Laserfiche WebLink
8/25/2022 Page 2 <br /> City of Everett <br /> 2:53:02PM <br /> INSPECTION ACTIVITY REPORT _ .__ . <br /> 10/19/2021 10/19/2021 BLDG KMK APPROVAL crawl space area ok 10/17/2021 11:09 AM Peter Stepanchenko <br /> 05-UNDERFLOOR <br /> Contact Name:Peter Stepanchenko <br /> Site Address:4909 NARBECK RD <br /> Phone:4254226339 <br /> e-Mail:peter_step@comcast.net <br /> (10/19/2021 2:31 PM KMK) <br /> Crawlspace area OK <br /> 12/13/2021 12/13/2021 BLDG KMK APPROVAL as notes 12/12/2021 8:53 PM Peter Stepanchenko <br /> 07-EXTERIOR <br /> Contact Name:Peter Stepanchenko <br /> Site Address:4909 NARBECK RD <br /> Phone:4254226339 <br /> e-Mail:peter_step@comcast.net <br /> (12/13/2021 4:29 PM KMK) <br /> as noted: <br /> Finish adding LTP 4's tieing 2nd and third <br /> floor together. <br /> 12/13/2021 12/13/2021 BLDG 14-ROOF KMK APPROVAL eTRAKiT Inspection 12/12/2021 8:56 PM Peter Stepanchenko <br /> NAILING Request <br /> Contact Name:Peter Stepanchenko <br /> Site Address:4909 NARBECK RD <br /> Phone:4254226339 <br /> e-Mail:peter_step@comcast.net <br /> 2/28/2022 2/28/2022 BLDG KMK APPROVAL eTRAKiT Inspection 2/27/2022 11:24 AM Peter Stepanchenko <br /> 11-INTERIOR Request <br /> Contact Name:Peter Stepanchenko <br /> Site Address:4909 NARBECK RD <br /> Phone:4254226339 <br /> e-Mail:peter_step@comcast.net <br /> 2/28/2022 2/28/2022 BLDG 09-FIRE KMK CORRECTION eTRAKiT Inspection 2/27/2022 11:23 AM Peter Stepanchenko <br /> STOPPING/BLOCK Request <br /> Contact Name:Peter Stepanchenko <br /> Site Address:4909 NARBECK RD <br /> Phone:4254226339 <br /> e-Mail:peter_step@comcast.net <br /> (2/28/2022 3:02 PM KMK) <br /> Air seal all plate penetrations.Do not <br /> insulate until they have been inspected. <br /> 2/28/2022 2/28/2022 BLDG KMK CORRECTION see notes 2/27/2022 11:22 AM Peter Stepanchenko <br /> 08-FRAMING <br /> Contact Name:Peter Stepanchenko <br /> Site Address:4909 NARBECK RD <br /> Phone:4254226339 <br /> e-Mail:peter_step@comcast.net <br /> (2/28/2022 3:02 PM KMK) <br /> 1.Check and tighten all anchor bolts at <br /> garage door wall <br /> 2.Air seal all plate penetrations <br /> 3.OK to insulate double shear wall only. <br /> 4.OK to apply closed cell foam insulation <br /> on underside of roof sheathing <br /> Reschedule framing and air seal/fire block <br /> inspection when ready <br /> 3/8/2022 3/8/2022 BLDG KMK APPROVAL eTRAKiT Inspection 3/5/2022 10:31 AM Peter Stepanchenko <br /> 08-FRAMING Request <br /> Contact Name:Peter Stepanchenko <br /> Site Address:4909 NARBECK RD <br /> Phone:4254226339 <br /> e-Mail:peter step@comcast.net <br /> INSP12 <br />