My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2318 HIGHLAND AVE B 2023-12-07
>
Address Records
>
HIGHLAND AVE
>
2318
>
2318 HIGHLAND AVE B 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 1:32:38 PM
Creation date
11/28/2022 3:37:22 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND AVE
Street Number
2318
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. 50 feet setback from slopes greater than 15 percent and greater than 10 feet in height. fit,' <br /> 5. All underground stormwater facilities shall be setback from any structured or property line a •i istance <br /> equal to the depth of the ground disturbed in setting the structure. V <br /> Infiltration trenches may be located under pavement if a small yard drain or catch basin with grate cover is <br /> placed at the end of the trench pipe such that overflow would occur out of the 2019 Stormwater Management <br /> Manual for Western Washington Volume V-Chapter 4- Page 707 catch basin at an elevation at least one foot <br /> below that of the pavement,and in a location which can accommodate the overflow without creating a <br /> significant adverse impact to downhill properties or drainage systems.This is intended to prevent saturation of <br /> the pavement in the event of system failure. <br /> 6. Applicable access requirements of DCSS 4-4.2 (3) have been met. <br /> 7. Filter fabric shall be placed over the drai .rock as shown on Figure V-4.I:Typical Downspout <br /> Infiltration Trench prior to backfilling. <br /> 8. Does this project include infiltration of runoff from pollution generating surfaces? <br /> Yes. Treatment is required and shall be designed per the 2019 SWMMWW. <br /> Indicate type and sizing of treatment that will be provided prior to infiltration(provide BMP number,and sizing of <br /> BMP). <br /> No. No treatment required. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 18 <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.