My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2702 BROADWAY 2022-12-30
>
Address Records
>
BROADWAY
>
2702
>
2702 BROADWAY 2022-12-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2022 10:35:25 AM
Creation date
11/16/2022 9:38:44 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2702
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ir. <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E1911-067 Description:ADD 5 CIRCUITS,REPLACE LIGHTS <br /> Applied:11/12/2019 Approved: 12/11/2019 Site Address:2702 BROADWAY <br /> Issued:12/11/2019 Finaled: City,State Zip Code:EVERETT,WA 98201 <br /> Status: PERMIT ISSUED Applicant:3 PHASE ELECTRIC LLC <br /> Parent Permit: B1910-028 Owner:NAT SQUARED LLC <br /> Parent Project: Contractor:3 PHASE ELECTRIC LLC <br /> Details: <br /> ADD 5 CIRCUITS,REPLACE LIGHTS <br /> f., <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 12/12/2019 12/12/2019 ELEC 09-FINAL STEVE BANKS NOT READY <br /> Notes: <br /> Covered prior to inspection.Remove ceiling tiles for ceiling inspection of new circuits conduit's lights receptacles etc.install all boxes. <br /> 11/10/2020 11/10/2020 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 5/13/2021 5/13/2021 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 9/15/2021 9/15/2021 ELEC 09-FINAL TODD JOHNS OTHER <br /> Notes: <br /> Contact:Jesse Anderson 360 219 3194 <br /> (9/15/2021 1:58 PM TJJO) <br /> Above t-grid looks ok,new island in middle has power and appears to be new with no inspections.can't find any inspections in system for anything on <br /> this remodel other than final on 12/12/2019 by SKB.Handing over to skb since original inspection was two years prior. <br /> Printed: Monday, 17 October,2022 1 of 1 ,i <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.