Laserfiche WebLink
' e <br /> • <br /> TABLE OF CONTENTS PAGE NO. <br /> ACRONYMS AND ABBREVIATIONS <br /> -1.0_ .,INTRODUCTION 1 <br /> 2.0 PROJECT UNDERSTANDING 1 <br /> 3.0 PURPOSE AND SCOPE 1 <br /> 4.0 SITE CONDITIONS 2 <br /> 4.1 Surface Conditions 2 <br /> 4.2 Subsurface Conditions 2 <br /> 4.3 Groundwater 3 <br /> 4.4 Seismicity • <br /> • 5.0 INFILTRATION TESTING 6.0 LABORATORY TESTING 3 3 <br /> 7.0 DESIGN 4 <br /> 7.1 Seismic Design Criteria 5 <br /> 7.2 Shallow Foundations 5 <br /> 7.3 Floor Slabs 5 <br /> 7.4 Retaining Structures 6 <br /> 7.5 Infiltration 7 <br /> 9 <br /> 8.0 CONSTRUCTION 9 <br /> 8.1 Site Preparation 9 <br /> 8.2 Drainage Considerations TO <br /> 8.3 Excavations 1 0 <br /> 8.4 Temporary Slopes 1 <br /> 11 <br /> 8.5 Erosion Control 8.6 LID Infiltration Elements 11 <br /> 121 <br /> 9.0 MATERIALS 12 <br /> 9.1 On-Site Soil• 12 <br /> 9.2 Imported Granular Material 13 <br /> 9.3 Stabilization Material 13 <br /> 9.4 Drain Rock 13 <br /> 9.5 Floor Slab and.Pavement Base Rock 14 <br /> 9.6 Geotextiles 14 <br /> 10.0 • OBSERVATION OF CONSTRUCTION 14 <br /> • 11.0 LIMITATIONS <br /> REFERENCES 16 <br /> FIGURES V'rclniW Map Figure 1 <br /> Figure 1 <br /> Site Plan <br /> GEODESIGN= NwHome-1-01 101618 <br />