Laserfiche WebLink
Permit Inspections <br /> V E R E T T city of Everett <br /> WASHINGTON <br /> Permit Number: E2208-235 Description: ELECT FOR 6.4kW PHOTOVOLTAIC ROOF MOUNTED SOLAR <br /> INSTALLATION <br /> Applied:8/25/2022 Approved:8/25/2022 Site Address:604 WARREN AVE <br /> Issued:8/26/2022 Finaled:9/28/2022 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant:GIANCARLO ANGULO <br /> Parent Permit: B2208-103 Owner: MOSTROM JOHN M/WOODS CATHERINE A <br /> Parent Project: Contractor: NORTHWEST ELECTRIC&SOLAR LLC <br /> Details: <br /> **MANUFACTURER SPEC TO BE ONSITE FOR BLDG INSPECTOR TO REFER TO** <br /> ELECT FOR 6.4kW PHOTOVOLTAIC ROOF MOUNTED SOLAR INSTALLATION <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 9/9/2022 9/9/2022 ELEC 02-GROUND STEVE BANKS APPROVAL eTRAKiT Inspection Request <br /> WORK <br /> Notes: <br /> 9/8/2022 10:51 AM NORTHWEST ELECTRIC&SOLAR LLC <br /> TRENCHING COMPLETE <br /> Contact Name:John Mostrom <br /> Site Address:604 WARREN AVE <br /> Phone:2067555869 <br /> e-Mail:nwesgangulo@gmail.com <br /> skb changed Inspection Type from ELEC 03-SLAB/CONDUIT to ELEC 02-GROUND WORK <br /> Detached garage to house. <br /> 9/19/2022 9/19/2022 ELEC 10-FINAL STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 9/16/2022 6:48 AM NORTHWEST ELECTRIC&SOLAR LLC <br /> Contact Name:NORTHWEST ELECTRIC&SOLAR LLC <br /> Site Address:604 WARREN AVE <br /> Phone:2063560601 <br /> e-Mail:nwesgangulo@gmail.com <br /> Wire per the one line diagram or change the one line diagram.NM cable and flex are ran right up against the outside sheathing should be ran in the <br /> middle of the stud or nail plates must be installed for nNM cable.A ground rod is required at the detached building it is as it is remote from the service <br /> and does not have a grounding electrode system.Per NEC 695.47(A).Relocate the backfeed breaker to the other end of the bus from the main and label <br /> it do not move this breaker.Local rapid shut down required on the garage <br /> vd <br /> Printed:Wednesday,28 September,2022 1 of 2 SUPERION <br />