My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving LLC 10/25/2022 Change Order 1
>
Contracts
>
Capital Contract
>
Central Paving LLC 10/25/2022 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 3:08:54 PM
Creation date
10/28/2022 3:08:46 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving LLC
Approval Date
10/25/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003375
Total Compensation
$79,228.32
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Central Paving 6/16/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No. 001 <br /> Change Order Effective Date: August 15, 2022 <br /> ATCH 1 <br /> Silverlake Drive Added Work <br /> Schedule G <br /> Item <br /> No. Bid Item Unit Unit Price Est. <br /> 1 Mobilization L.S. 1 19780 19,780.00 <br /> 2 Flaggers(Minimum Bid Prevailing Wage) Hour 103 77 7,931.00 <br /> 3 Uniformed Police Officer Hour <br /> 4 Project Temporary Traffic Control L.S. 1 6750 6,750.00 <br /> 5 Portable Changeable Message Sign Hour 110 16.5 1,815.00 <br /> 6 Planing Bituminous Pavement S.Y. 2081 2.72 5,660.32 <br /> 7 Additional Planing Bituminous Pavement S.Y. 313 1 313.00 <br /> 8 HMA Class 1/2 Inch, PG 64-22 Ton 255 99 25,245.00 <br /> 9 Street Cleaning Hour 20 181 3,620.00 <br /> 10 Adjust Manhole Each 10 100 1,000.00 <br /> 11 Adjust Catch Basin/Inlet to Grade Each 3 100 300.00 <br /> 12 Adjust Valve Box to Grade Each 3 100 300.00 <br /> 13 Adjust Existing Monument Castings to Grade Each 2 100 200.00 <br /> 14 Profile Plastic Line L.F. 0 <br /> 15 Profile Plastic Wide Line L.F. 0 <br /> 16 Plastic Wide Line L.F. 0 <br /> 17 Plastic Traffic Arrow Each 0 <br /> 18 24" Plastic Crosswalk Line S.F. 0 <br /> 19 24" Plastic Stop Bar L.F. 0 <br /> 0 Paint Line L.F. 0 <br /> 20 Plastic Line L.F. 0 <br /> 21 Plastic Traffic Letter Each 0 <br /> 22 Plastic Bicycle Lane Symbol Each 0 <br /> 23 Plastic Sharrow Each 0 <br /> 24 Plastic Bicycle Detector Symbol Each 0 <br /> 0 Plastic Railroad Crossing Symbol Each 0 <br /> 25 Raised Pavement Markers,Type 2 Hund 0 <br /> 26 Centerline Rumble Strip Mile 0 <br /> 27 Temporary Pavement Markings L.F. 0 <br /> 28 Removing Cement Conc.Sidewalk S.Y. 0 <br /> 29 Vehicle Loop Detectors L.F. 0 <br /> 30 Loop Lead-In Detector Cable L.F. 0 <br /> 31 Conduit Pipe,2" Diameter L.F. 0 <br /> 32 Video Detection System L.S. 0 <br /> 0 Replace Junction Box Each 0 <br /> 33 Spill Prevention Control Plan L.S. 0 <br /> 34 Resolve Above Ground Conflicts Est. 1 5000 5,000.00 <br /> 35 Erosion/Water Pollution Control Est. 1 1000 1,000.00 <br /> 36 Asphalt Cost Price Adjustment Calc. 1 314 314.00 <br /> TOTAL SCHEDULE G $ 79,228.32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.