Laserfiche WebLink
1111 0 <br /> Tony Lee <br /> From: Tony Lee <br /> Sent: Monday, November 25, 2019 3:34 PM <br /> To: 'Sandra Higgins' <br /> Subject: RE: 3102 Rockefeller <br /> OK, then 6'8" it is.Will continue.Thanks. <br /> Tony Lee <br /> 16. Building Official 1 Permit Services <br /> 425.257.8812 1 3200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Hours: Monday—Friday 7:30am-12:00pm and 1:00pm-4:00pm <br /> everettwa.gov 1 Facebook 1 Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From:Sandra Higgins<Sandra@caparchgroup.com> <br /> Sent: Monday, November 25, 2019 3:24 PM <br /> To:Tony Lee<TLee@everettwa.gov> <br /> Subject: Re: 3102 Rockefeller <br /> Tony, <br /> We have 6'8". The beams are being upset per the detail sent in my last email. <br /> Fire Alarm is being added. <br /> Parking review by Grace Pollard. <br /> Thank you. <br /> Sandra J. Higgins.President•AIA AIBC CP NCARB <br /> Capital Architects Group PC• 2813 Rockefeller Ave.Everett,WA 98201 •ph:425.317.8017 <br /> From:Tony Lee<TLee@everettwa.gov> <br /> Sent: Monday, November 25, 2019 3:04 PM <br /> To:Sandra Higgins<Sandra@caparchgroup.com> <br /> Subject: RE: 3102 Rockefeller <br /> Hi Sandra— <br /> have gone through the permit history again this morning and have come up with the same conclusions as below. I have <br /> included pertinent information from the permit history in my attachment. <br /> The building underwent a change of use process in 1988/89 to convert from a triplex to a two-person office.At that <br /> time,the basement was officially referred to as'not habitable space'.This was not contested by the owners—the <br /> additional space would have created an even greater parking demand for which a variance was being sought.Variance <br /> #42-88 specifically excluded the square footage of the basement as part of the process. <br /> 1 /LI <br />