My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Inc. 11/3/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Inc. 11/3/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 10:25:50 AM
Creation date
11/10/2022 10:24:31 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Inc.
Approval Date
11/3/2022
Council Approval Date
2/3/2021
End Date
12/31/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
CSO Storage at 36th ST Detailed Design
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002775
Total Compensation
$2,814,996.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Jacobs Engineering Group Inc. 2/8/2021
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Characterize soil conditions and evaluate how ground water depths and flows impact pipeline <br /> design and construction considerations for the purpose of planning excavation support systems, <br /> dewatering system construction considerations,trench backfill, pipe loading, subgrade <br /> preparation, and development of subgrade repair strategies. Additionally, seismic design <br /> assessments will be performed to include seismic hazards such as liquefaction. <br /> 2. Prepare geotechnical design and recommendations report including: <br /> o General descriptions of site conditions and subsurface soil conditions encountered <br /> based on findings presented in the Geotechnical Data Report. <br /> o Provide recommendations for earthwork and site preparation including suitability of on- <br /> site soils for reuse in trench backfill, placement and compaction of backfill, and <br /> mitigation of unsuitable soil conditions. <br /> o Perform engineering analyses and provide conclusions and recommendations <br /> foundation support, hydrostatic uplift considerations and construction considerations <br /> including dewatering and trench shoring, if necessary. <br /> o Pipeline design; and conventional trenching techniques including the following: <br /> • Geotechnical parameters for construction contractor's shoring design <br /> including lateral pressures and temporary shoring considerations. <br /> • Excavation and temporary slope considerations. <br /> • Analyses to assist in pipeline material,wall thickness,and backfill designs. <br /> • Construction dewatering considerations including depth to groundwater and <br /> estimated permeability coefficients based on laboratory sieve analyses. <br /> o Evaluate and provide recommendations for pavement subgrade preparation and <br /> confirm City pavement design thickness standards are appropriate.This will include <br /> strategies for removal and replacement of soft subgrade soils using geotextiles or <br /> various import materials. <br /> 3. Prepare draft and final Geotechnical Engineering Report for Pipeline. <br /> Deliverables(Pacific Ave. Pipeline): <br /> 1. Exploration Plan Pipeline—1 electronic file (PDF). <br /> 2. Draft Geotechnical Data Report Pipeline alignment—1 electronic file (PDF). <br /> 3. Final Geotechnical Data Report Pipeline alignment—1 electronic file (PDF). <br /> 4. Draft Geotechnical Engineering Report Pipeline alignment—1 electronic file (PDF). <br /> 5. Final Geotechnical Engineering Report Pipeline alignment—1 electronic file (PDF). <br /> 6. Minor Updates to Geotechnical Engineering Report at 60%and 90%, as needed—1 electronic <br /> file (PDF). <br /> Task 2410—Preliminary Design (30%) <br /> The purpose of this task is to complete 30% level preliminary design as detailed in the Preliminary <br /> Engineering Report. <br /> Assumptions: <br /> • See Subsection 2, "Assumptions for Amendment No. 1" in front of this document. <br /> April 2022 Page 14 of 35 Jacobs Engineering Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.