Central Paving LLC 10/25/2022 Change Order 1
>
Contracts
>
Capital Contract
>
Central Paving LLC 10/25/2022 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 3:08:54 PM
Creation date
10/28/2022 3:08:46 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving LLC
Approval Date
10/25/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003375
Total Compensation
$79,228.32
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Central Paving 6/16/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No. 001 <br /> Change Order Effective Date: August 15, 2022 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The amount of this Change Order for the changes described in Exhibit A, <br /> represents complete compensation for the changes described in Exhibit A, <br /> including all direct and indirect costs and impacts. The Contract Sum shall be <br /> adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which <br /> the Mayor or his designee is authorized to direct Contractor to perform <br /> additional work. In calculating such threshold amounts, Washington State <br /> sales tax, as applicable to the Work, has been considered. <br /> 4. The Contract Time of the Contract shall be adjusted to the extent described in <br /> this Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, <br /> this Change Order, the work described in Exhibit A, and all work and actual or <br /> constructive changes that occurred or began prior to the date of this Change <br /> Order, including, but not limited to, claims for equitable adjustment of time and <br /> compensation, delay, impact, overhead, or inefficiencies. This provision does <br /> not apply to requests for equitable adjustment of time or price for which the <br /> Contractor timely and properly provided notice of a differing site condition, <br /> protest, dispute, claim or Contract Claim as required by the Contract <br /> Documents. If the Contract Documents establish a time period for notice of a <br /> differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the <br /> date of this Change Order, then this provision does not apply if the Contractor <br /> timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to <br /> the extent explicitly provided herein. <br /> 7. Signature(s) on this Change Order may be by pdf, email, fax or other electronic <br /> means, in which case such signature(s) will have the same effect as an original <br /> ink signature. This Change Order may be signed in counterparts, each of <br /> which shall be deemed an original, and all of which, taken together, shall be <br /> deemed one and the same document. <br />