Laserfiche WebLink
January lt=..sp.rq <br /> Palle xaf4 <br /> Uratrexl Geologic Fvaluatina <br /> If and v atiatiors or undesirable cendntions are enstruntere'i during construction,we should be <br /> notified so that supplementai rtxxtnrmerslstions ran be tootle. If main cowtrnints or <br /> groundmttcr conditions do not perntia temporary slopes to be cut to the maximum angles atkowed <br /> by. the WAC.team irarr shoring systems may be rr(luiresl, <br /> The contractor should?.responxikt ford rlc ping temporary shoring systems.if need FYe <br /> re'eoano>t,ial that Cobalt Gesuraacncet and the proaei=t struettural'sngineer rei.dety temporary <br /> :shoring'designs pnrrr to installation.to wally the suitabditt of the proprrsrti syst.ems. <br /> Stormwotor Feas b ty <br /> hue to the location and proxinrity of the site to landslide and stccp elope hazard arcaam Infiltration <br /> pf.ttrr r wataer run.0 is MMX recommended. We recommend dire t ct nne,tinn to City t€>rtm.rater <br /> infrastructure. <br /> Erosion and Sediment Control <br /> Rrcrston oath sediment control(ESC)is teed to reduce the transportation of e.rtxted sediment to <br /> wetlands. streauu, lake , drainage +,'status. and adjacent pmpert t-. Erosion and sediment <br /> control trwasures, should he implemented,anti these rarenkures should he in general acxorrLtucr <br /> With; local regulations, At zi minimum, the billowing b,e.it. ri-i temmentldtions should he <br /> incorporated into the design of the;em'Fan anti sediment txmtrr l featows for the site, <br /> • schedule the soil,foundation,utility,arid other nark retiring s.Acovntia a or the d`rstutitmice <br /> of the site sails,to take place during the.dry season (generally M.s..through Septerrib+rl. <br /> #Io»'e^tsar,lvnavidtd lareeautienrs we taken tr:ting Best 111anugcmerit l'ravtiee t tfS1W') grading <br /> activities can ire t'onrpl ted tinning thw wet scson.(renerutlt tk totirr through April), <br /> • All site:utuirl alrorrid t>6^corrpicter tn.l staltitih.al yuiekty as possible. <br /> « .Additional t ri iets r crr,ciun and sediment control features may be required to reduce the <br /> p isibility of.edinwitt eetteririlt the 45Arfa ce waiter.This tnay Fret ttd1'addit c>nui.silt fences,tilt <br /> fences with a higher Apparent(r'c'nun Sine(0S).ounstriletion of ri txnrxn,ear other filer too,. <br /> eostems <br /> • .;tr:,cV runoff geottrutxt by demurring diischarge should be trraxxt the ugh corastructi" tit <br /> sediment trap if thus is sufficient sprcu. If space is hunted other nitration trrethods+.iII teesi <br /> is l ina+krperrxtcd, <br /> Closure <br /> The itif rrntat on presented !mein fw.sis.1 upon professional interpretation standard <br /> practices and a cic'eree of conservatism]deemed pu,per for this project vitt:emphasize that this <br /> report is.°a id for this project as outlined above owl for the current site ccnriititarvi,and should riot <br /> be used for any other site. <br /> w-v.-ww.trt,il tgtew.com f 2ti6);i31-to47 <br /> 6/g". AE2018-97 <br />