Laserfiche WebLink
• <br /> Task 1: Describe the project during construction <br /> Nature and purpose of the construction project: <br /> .��.. Convert existing SFR to DADU and construct new SFR <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that <br /> might be affected by the construction project: <br /> None known <br /> ;u. <br /> How upstream drainage areas may affect the site: <br /> None Known <br /> Downstream drainage leading from the site to a receiving body of water: <br /> Dogwood Elm Creek <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> Dogwood Elm Creek <br /> Special requirements and provisions for working near or within critical areas: <br /> No critical areas within property boundaries. Erosion Control measures will be <br /> taken to ensure no erosion leaves property boundaries. <br /> Areas on the site that have potential erosion problems: <br /> None Known <br /> CITY OF EVERETT <br /> REVIEWED FOR Pr-PA/FT <br /> Locations where surface water leaves the site: <br /> None Known <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 2 of 6 <br /> (SWPPP)Template for Small Projects <br />