Laserfiche WebLink
MR #2 Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters. A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performing the work at <br /> the jobsite for reference and updated during the duration of construction. <br /> Task 1: Describe the project during construction <br /> (You may attach a narrative that answers the following questions) <br /> Nature and purpose of the construction project: <br /> Construct a new 1910sf roof area SFR <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> Narbeck road will be slightly affected by the new driveway and storm drainage. <br /> How upstream drainage areas may affect the site: <br /> No impact is expected from the upstream properties <br /> Downstream drainage leading from the site to a receiving body of water: <br /> The site will drain to Narbeck Road which drains to W Muklteo Blvd which drains to the Puget Sound <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> NONE <br /> Special requirements and provisions for working near or within critical areas: <br /> NONE <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 7 <br />