Laserfiche WebLink
4. The comments below were generated from this project's Planning Reviewer. If you have any questions <br /> regarding these comments, please contact Niels Tygesen with the City of Everett Planning Department <br /> (425-257-7168 or NTygesenPeverettwa.gov). <br /> a. Per Everett Municipal Code (EMC) 18.28.080.A.1, street trees are required to be planted at an <br /> average of one tree per thirty feet of frontage, this requires 5 trees along both Seahurst Avenue <br /> and 51st Place SW, and 8 trees along 52nd Street SW. <br /> b. Street trees are required to be a minimum of 6 feet tall at dime of planting. • <br /> c. Per EMC 18.28.080.D, ornamental shrubs, living groundcover and sod is required at the street <br /> entry. For the subject project this is interpreted as street frontage landscaping 5 feet in width for <br /> each lot. Shrubs shall be at least 2-gallon sized, at least 18 inches high at time of planting, and <br /> tvfz'� planted at a density of 5 shrubs per 100 square feet. Living geoundcover may either be 234 inch <br /> � <br /> tea. pots spaced twelve inches on center,4-inch pots spaced 18 inches on center,and/or 1-gallon pots <br /> ,% h spaced twenty-four inches on center in order to cover 90 percent of the required area within 3 <br /> \7 years.This application may also satisfy the landscaping requirements of EMC 18.28.080.F. <br /> oQ, ` ecr d. All landscaping shall be located outside of the public right-of-way unless approved by the city <br /> c p, engineer. <br /> �yv° e. All landscaping must be installed prior to final of Public Works and/or building permits. Inspection <br /> of the plantings is required when completed. Contact the Planning Division to schedule an <br /> . inspection. <br /> f. An itemized cost estimate of the planting materials and installation for the landscaping will be <br /> required at time of Public Works permit final or building permit submittal. <br /> g. A two-year maintenance assurance device for the required landscaping, no less than 10%of the <br /> cost of the planting material and installation, will be required to be submitted before building <br /> permit final for all new landscaping. Request the form at time of Public Works'permit final or <br /> building permit submittal. <br /> h. If any of the foundations for the dwelling units on Lots 3, 4, 5, and 6 will be within 6 feet of a <br /> property line, a survey will be required prior to footing inspection. <br /> / 5. The comments below were generated from this project's Traffic Reviewer. If you have any questions <br /> regarding these comments,please contact Michael Brick with the City of Everett Public Works Department. <br /> (425-257-7790 or MBrick@everettwa.gov). <br /> -t—u a. Thew a tcn-foot Right-of-Way dedication along the entire frontage of Seahurst Ave. <br /> b. Show a five-foot Right-of-Way corridor easement along the entire frontage of 52"d ST SW. <br /> l 1v C r '1 C7 ri}(�,• t{ i r <{ L-17 <br /> <A-T{c gN lZt c v ��7 f� C , <br /> Cor( detk 0✓1 µp <br /> 0 3200 Cedar Street 0 425.257.8810 O everetteps@everettwa.gov <br /> Everett, WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 2 of 2 <br />