Laserfiche WebLink
• <br /> Permit Inspections <br /> VE R E T T city of Everett <br /> WASHINGTON <br /> 7/16/2021 7/16/2021 PW 09- JIM KNAPPERT PARTIAL <br /> DOWNSPOUTS APPROVAL <br /> Notes: <br /> UTIL 04-SIDE <br /> 7/20/2021 7/20/2021 SEWER JIM KNAPPERT PARTIAL <br /> CONNECTION APPROVAL <br /> Notes: <br /> 11/4/2021 11/4/2021 PW 07-STORM JIM KNAPPERT PARTIAL <br /> APPROVAL <br /> Notes: <br /> PW 18-CURB OR <br /> 11/4/2021 11/4/2021 SIDEWALK JIM KNAPPERT PARTIAL <br /> SUBGRADE APPROVAL <br /> Notes: <br /> 11/5/2021 11/5/2021 PW 07-STORM JIM KNAPPERT PARTIAL <br /> APPROVAL <br /> Notes: <br /> NPDES MID <br /> 12/1/2021 12/1/2021 PROJECT JIM KNAPPERT APPROVAL <br /> INSPECTION <br /> Notes: <br /> PW 18-CURB OR <br /> 3/24/2022 3/24/2022 SIDEWALK JIM KNAPPERT PARTIAL <br /> SUBGRADE APPROVAL <br /> Notes: <br /> PW 16-CONCRETE <br /> 3/28/2022 3/28/2022 FORMWORK JIM KNAPPERT PARTIAL <br /> EVALUATION APPROVAL <br /> Notes: <br /> 3/30/2022 3/30/2022 PW 19-CURB OR JIM KNAPPERT PARTIAL <br /> SIDEWALK FINAL APPROVAL <br /> Notes: <br /> PW 18-CURB OR <br /> 3/31/2022 3/31/2022 SIDEWALK JIM KNAPPERT APPROVAL <br /> SUBGRADE <br /> Notes: <br /> Printed:Thursday,08 September,2022 2 of 3 — SU PER ION <br />