My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2405 COLBY AVE 2022-11-16
>
Address Records
>
COLBY AVE
>
2405
>
2405 COLBY AVE 2022-11-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 12:01:13 PM
Creation date
11/16/2022 12:00:44 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/24/2022 Page 1 <br /> City of Everett <br /> 6:32:56AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. P2103-015 Site Address 2405 COLBY AVE <br /> Applied 3/5/2021 Applicant DARCY WALKER Lot <br /> Approved 3/5/2021 Owner EVERETT SCHOOL DIST 2 Block <br /> Issued 7/8/2021 Contractor J H KELLY LLC(CONST) Tract <br /> Parent Permit No. M2103-004 Description PLUMBING FOR DEMO&REPLACEMENT OF HOT WATER B <br /> Notes AND SUPPORTING EQUIPMENT <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 5/5/2022 5/5/2022 PLUMB 08-FINAL BGA CANCELLED eTRAKiT Inspection 5/4/2022 8:05 AM J H KELLY LLC <br /> Request (CONST) <br /> FIRED PM ON THIS PROJECT AND <br /> TRYING TO CLOSE OUT ALL THE <br /> MISSING PIECES.SORRY FOR THIS IN <br /> ADVANCE <br /> Contact Name:CORY PLOEGMAN <br /> Site Address:3422 1ST AVE SOUTH <br /> Phone:2066652047 <br /> e-Mail:jjarvi�a jhkelly.com <br /> (5/5/2022 8:19 AM BGA) <br /> Customer does not want inspection today. <br /> 8/23/2022 8/23/2022 PLUMB 08-FINAL JJM APPRVD-PERK (8/23/2022 2:52 PM JJM) <br /> -Backflow report recieved.Visual <br /> inspection done during boiler inspection on <br /> M2103-015. <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.