My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/11/02 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/11/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 2:45:35 PM
Creation date
11/15/2022 2:15:23 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />April 2022 Page 8 of 35 Jacobs Engineering Group <br /> <br /> <br />Assumptions: <br />• City to provide electronic GIS base map of project area including the following information: <br />connection points, water system, sewer system, storm water system, buildings, quarter <br />sections, street centerlines, control monuments, paved streets, alleys, bridges, parcels, lots, <br />right-of-way, and utility easements. <br />• City to provide data on at least two known monuments as close to the project limits as possible. <br />• City to provide electronic templates for plan sheets, including City CAD and survey standards on <br />CD. <br />• City to provide field book for design survey. <br />• City to provide record drawings for City water, sewer, and storm drains within the project area. <br />• The following items are not included in this scope of work: <br />o Cadastral surveying to determine actual property and right of way lines. <br />o Construction staking. The Contractor will be responsible for staking the proposed water <br />alignments based on reference points set by City’s selected surveyors during the initial <br />topographic survey. <br />o Construction surveying <br /> <br />Activities: <br />Survey (Subconsultant). <br />• Subconsultant will provide survey services necessary to design the proposed infrastructure <br />improvements. <br />• Utility Location and Research <br />o Contract with locating servicing company to provide utility locates for all non-city <br />primary and secondary utilities, including services. <br />o Coordinate with City Utilities to provide water, sewer and storm sewer mains and <br />service locates. <br />o Research, contact, and coordinate with utility companies to obtain utility base maps <br />and/or record drawings for existing power, gas, telephone, and cable utilities within the <br />vicinity of the project area. <br />• Topographic Survey <br />o Provide topographic survey in accordance with “Appendix A – SURVEY STANDARDS” <br />from the latest edition of the City of Everett Standards Manual for CIVIL CAD and <br />Graphics, unless modified in this document. <br />▪ Latest copy of the City of Everett Standards Manual for CIVIL CAD and Graphics <br />containing Appendix A can be found using the following link: <br />https://www.everettwa.gov/1711/CAD-Standards <br />o Provide for traffic control while working along City streets. At minimum provide vehicle <br />with flashing light(s) and warning signage such as “Survey Work Ahead.” <br />o Set additional temporary benchmarks as necessary to facilitate construction of the <br />project, including at each street intersection and at the midpoint between intersections
The URL can be used to link to this page
Your browser does not support the video tag.