Laserfiche WebLink
''',Alr''' <br /> SHEARWALL SCHEDULE (CDX) EPDXY HOLDOWN SCHEDULE HOLDOWN1. NOBOS <br /> HOLDOWN SCHEDULE ALL-THREAD BOLTS SHALL <br /> *FOR HOLDOWNS INSTALLED IN NEW FOUNDATIONS *FOR EPDXY INSTALLATIONS INTO EXISTING CONCRETE CONFORM TO ASTM A307. <br /> SILL PLATE & BOTTOM/TOP PLATE ANCHOR FASTENERS TO EMBEDMENT MIN. EDGE <br /> MARK SHEATHING EDGE NAILING FIELD NAILING MODEL 2. MINIMUM CONCRETE COMPRESSIVE `• <br /> CONN. FND CONN. THRU BOLTS OR EMBEDMENT/ MINIMUM le d. BOLT POST LENGTH DISTANCE STRENGTH f' = 2500 PSI � <br /> A3 %" 0 A.B. © 48" LTP4 0 20" 0/C MODEL ANCHOR BOLT NAILS/SCREWS STRAP LENGTH EDGE DIST. �. (20) Ya" x 2 �" SDS <br /> / CDX ONE 8d 6" 0/C 8d 12' 0/C 0/C W/ 2x SILL W/ 2x BOTTOM HDU8-SDS2.5 g' 0 ATR 12" 13�4" N <br /> FACE PLATE PLATE LSTHDSRJ N/A (24) 10d COMMON 8" EMBED 1Yz" NA NA SCREWS 3. MINIMUM EDGE DISTANCE IS FOR - " <br /> 3/6' CDX ONE <br /> FACE % 0 A.B. 0 36" LTP4 0 14" 0/C FORMED CONCRETE EXPOSED TO <br /> 8d © 4" 0/C 8d © 12' 0/C 0/C W/ 2x SILL W/ 2x BOTTOM STHD1O/RJ N/A (28) 16d COMMON 10' EMBED 13,2" NA NA WEATHER OR SOIL. FOR CONCRETE s PLATE PLATE - (14) SOSY4x2.5 CAST AGAINST SOIL PROVIDE 3" co <br /> HDUSSDS2.5 SSTB20 16i EMBED 13/4" NA NA" - - CLEAR TO ANCHOR BOLT. <br /> shz" CDX ONE 10d ® 12" /a" 0 A.B. © 30' LTP4 0 12" 0/C SCREWS O) <br /> 0 <br /> FACE 10d 4" 0/C 0/C 0/C W/ 3x SILL W/ 2x BOTTOM • POST PER HOEDOWN PER 4. NAILS/SCREWS TO HOLDOWN POST N <br /> PLATE PLATE PLAN/SCHEDULE 'LAN (HDQS .- to <br /> (2-2x MIN) SHOWN) SHALL BE PER MANUFACTURER'S 0 N <br /> WEB STIFFENER SPECIFICATIONS. 'U Ifj <br /> SHEARWALL NOTES HOLDOWN NOTES INSTALLED SNUG FOR I1H <br /> , ALL-THREAD ROD, 0 N-4- <br /> 1. ALL STUDS, BLOCKING, TOP AND BOTTOM PLATES SHALL BE HEM-FIR NO. 2 UNLESS NOTED 1. ALL-THREAD BOLTS SHALL CONFORM TO ASTM A307. I-JOISTS. NODIAMETER AND EMBEDMENT 5. MINIMUM CONCRETE WALLOTHERWISE ON PLANS. ALL SHEATHING EDGES MUST BE BACKED WITH 2x OR WIDER FRAMING - STIFFENERS REQ'D FORPER SCHEDULE THICKNESS 6". Q Q LLI M C(SEE NOTE #3). 