRADE FOR UTILITY CORRIDORS. <br />6. MAINTAIN EXISTING PERIMETER VEGETATION AND ADD ADDITIONAL ROW <br />OF SILT FENCING WHERE NECESSARY. <br />7. CONSTRUCT UTILITIES, PAVING & DRIVEWAY CUTS PER APPROVED <br />DESIGN PLANS. <br />8. APPLY MULCH TO UNCOVERED AREAS 1N ACCORDANCE WITH THE <br />MULCH DETAIL THIS SHEET. <br />10. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE <br />STABILIZED IN ACCORDANCE WITH THESE PLANS AND APPLICABLE BMP'S <br />REMOVED. <br />INFILTRATION PROTECTION NOTE: <br />CONTRACTOR TO LIMIT HEAVY EQUIPMENT <br />TRAFFIC IN FUTURE INFILTRATION AREAS <br />SHOWN. LEAVE GROUND ELEV. A MIN OF 2 <br />FEET ABOVE BOTTOM OF INFILTRATION TRENCH <br />UNTIL SITE IS READY FOR FINAL INFILTRATION <br />INSTALLATION. NO SURFACE RUNOFF SHALL BE <br />DIRECTED TO ANY INFILTRATION SYSTEM UNTIL <br />THE SITE HAS BEEN STABILIZED. FLAG AREA <br />OR FENCE AS NEEDED. <br />EROSION & SEDIMENTATION TNOTES <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT <br />CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE . DESIGN (E.G. SIZE <br />AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, <br />UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF <br />THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND <br />. APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br />e= 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE <br />3� CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION, DURING THE <br />CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS <br />SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION <br />WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO <br />79, ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE <br />SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC <br />FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND <br />TO ENSURE THAT SEDIMENT AND SEDIMENT —LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY <br />AFTER STORM EVENTS, <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A <br />MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM <br />EVENT. <br />8, AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO <br />ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE <br />LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT <br />STREET CLEANING NOTE: FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM, <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF <br />CITY STREETS TO BE KEPT CLEAR OF DIRT CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL <br />AND DEBRIS AT ALL TIMES DURING MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN <br />CONSTRUCTION. DUST SUPPRESSION AND FOR THE DURATION OF THE PROJECT. <br />STREET CLEANING MUST OCCUR AS DIRECTED 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS <br />BY THE PUBLIC WORKS INSPECTOR, AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING <br />SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED <br />FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO <br />MORE THAN 7 DAYS, FROM MAY 1 THROUGH SPTEMBER 30. <br />m <br />E <br />a <br />f f <br />f <br />i <br />z <br />{ <br />I <br />t <br />{ <br />fr <br />S <br />S <br />f <br />I s <br />1 <br />3 <br />4 <br />z <br />t <br />S <br />01 <br />e <br />ULI <br />i <br />00 <br />;Y' aw <br />r. <br />