My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1202 100TH CT SE 2024-03-08
>
Address Records
>
100TH CT SE
>
1202
>
1202 100TH CT SE 2024-03-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 2:55:06 PM
Creation date
11/17/2022 3:33:42 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH CT SE
Street Number
1202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. ENVIRONMENTAL ELEMENTS Jhelpl <br /> 1. Earth fhelpj <br /> a. General description of the site: f help' <br /> See attached Site Specific Land Application Plan(SSLAP)for the City's Lowell Snohomish River Road <br /> Site <br /> (circle one): Flat, rolling, hilly, steep slopes, mountainous, other <br /> b. What is the steepest slope on the site (approximate percent slope)? [help' <br /> SAA <br /> c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, <br /> muck)? If you know the classification of agricultural soils, specify them and note any <br /> agricultural land of long-term commercial significance and whether the proposal results in <br /> removing any of these soils.Jhelpl <br /> SAA <br /> d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, <br /> describe. fhelpj <br /> No <br /> e. Describe the purpose, type, total area, and approximate quantities and total affected area of <br /> any filling, excavation, and grading proposed. Indicate source of fill. (help' <br /> None <br /> f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. <br /> (help' <br /> N/A <br /> g. About what percent of the site will be covered with impervious surfaces after project <br /> construction (for example, asphalt or buildings)?'help' <br /> None <br /> h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Jhelpl <br /> N/A <br /> 2.Air Jhelpl <br /> a. What types of emissions to the air would result from the proposal during construction, <br /> operation, and maintenance when the project is completed? If any, generally describe and <br /> give approximate quantities if known. f help' <br /> Biosolids from the Everett Water Pollution Control Facility are exceptionall well digested. Very little <br /> odor is noted or generated. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, <br /> generally describe. (help' <br /> N/A <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if any:Jhelpl <br /> N/A <br /> 3. Water jhelpl <br /> SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 3 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.