Laserfiche WebLink
1. PROJECT OVERVIEW <br /> This document is intended to provide engineering information necessary to support the <br /> new garage and additional driveway building and construction permit applications to the <br /> City of Everett on this lot. The site is located at 2207 Gibson PI, Everett, WA 98203, refer <br /> to Figure 1 for a vicinity map. The gross lot area is approximately 0.59 acres. The <br /> existing site contains a SFR, asphalt and concrete driveway and landscaping. The <br /> existing SFR was recently permitted and will remain along with the existing driveway. This <br /> project will add to the existing driveway and construct a detached garage south of the <br /> SFR. The average slope of the site within the proposed area of disturbance is flat and <br /> averages less than 3% down to the north. Steep slopes are present to the north of the lot, <br /> the top of the steep slopes are located in the northern portion of the parcel, between the <br /> SFR and the BNSF RNV. The toe of the slope is located off-site on the BNSF R/W. The <br /> existing driveway takes access from a 30' ingress, egress and utility easement serving this <br /> parcel and a two-lot short plat to the east. Access to the site will be maintained off the <br /> existing driveway as it currently exists, to the southwest. <br /> This project proposes to construct approximately 2,702 sf of new/replaced impervious <br /> surfaces. Due to the size of the project and that it is an expansion of the earlier site <br /> improvements, minimum requirements 1-9 apply to all of the new impervious surfaces for <br /> this project along with all the disturbed pervious surfaces. Included on the following page <br /> is a copy of the MR flow chart out of the COE Drainage Manual showing how the <br /> applicable minimum requirements were determined. This proposal does not meet any of <br /> the land-use criteria that require specific source control for the final use and a SWPPP has <br /> been prepared to address the runoff from the site during construction. Refer to Sections 4 <br /> and 5 for a detailed discussion. <br /> Figures 2 &3 are provided to show the existing and developed basins and runoff <br /> conditions for the two lots. The runoff from the proposed disturbance area, in the existing <br /> conditions, spreads over the flat landscaping as sheet flow. The topography of the site <br /> directs the runoff from the disturbance area over the steep slopes to the north of the lot. In <br /> the developed conditions runoff generated by the proposed impervious surfaces will be <br /> collected and conveyed to an existing conveyance system installed as part of the short <br /> plat to the east. This conveyance system was sized to accommodate this parcel and <br /> directs runoff over the bank with a dispersal tee discharging onto the BNSF R/W at the <br /> base of the slope. <br /> The on-site soils have also been reviewed by Julian Liu, a geotechnical engineer. The on- <br /> site soils were found to be Esperance sands, with the water table not encountered at a <br /> depth of 31.5 feet below grade and an infiltration rate of 4.5 in/hr. Refer to Appendix 'B' of <br /> this report, to view Julian's findings and results. The USDA Web Soil Survey was also <br /> used to identify the on-site soils, which identified the soils as gravelly sandy loam. Refer <br /> to Figure 4 to view a soils map. However due to the proximity to the bluff to the north it <br /> was determined by the City of Everett that infiltration would not be feasible for this project <br /> and that is the reasoning behind the direct discharge to the base of the bluff. The existing <br /> tight lined drainage design serving this project was laid out per the COE 2010 Stormwater <br /> Management Manual. This project will be designed to meet the 2019 SWMMWW(DOE). <br /> The downstream system for this project is comprised of sheet flow over existing flat <br /> landscaping, with collection in a piped conveyance system as noted above that discharges <br /> Langus Garage 15-0403-L <br /> March,2022 Page 3 <br />