Laserfiche WebLink
4. SWPPP NARRATIVE <br /> The intent of this section is to provide the information necessary to support the <br /> engineering plans in order to implement a design that will; reduce, eliminate or prevent the <br /> discharge of stormwater pollutants, meet or exceed the water quality and sediment <br /> management standards for the City and State, and prevent adverse impacts to the <br /> receiving waters for this project. Note; this narrative is intended to support the SWPPP <br /> that is included with the Drainage Plans also a part of this submittal package to the City. <br /> A. SITE GRADING/EROSION CONTROL RISK ASSESSMENT <br /> Area proposed to be cleared/worked: 0.14,acres <br /> Average slope for the site: 4% (Area of Disturbance Only) <br /> Erosion Hazard of Soil Low <br /> Critical Areas downslope No <br /> Site is upstream of an ESA Stream No <br /> Based on the above information and the fact that the area of the site to be disturbed is flat <br /> and construction site runoff will pass through silt fencing or other perimeter filtration <br /> features prior to leaving the site, and that if site conditions warrant, additional BMP's can <br /> be:implemented as corrective measures the Risk Category for this site is Low Risk. <br /> B. SWPPP MINIMUM ELEMENTS <br /> 1: Preserve Vegetation and Mark Clearing Limits <br /> The first step in the construction process is for the contractor to flag or fence the limits of <br /> clearing/disturbance (BMP C103) prior to any other construction activity. The engineering <br /> plans locate and provide the square footages for the areas of grading, clearing, impervious <br /> surfaces and-un=disturbed'areaswon-the-proposed-site.-100% of the project parcel will be <br /> cleared or disturbed for this project. <br /> 2: Establish Construction Access <br /> The SWPPP calls for the existing gravel driveway to be used as a construction entrance. <br /> At this time winter work is expected during the wet season. <br /> 3: Control Flow Rates <br /> This project is below the thresholds requiring flow control for the project. <br /> 4: Install Sediment Controls <br /> This site SWPPP proposes to use the existing gravel driveway as a construction entrance <br /> (BMP C105), vegetative buffer (BMP C102), silt fencing (BMP C233) if necessary and <br /> retention of the existing vegetation (BMP C101)that will provide a vegetated strip between <br /> the cleared areas and any property line. The construction of these features should be <br /> cb'mpteted b'efore`the-clearingand-grading-of-the'site. Mulch (BMP C121) will also be <br /> used on the exposed soil as necessary to limit erosion. In addition, streets shall be <br /> cleaned as needed at the end of each work day or throughout the day if dirt and debris is <br /> tracked onto the paved surfaces. <br /> Kedrich SFR 20-0724. <br /> August 2020 Page 6 <br />