Laserfiche WebLink
40 60 05 COMBINED SEWER CONTROL GATES <br /> 40 90 00 INSTRUMENTATION FOR PROCESS CONTROL: BASIC REQUIREMENTS <br /> 40 90 OOA LOOP CHECK-OUT SHEET <br /> 40 90 OOB INSTRUMENT CERTIFICATION SHEET <br /> 40 90 OOC FINAL CONTROL ELEMENT CERTIFICATION SHEET <br /> 40 90 05 CONTROL LOOP DESCRIPTIONS <br /> 40 91 10 PRIMARY ELEMENTS AND TRANSMITTERS <br /> 40 94 43 PROGRAMMABLE LOGIC CONTROLLER (PLC) CONTROL SYSTEM <br /> 40 98 00 CONTROL PANELS AND ENCLOSURES <br /> 40 99 00 CONTROL EQUIPMENT <br /> 43 21 00 PUMPING EQUIPMENT: BASIC REQUIREMENTS <br /> 43 21 13 PUMPING EQUIPMENT: INLINE CENTRIFUGAL PUMPS <br /> 43 21 22 PUMPING EQUIPMENT: SUBMERSIBLE NON-CLOG <br /> 43 2143 PUMPING EQUIPMENT: SUMP <br /> 44 11 10 FAN <br /> 44 11 20.01 ACTIVATED CARBON ODOR CONTROL UNIT <br /> 46 46 13 TIPPING BUCKETS <br />