2. MINIMUM CONCRETE COMPRESSIVE STRENGTH f'c = 2500 PSI - SOLID SAWN. PLACE 2x6SQUASH BLOCK EA SIDE BOTTOM PLATE PER • <br /> tL.32. SHEATHING MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY. ALL SHEARWALL 3. ALL HOEDOWNS REQUIRE A (2) 2x POST UNLESS NOTED OTHERWISE. HDU11 AND HHDQ14 ii <br /> 6. WHEN FIELD CONDITION BECOMESHEARWALL SCHEDULE LESS THAN MINIMUM SHOWN, CCC <br /> SHEATHING MUST EXTEND TO THE OUTISDE EDGE OF ALL HOEDOWN POSTS AND CORNERS, AND REQUIRE A 6x6 D F 2 MINIMUM POST SIZE, U.N.O. WHERE HOEDOWNS ARE INSTALLED INTO OF JOIST. WHERE HD# DOE$ NOT LINE UP ,I 'IM JOIST PER PLAN. 1Y2" CONTACT ENGINEER PRIOR TO GT `L <br /> TO THE INSIDE EDGE OF FRAMING AROUND OPENINGS. THE WIDE FACE OF THE STUD, THE STUDS MUST BE STITCH NAILED TOGETHER W/ 16d OVER JOIST, USE �� �• MIN WIDTH AT PROCEEDING. D <br /> ERS <br /> GGERED <br /> /C. SQUASH <br /> K EQUAL <br /> -1111 <br /> RECEIVING3. EEDGEANAIILNG FROM ABUTTING SHEARWALL <br /> PANELS SHA AND <br /> LL NOT BE LESS THANFRAMING <br /> A SINGLE 3-INCH 4.NKMNIMUMAEDGE DISTANCE IS FOR FORMED CONCRETE EXPOSED TO WEATHER OR SOIL. FOR TO WIDTBOVEC(4x MINPOS). �La-II SPLAPRETEUPERRE TSHEARWALLREATED L LARGER 7. L HANHOANCHORR TBOLTS Y6 0 O 3 ABOVE (4x MIN). <br /> NOMINAL MEMBER. ADDITIONALLY, WHERE SHEAR WALLS ARE SHEATHED ON BOTH FACES, ALL CONCRETE CAST AGAINST SOIL PROVIDE 3" CLEAR TO ANCHOR BOLT. - . SCHEDULE. DIAMETER. 5 0 0) 3 <br /> STUDS AND PLATES RECEIVING EDGE NAILING FROM BOTH FACES MUST BE A SINGLE 3-INCH } °i - - STEM WALL AND L. M y M <br /> NOMINAL MEMBER OR PANEL JOINTS MUST BE STAGGERED. IN EACH OF THESE CASES 3x STUDS EMBEDMENT <br /> •5. NAILS/SCREWS TO HOEDOWN POST SHALL BE PER MANUFACTURER'S SPECIFICATIONS. LENGTH FOOTING PER 8. HOLDOWNS MAY BE ATTACHED TO W Ili <br /> re) <br /> ARE REQUIRED UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS BY THE ENGINEER. FOR PLAN. EXISTING CONCRETE USING SIMPSON <br /> SHEARWALLS #3 AND #4, A 2x SILL PLATE MAY BE USED IF TWO TIMES THE NUMBER OF 6. ALL HOLDOWN BOLTS MUST BE RE-TIGHTENED JUST PRIOR TO ENCLOSING 2ND SIDE OF 'SET' HIGH STRENGTH EPDXY. SIZE 0 <br /> ANCHOR BOLTS REQUIRED BY THE SHEARWALL SCHEDULE ARE USED AND ARE EVENLY SPACED WALL. AND EMBED PER CHART. ICBO <br /> (SEE 2003 IBC SECTION 2305.3.10). 4-, Z.REPORT N0. ER-5279. <br /> 0 <br /> 4. SHEARWALL NAILING CRITERIA IS BASED ON TABLE 2306.4.1 OF THE INTERNATIONAL BUILDING I <br /> CODE (FOR CDX) OR REPORT NER-124 (FOR OSB). VALUES ARE BASED ON HEM-FIR NO. 2 FOR DOUBLE SIDED SHEARWALLS, 0 HOLDOWN INSTALLATION INTO EXISTING FOUNDATION a <br /> FRAMING WITH COMMON NAILS. LENGTH OF THE SHEATHING ON