Laserfiche WebLink
the upstream and downstream collection system functions without sanitary sewer overflows, while <br /> achieving CSO compliance at SR07 and SR08 by the year 2027. <br /> This amendment consists of detailed design and bidding period support services for Alternative 4, as <br /> defined in Technical Memorandum, Task 270—Alternatives Development and Analysis, prepared by <br /> Jacobs (Consultant) in January 2022.The Project will generally consist of: <br /> • A new 1.8 million gallon (MG) underground cast-in-place CSO storage tank,with associated new <br /> electrical, instrumentation & controls, mechanical, and civil/structural work elements at the <br /> City-owned property north of 36th Street and just south of the Everett Station Park and Ride Lot <br /> B (parcel#29052900201200). <br /> • Modifications to its existing combined sewer(CS) system to include: <br /> o Modifications to the existing 36th Street regulator structure that would provide a means <br /> for diverting combined sewer flows to the new CSO tank. <br /> o Modifications to the existing Pacific Regulator that would provide a means for diverting <br /> combined sewer flows to a new approximately 48-inch diameter pipe along Pacific Ave. <br /> • Installation of approximately 1,000 LF of sewer pipe along Pacific Avenue to increase sewer <br /> capacity(install new parallel pipe or replace and upsize existing pipe). <br /> 2. ASSUMPTIONS FOR AMENDMENT NO. 1 <br /> This scope of work is based on the following assumptions: <br /> • This project includes a comprehensive detailed design effort; however,for bid assistance,the <br /> Consultant will have a minor supporting role only. <br /> • Budget for the project scope for detailed design through bidding is based on a project schedule <br /> of 20 months, commencing with notice-to-proceed in November 2022. Bidding period support <br /> services is subject to the level of effort requested by the City and budget allocated. <br /> • Deliverables will be in electronic format,with exception of bid set documents. <br /> • Meetings will be held virtually. <br /> • The Consultant may shift budget between work tasks in order to adjust for differences in scope <br /> or level of effort—planned versus actual with approval of City's Project Manager. Consultant <br /> will discuss any proposed budget adjustments with the City in advance. <br /> • The City will provide certain documents including, but not limited to,the list in Section 3. <br /> • The City's CAD Standards will be used. <br /> • Design and Standard Specifications and Details shall utilize: <br /> o City of Everett's Design and Construction Standards. <br /> o The City's master specifications and applicable additional provisions to the Standard <br /> Specifications. <br /> o Consultant standard specifications in 2004 CSI format. <br /> o Additional design references as may be furnished by the City such as examples from <br /> previous projects. <br /> • All City-supplied information/ references will be provided to the Consultant within two weeks of <br /> Notice to Proceed on this Amendment. <br /> April 2022 Page 2 of 35 Jacobs Engineering Group <br />