• <br /> • <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. Whenever inspection and/or monitoring <br /> reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the <br /> actual discharge of or potential to discharge a significant amount of any pollutant, <br /> appropriate BMPs or design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the site. <br /> The SWPPP"shall`mbe-modified whenever there is a change in the design, construction, <br /> operation,`or maintenance at the construction site that has, or could have, a significant <br /> effect on the discharge of pollutants to waters of the state. <br /> The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include <br /> additional or modified BMPs designed to correct problems identified. Revisions to the <br /> SWPPP shall be completed within seven days following inspection. <br /> 13: Protect On-Site Stormwater Management BMPs for Runoff from Hard Surfaces <br /> The use of on-site management BMP's for this project will allow for the installation of the <br /> perforated stubout connection at the end of the project during final stabilization. That will <br /> protect those areas from-disturbance or compaction. In-addition; the organic content of the <br /> amended soils will be tested and verified prior to final project acceptance. <br /> 5. -SOURCE CONTROL <br /> This project proposes to construct a SFR and driveway. Per Volume 4 of the 2019 DOE <br /> SWMMWW, residential development does not require source control. <br /> 6. PRESERVATION OF NATURAL DRAINAGE SYSTEM <br /> The runoff from the site improvements will either be dispersed on site or tightlined to the <br /> existing storm system via a perforated stubout connection. However, by not grading or <br /> compacting-lhe'majørity'of the pervious'surfaces°to remain"after construction in the area of <br /> disturbance a maximum amount of site runoff from the developed project will be absorbed <br /> and infiltrated into the existing on-site soils. • This will mimic the existing conditions by <br /> maintaining the existing direction and condition of flow from this site. <br /> Kedrich SFR 20-0724 <br /> August 2020 Page 8 <br />