My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1029 52ND ST SW 2022-10-31
>
Address Records
>
52ND ST SW
>
1029
>
1029 52ND ST SW 2022-10-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2022 12:12:26 PM
Creation date
10/31/2022 12:01:23 PM
Metadata
Fields
Template:
Address Document
Street Name
52ND ST SW
Street Number
1029
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10: Control DeWatering <br /> DeWatering may be necessary for this project. However, the existing vegetation retained <br /> on site would be available to spread any water from construction for filtration and disposal. <br /> 11: Maintain BMPs <br /> The construction supervisor will ' be responsible for maintaining all BMPs during <br /> construction and working with the City to relocate or add BMPs as necessary as site <br /> conditions change. BMPs should be inspected and maintained as needed after every rain <br /> event producing more than '/d" of rain in a 24-hour period. Also, BMPs shall be inspected <br /> on a weekly basis even if site work is not occurring. <br /> 12: 'Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. <br /> Whenever inspection and/or monitoring reveals that the BMPs identified in the <br /> Construction SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design changes shall <br /> be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the <br /> short plat. The SWPPP shall be modified whenever there is 2'change in the design, <br /> construction, operation, or maintenance at the construction site that has, or could have, a <br /> significant effect on the discharge of pollutants to waters of the state. <br /> The SWPPP shall be modified if, during inspections or investigations, conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include <br /> additional ,or..modified BMPs designed to correct problems identified." Revisions to the <br /> • SWPPP shall be completed within seven days following inspection. • <br /> 5. SOURCE CONTROL(MR#3) <br /> This project proposes to construct future residential development. Per Volume 1 of the <br /> .2014 DOE manual, residential development does not require source control. <br /> Seahu'rst'SP 18-0727Page 10 <br /> September 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.