My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1033 51ST PL SW 2022-10-28
>
Address Records
>
51ST PL SW
>
1033
>
1033 51ST PL SW 2022-10-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 4:11:37 PM
Creation date
10/28/2022 4:07:56 PM
Metadata
Fields
Template:
Address Document
Street Name
51ST PL SW
Street Number
1033
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A � . <br /> i • <br /> '" 'F'' '�'.�A ' 2707 Wetmore Avenue <br /> a Evrett, WA 98201 <br /> ENGINEERING, INC. t 425.387.3820 <br /> f 425.259.1958 <br /> April 7, 2021 .5 y. , a <br /> L 1.it4- dV rLt > dr , a°,,�,;,p1 E ©EO9Ly <br /> City of Everett °' <br /> Permit Services �'' <br /> 3200 Cedar Street ®4�t2�Zp2r _ <br /> Everett,WA 98201 i APR 0 9 2021 <br /> tisTb`_OFEVEREs �;E�l; e`,jr ris Feet, <br /> p"1 ,° 4-c3ctj' CITY OF EVERETT <br /> RE: Drainage Letter-Seahurst SP Lot 5 Permit Services <br /> B2102-061 <br /> Dear Staff, <br /> This letter is intended to provide confirmation that the proposed site plan for Lot 5 of the <br /> Seahurst SP project (Permit No. 1906-021) has been reviewed by Omega Engineering, Inc. <br /> (engineer of record) to verify the proposed improvements under the building permit application <br /> for this project meet the design requirements provided in the approved drai a?-. e f-, 4�'r1 rig <br /> project and the site areas do not exceed the amount allowed in the approve -�;j:,. to r „� f -� <br /> the SP project. <br /> Seahurst SP Drainage Overview JUL 16;2021 J <br /> J <br /> The approved Seahurst SP was designed at the time of permit application/I r dQtFnEMBF2ETT <br /> 2014 DOE Surfacewater M.anagement.Manual for Western.Washington (SWMM iiisSe itises <br /> Chapter 4 of the City of Everett Design and Construction Standards and Specifications in place <br /> at that time. 'The proposed on-site impervious surfaces (roof and driveway) were designed to <br /> fully infiltrate on-site up to the 100-year storm event. <br /> The City has since adopted the 2019 DOE SWMMWW which is in place at the time of building <br /> permit application. With regard to site drainage design the 2019 manual much like the 2014 <br /> manual encourages LID BMPs to be implemented when found to be feasible. So, the use of <br /> roof downspout infiltration and permeable pavement for on-site impervious surfaces is still <br /> included as stormwater mitigation options in the 2019 manual. <br /> Finally, Post-Construction Soil.Quality and Depth (BMP T5.13) will still be required to be applied <br /> to the disturbed/landscaped portions of the parcel at the end of the project. <br /> Design Site Areas <br /> The total on-site proposed impervious surfaces for the Seahurst SP, including lots 3-6, totaled <br /> 11,695 sf (0.27 acres) with an additional 2,900 sf for work within the R/W including curb, <br /> sidewalk and driveway approaches. This can be found in Sections 3 & 9 of the approved <br /> Seahurst Drainage report. <br /> The site plan for the Lot 5 building permits calculates that there is 3,076 sf of total impervious <br /> surfaces proposed which is a combination of 2,168 sf (roof), and 908 sf (driveway). For the <br /> driveway 470 sf is on-site and permeable pavement and the remaining 438 sf is in the RAN. So <br /> the total on-site impervious surfaces proposed for Lot 5 is 2,638 sf. <br />
The URL can be used to link to this page
Your browser does not support the video tag.