EACH FACE z <br /> HOLDOWN POST. SEE SHEARWALL MUST EXTEND CONTINUOUS N <br /> 5. HOLDOWNS AND OTHER CONNECTIONS MAY BE REQUIRED AT THE ENDS OF MANY HOLDOWN SCHEDULE OR BETWEEN HOLDOWN POSTS AS s <br /> SHEARWALLS. SIZES AND LOCATIONS OF THESE CONNECTORS ARE INDICATED ON THE PLANS. PLAN FOR MINIMUM SHOWN. z <br /> REFER TO THE APPROPRIATE DETAILS AND/OR HOLDOWN SCHEDULE FOR ADDITIONAL REQUIREMENTS - <br /> INFORMATION REGARDING ANCHOR BOLTS, EMBEDMENT LENGTH, ETC. WHERE (2) 2x's ARE USED �I�I-III 1',II',I� 'm <br /> AS A HOLDOWN POST, SHEARWALL EDGE NAILING MUST BE STAGGERED INTO EACH MEMBER OF © OPENING PER PLA <br /> THE POST. <br /> o <br /> - 6. ANCHOR BOLTS MUST BE EMBEDDED'A MINIMUM OF 7" INTO CONCRETE OR GROUTED CMU, LOCATION OF STHDI4RJ <br /> AND <br /> CSHALL <br /> RETE CBE PLACED <br /> TO°PROVIDE A MINIMUM OF 2'" COVER. PROVIDE 3" COVER FOR HOLDOWNCON IL. INSTALLEDSTALLED \`TYPE OF HOLDOWN TO BE 0 O z <br /> INSTALLED <br /> 7. ALL MACHINE BOLTS SHALL BE ASTM A307 OR BETTER. HILTI KWIK BOLTS/SIMPSON TITEN SHEARWALL DESIGNATION - SEE <br /> HD BOLTS OF THE SAME DIAMETER AS SHOWN IN THE SHEARWALL SCHEDULE MAY BE SHEARWALL SCHEDULE FOR FRAMING, <br /> SUBSTITUTED FOR ANCHOR BOLTS INTO EXISTING CONCRETE. BOLTS SHALL BE EMBEDDED A NAILING AND ANCHORAGE 0 <br /> Ire IIMMillt <br /> MINIMUM OF 5" INTO EXISTING CONCRETE. REQUIREMENTS <br /> 8. ALL NAILS AND CONNECTORS IN CONTACT WITH PRESSURE TREATED WOOD (EXCEPT FOR LATERAL MARKING LEGEND <br /> • BORITE TREATED WOOD) MUST BE HOT DIPPED GALVANIZED OR STAINLESS STEEL TO RESIST III <br /> CORROSION. <br /> Z O 00 <br /> O <br /> 9. WHERE 10d NAILS ARE SPACED AT 3" ON CENTER OR LESS, NAILS MUST BE STAGGERED. OF <br /> co 00 <br /> at <br /> 10. OSB OF EQUAL OR GREATER THICKNESS MAY BE SUBSTITUTED FOR CDX SPECIFIED IN 0 U Q <br /> SHEARWALL SCHEDULE. Q d' <br /> SHEARWALL EDGE NAILING T SHEARWALL EDGE NAILING T 6d®EA BLOCK AND 012" uuI'I <br /> M_ W <br /> BOTTOM PLATE.EXTENDBOTTOM PLATE.EXTEN 0/C INTO RIM.WHERE 3x I'� (3CO <br /> SHEATHING CONT. TO SILL16d®EA JOIST. SHEATHING CONT. TO SILL. BOTTOM PLATE IS REDID.USE I O 0 CU <br /> PRESSURE TREATED SILL WHERE 3x BOTTOM PRESSURE TREATED SILL SOS Yx4)4 SCREWS © M N W <br /> PLATE PER SHEARWALL PLATE IS REDID, USE PLATE PER SHEARWALL :LOCKING 0 48" 'I I <br /> SCHEDULE. USE 2x6 W/A.B. SDS1ax46 SCREW. SCHEDULE. USE 2x6 W/ 0/C W/(3)10d <br /> 0 48"0/C(MIN) A.B.