My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1029 52ND ST SW Geotech Report 2022-10-31
>
Address Records
>
52ND ST SW
>
1029
>
Geotech Report
>
1029 52ND ST SW Geotech Report 2022-10-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2022 12:08:26 PM
Creation date
10/31/2022 12:06:56 PM
Metadata
Fields
Template:
Address Document
Street Name
52ND ST SW
Street Number
1029
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br /> This report presents the results of GeoDesign's geotechnical investigation for the proposed <br /> Seahurst short plat project located northeast of the intersection of Seahurst Avenue and <br /> 52'Street SW4n,Everett,Washington. The existing site consists of two single-family residences <br /> with associated utilities at 5125 and 5133 Seahurst Avenue (Snohomish County Tax Parcel <br /> Numbers 004166-000-007-00 and 004166-000-008-00). The site location relative to <br /> surrounding physical features is shown on Figure 1. <br /> Acronyms and abbreviations used herein are defined above, immediately following the Table of <br /> Contents. <br /> 2.0 PROJECT UNDERSTANDING <br /> The proposed project consists of subdividing the two properties into a six-lot short plat that will <br /> be accessible from 52nd Street SW and 51 st Place SW(Figure 2). <br /> The proposed development will include construction of four additional single-family residences <br /> and supporting utilities. Based on the preliminary site map provided by Alpha Subdivision Pros <br /> Inc. (ASPI),the single-family residences will consist of tuck-under structures with a lower-level <br /> garage and stairs up to the main living space. We understand that LID design elements such as <br /> infiltration trenches, permeable pavement, and bioretention areas are being considered to <br /> manage stormwater generated by the proposed development. Based on the City of Everett's <br /> (City) Infiltration Feasibility Map, the site is mapped as "Potentially Feasible for Infiltration"(City <br /> of Everett, 2018a). <br /> 3.0 : PURPOSE AND SCOPE <br /> The purpose of our geotechnical engineering services was to characterize subsurface conditions <br /> and develop geotechnical recommendations for use in.the design and construction of the <br /> proposed development. The specific scope of our services is summarized as follows: <br /> • Reviewed preliminary project plans and readily available geologic information for the site <br /> vicinity. <br /> • Observed five test pits excavated within.the.project..area to depths.ranging between 4.0 and <br /> 10.0 feet BGS. <br /> • Conducted PITs in two test pits in general accordance with the 2014 Stormwater <br /> Management Manual for Western Washington (DOE, 2014), which the City has adopted. <br /> • Prepared this report that presents our findings, conclusions, and recommendations. <br /> 4:0 : r SlTECONDITIONS <br /> Site conditions were observed during our two visits to the site to mark exploration locations for <br /> utility locates and to complete the subsurface explorations. Subsurface conditions were <br /> evaluated by excavating five test pits and reviewing existing geologic maps for the project area. <br /> G EODESIGN2 1 NWHome-1-01:101618 <br />
The URL can be used to link to this page
Your browser does not support the video tag.