My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2207 GIBSON PL 2022-10-28
>
Address Records
>
GIBSON PL
>
2207
>
2207 GIBSON PL 2022-10-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 9:35:15 AM
Creation date
10/28/2022 9:33:44 AM
Metadata
Fields
Template:
Address Document
Street Name
GIBSON PL
Street Number
2207
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti <br /> • <br /> August 18,2014 <br /> Gibson Bluff <br /> I,&A Job No. 14-056 <br /> Page 2 <br /> PROJECT DESCRIPTION <br /> We understand that the project site will be platted into 7 single-family building lots, with <br /> a new residence constructed on each lot. The proposed residences are to be constructed <br /> on the gently sloped bench top portion of the site. The buildings are to be supported on <br /> perimeter concrete foundation walls and interior columns, beams and bearing walls. The <br /> lots will be accessed via a paved road entering the project site from its south side which is <br /> bounded by Gibson Place, Onsite disposal by infiltration of storm runoff collected over <br /> impervious surfaces is being considered for the proposed development. Gi+ading of the <br /> site would require minor cut and fill. <br /> SCOPE OF SERVICES <br /> Our scope of services for this study comprises specifically the following: <br /> - 1 Review the geologic and soil conditions at the project site based on a published <br /> geologic map. <br /> 2. Explore the subsurface conditions of the site with test borings drilled to a soil <br /> stratum capable of foundation bearing and stormwater disposal by infiltration. <br /> 3. Perform geotechnical analyses and provide geotechnical recommendations for the <br /> proposed development based on subsurface conditions encountered by the test <br /> borings and results of our geotechnical analyses. <br /> 4. Prepare a written report to present our findings, conclusions, and recommendations. <br /> LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.