My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA Dept of Transportation WSDOT 10/3/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
WA Dept of Transportation WSDOT 10/3/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 9:38:52 AM
Creation date
10/28/2022 9:38:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA Dept of Transportation WSDOT
Approval Date
10/3/2022
Council Approval Date
9/28/2022
End Date
6/30/2023
Department
Transportation Services
Department Project Manager
Melinda Adams
Subject / Project Title
Green Transportation Planning Grant PTD0554
Tracking Number
0003521
Total Compensation
$75,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> N <br /> O <br /> a <br /> terms, conditions, and in the case of partial termination the portion to be terminated. Written <br /> notification must set forth the reasons for such termination, the effective date, and in case of a <br /> partial termination the portion to be terminated. However if, in the case of partial termination, <br /> WSDOT determines that the remaining portion of the award will not accomplish the purposes for <br /> which the award was made, WSDOT may terminate the award in its entirety. The PARTIES may <br /> terminate this AGREEMENT for convenience for reasons including, but not limited to,the following: <br /> 1. The requisite funding becomes unavailable through failure of appropriation or otherwise; <br /> 2. WSDOT determines, in its sole discretion, that the continuation of the Project would not <br /> produce beneficial results commensurate with the further expenditure of funds; <br /> 3. The CONTRACTOR is prevented from proceeding with the Project as a direct result of an <br /> Executive Order of the President with respect to the prosecution of war or in the interest of national <br /> defense; or an Executive Order of the President or Governor of the State with respect to the <br /> preservation of energy resources; <br /> 4. The CONTRACTOR is prevented from proceeding with the Project by reason of a <br /> temporary preliminary, special, or permanent restraining order or injunction of a court of <br /> competent jurisdiction where the issuance of such order or injunction is primarily caused by the <br /> acts or omissions of persons or agencies other than the CONTRACTOR; or <br /> 5. The State Government determines that the purposes of the statute authorizing the Project <br /> would not be adequately served by the continuation of financial assistance for the Project; <br /> 6. In the case of termination for convenience under subsections A.1-5 above, WSDOT shall <br /> reimburse the CONTRACTOR for all costs payable under this AGREEMENT that the <br /> CONTRACTOR properly incurred prior to termination. The CONTRACTOR shall promptly submit <br /> its claim for reimbursement to WSDOT. If the CONTRACTOR has any property in its possession <br /> belonging to WSDOT, the CONTRACTOR will account for the same, and dispose of it in the <br /> manner WSDOT directs. <br /> B. Termination for Default. WSDOT may suspend or terminate this AGREEMENT for default, <br /> in whole or in part, and all or any part of the financial assistance provided herein, at any time by <br /> written notice to the CONTRACTOR, if the CONTRACTOR materially breaches or fails to perform <br /> any of the requirements of this AGREEMENT, including: <br /> 1. Takes any action pertaining to this AGREEMENT without the approval of WSDOT, which <br /> under the procedures of this AGREEMENT would have required the approval of WSDOT; <br /> 2. Jeopardizes its ability to perform pursuant to this AGREEMENT, United States of America <br /> laws, Washington state laws, or local governmental laws under which the CONTRACTOR <br /> operates; <br /> 3. Fails to make reasonable progress on the Project or other violation of this AGREEMENT <br /> that endangers substantial performance of the Project; or <br /> 4. Fails to perform in the manner called for in this AGREEMENT or fails,to comply with, or is <br /> in material violation of, any provision of this AGREEMENT. WSDOT shall serve a notice of <br /> termination on the CONTRACTOR setting forth the manner in which the CONTRACTOR is in <br /> default hereunder. If it is later determined by WSDOT that the CONTRACTOR had an excusable <br /> reason for not performing, such as events which are not the fault of or are beyond the control of <br /> the CONTRACTOR, such as a strike, fire or flood, WSDOT may: (a) allow the CONTRACTOR to <br /> continue work after setting up a new delivery of performance schedule, or(b)treat the termination <br /> as a termination for convenience. <br /> C. WSDOT, in its sole discretion may, in the case of a termination for breach or default, allow <br /> the CONTRACTOR ten (10) business days, or such longer period as determined by WSDOT, in <br /> which to cure the defect. In such case, the notice of termination will state the time period in which <br /> cure is permitted and other appropriate conditions. If the CONTRACTOR fails to remedy to <br /> WSDOT's satisfaction the breach or default within the timeframe and under the conditions set forth a <br /> in the notice of termination,WSDOT shall have the right to terminate this AGREEMENT without any <br /> further obligation to CONTRACTOR. Any such termination for default shall not in any way operate <br /> I- <br /> Everett Transit Page 7 of 12 <br /> PTD0554 <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.