Laserfiche WebLink
0 0 <br />s or •- . <br />Element 12. Manage the Project: <br />❑ BMP C150: Materials On Hand <br />R BMPC160: Certified Erosion andSedimentControlLead <br />(CESCL not required on -site for sites <1acre) <br />❑ BMP C162:Scheduling <br />❑ OtherPertheSWMMWW: <br />© Not applicable to my proposed project <br />Explain: <br />Element 13. Protect low impact development: <br />❑ BMP C102: BufferZones <br />❑ BMP C103: High Visibility Plastic or Metal Fence <br />❑ BMP C200: Interceptor Dike and Swale <br />❑ BMP C207: CheckDams <br />❑ BMP C208: Triangular Silt Dike (Geotextile Encased Check Dam) <br />❑ BMP C231: Brush Barrier <br />© BMP C233 Silt Fence <br />© BMP C 234: Vegetated Strip <br />❑ Other PertheSWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />Task 3: Construction SWPPP drawings <br />Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br />M Show on yourTESC Plan all BMPs selected above to satisfy the 13 Elements on your <br />TESC Plan. <br />See City of Everett Public Works Standard Plan 103-TESC Plan Example <br />everettwa.gov/DocumentCenter/­View/­­7040 <br />Note: Construction StormwaterPollution Prevention Plans (Construction SWPPPs) that <br />involve engineering calculations must be prepared by orunder the direction of <br />Washington State professional licensed engineer. <br />City of Everett Public Works <br />Construction Stormwater Pollution Prevention Plan <br />(SWPPP) Template for Small Projects <br />