My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2207 GIBSON PL 2022-10-28
>
Address Records
>
GIBSON PL
>
2207
>
2207 GIBSON PL 2022-10-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 9:35:15 AM
Creation date
10/28/2022 9:33:44 AM
Metadata
Fields
Template:
Address Document
Street Name
GIBSON PL
Street Number
2207
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> August 18, 2014 <br /> Gibson Bluff <br /> • L&A Job No. 14-056 <br /> Page 10 <br /> Intercepting ditches or trench drains should be installed around construction areas, as <br /> required, to intercept and drain away storm nmoff and near-surface groundwater seepage. <br /> Water captured by such ditches or trench drains should be discharged into a nearby store <br /> inlet. The storm inlet should be covered with a non-woven filter fabric sock to prevent <br /> sediments from entering the storm sewer system. The filter sock should be cleaned • <br /> • frequently during construction to• prevent clogging, and should be removed after <br /> completion of construction. <br /> Spoil soils should be hauled off of the site as soon as possible. Spoil soils and imported <br /> structural fill material, if any, should be stored separately on site and covered with plastic <br /> tarps securely weighted down with sandbags. <br /> Excavation and Fill Slopes <br /> - - ---- - Under no circumstance should excavation slopes--be steeper than the limits specified by -- <br /> local, state and federal safety regulations if workers have to perform construction work in <br /> excavated areas: Unsupported temporary cuts greater than 4 feet in height should be no <br /> steeper than IH:1V in topsoil and weathered soil, and no steeper than 3/4H:1V in the <br /> underlying medium-dense to dense Esperance sand soil. The soil units and the stability of <br /> cut banks should be verified by a geotechnical engineer during excavation. <br /> • <br /> Permanent fill embankments required to support structural or traffic load, if any, should <br /> be constructed with compacted structural fill placed over the underlying, undisturbed, <br /> medium-dense to dense, advance outwash sand soil after the surficial unsuitable soils are <br /> LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.