My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3102 ROCKEFELLER AVE CANFIELD MADOW LAW GROUP 2022-11-28
>
Address Records
>
ROCKEFELLER AVE
>
3102
>
CANFIELD MADOW LAW GROUP
>
3102 ROCKEFELLER AVE CANFIELD MADOW LAW GROUP 2022-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 11:50:58 AM
Creation date
11/18/2022 2:41:59 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3102
Tenant Name
CANFIELD MADOW LAW GROUP
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Architects Group rc <br /> 2413 Rockefeller Ave.Everett,WA 98201• ph:425.317.8017•fax:425.317.8489 <br /> 11.13.19 <br /> CANFIELD MADOW LAW GROUP <br /> International Existing Building Code <br /> Comipliance Method Selected <br /> The 2015 edition of the International Building Code(IBC)now requires the use of the International <br /> Existing Building Code(IEBC)when a project intends to modify an existing building. <br /> This includes repairs,alterations,relocation of buildings,additions and change of occupancy. <br /> The IEBC is beneficial to the building owner and the project design team, because it allows"flexibility to permit the <br /> use of alternative approaches to achieve compliance with minimum requirements"that may be otherwise <br /> impractical with full enforcement of the IBC. <br /> The intent of the IEBC is still to maintain minimum levels of safety regarding"fire prevention,structural and life <br /> safety features of the rehabilitated building." <br /> Option 2: Work Area Compliance Method <br /> Alterations based on the scope of work are categorized by level. <br /> Level 2 Selected for 3102 Rockefeller Ave Project. <br /> Level 2-Alterations that include the reconfiguration of space,the addition or elimination of any door or window,the <br /> reconfiguration or extension of any system,or the Installation of any additional equipment.The majority of tenant <br /> improvements fall into this level. Depending on the scope of work, upgrades to sprinkler systems,open floor <br /> penetrations, and/or means of egress may be required. <br /> Description of Scope of work: <br /> Reconfiguration of space: new walls added to create small conference on main floor <br /> Walls deleted to enlarge kitchen (enclosing hallway),deleted second non ADA bathroom,dividing of reception and <br /> office space from one space into two. Lower floor walls added to define exercise area—enclosing old kitchen and <br /> enlarging existing toilet to include a sink. <br /> Reconfigurations include deleting doors or adding doors. <br /> Window at main floor Restroom reduced to allow ADA compliance for grab bars in old tub area. <br /> Repairs to maintain building: abatement of asbestos,insulation added where abated lath and plaster allow access, <br /> new drywall, new paint,new trim, new hardware at new doors(at existing door locations), new carpet. <br /> No addition of any additional equipment;replacement only for maintenance. <br /> IEBC REQUIREMENTS FOR LEVEL 2 Chapters 7&8 <br /> Chapter 7 Compliance(Level 1 included) <br /> 705.2 Primary function: route to the primary function remains as existing. <br /> Toilet facilities made ADA. <br /> Fountain not required due to occupancy count. <br /> Thresholds shall be 3/4 inch maximum. <br /> Chapter 8 Compliance(Level 2) <br /> Vertical openings—NA(each floor does not exceed 3000 sf) <br /> Interior Finish of walls and ceilings shall comply with IBC—all drywall <br /> Guards—Guards at lower floor will meet IBC <br /> Fire Resistance Ratings—NA not required in Type V non-rated construction <br /> 1 I_page <br />
The URL can be used to link to this page
Your browser does not support the video tag.