®48"0/C(MIN) NAILS • <br /> LTP4 PER SHEARWALL LTP4 PER SHEARWALL :>- l l L l <br /> SCHEDULE SCHEDULE r = = . <br /> SHEARWALL EDGE ' • SHEARWALL EDGE 1 I <br /> p NAILING TO SILL I NAILING TO SILL PLATE II 1 .: 07/10/2019 <br /> F. PLATE Ir _. .-. .. - .. .. <br /> O <br /> a <br /> 6 6.. ` <br /> JI�IIEHI�'� JOIST PER PLAN } iI I FBI JOIST PER PLAN <br /> 11111111111111111 <br /> �Iy�I�� (I-JOIST SHOWN) I I1 r�= (I-JOIST SHOWN) ®DOUBLE TOP PLATE W/ EDGE NAILING ©HOEDOWN PER SCHEDULE AND <br /> (STAGGER) PLAN (HDQS-SDS3 SHOWN) <br /> FROST DEPTH WHEN STAMPED LATERAL FROST DEPTH WHEN STAMPED LATERAL ©SHEARWALL EDGE NAILING AT ALL PANEL ©COORDINATE ALL STUD AND <br /> I _� ONLY. REINFORCING BY 18" ONLY,REINFORCING BY PLATE SIZES w/ SHEARWALL <br /> - _ (18" MIN) OTHERS. ( MIN) EDGES. BLOCKING AT ALL PANEL EDGES <br /> CLEAR SPAN I IIn f-F SCHEDULE REQUIREMENTS <br /> I <br /> 17" MAXIMUM IPER (PLAN x 11 ' e WHERE APPLICABLE.11I ��' II�LI- 'ER PLAN = a�I �,[� II-11 }' IIII� ©EDGE NAILING TO HOEDOWN POST (FULL OJ EDGE NAILING TO POSTS, TRIM <br /> 30" MIN. HEIGHT) STAGGER INTO DOUBLE STUDSSTUDS, AND KING STUDS <br /> REBAR �' FOOTING PER FOOTING PER QK BEARING STUD FOR HEADER <br /> LENGTH 4"0 PERFORATED PLASTIC PIPE. PER PLAN PLAN "0 CENTERPERFORATED <br /> CUBCPLASTIC <br /> TOOPI E. PER PLAN PLAN <br /> ©STUDS 16" ON CENTER <br /> ©PRESSURE TREATED SILL PLATE WITH ©RIMJOIST TO BE 1Yz" MIN <br /> CENTER IN ONE CUBIC FOOT OFTHICKNESS AT ALL <br /> • <br /> ONE #4 REBAR FREE DRAINING GRAVEL AND FREE DRAINING GRAVEL AND DRAIN EDGE NAILING AND ANCHOR BOLTS PER <br /> IN SHEAR CONE DRAIN TO APPROVED OUTFACE TO APPROVED OUTFACE. SHEARWALLS <br /> �- (12"MIN. REBARSHEARWALL SCHEDULE. Drawn By: MKB <br /> *BREAK SHEARWALL SHEATHING © BOTTOM OF SILL PLATE ©TOP PLATE SPLICE NAILING TO BE (8) 16d Checked B <br /> LENGTH) SINKERS (MIN). LAP 48" MINIMUM. Date:7-10-I B <br /> 1/2" MIN. . JOISTS PERPENDICULAR JOISTS CENTER SPLICE ON STUD. <br /> FROM CONER PARALLEL <br /> STD. SHEARWALL ELEVATION W/ RIM SDA JOB NO. <br /> 2 'STHD' 3 EXT. WALL/FOUNDATION CONNECTION (LATERAL ONLY) °SCALE: "=1'-0"' 8743 <br /> INSTALLATION° w/ RIM °APPLICABLE FOR ALL SHEARWALLS w/ RIM <br /> SCALE, 4'_''- STRUCTURAL <br /> N OTES/D ETAI LS <br /> 5-2.0 H12 <br />