My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2318 HIGHLAND AVE B 2023-12-07
>
Address Records
>
HIGHLAND AVE
>
2318
>
2318 HIGHLAND AVE B 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 1:32:38 PM
Creation date
11/28/2022 3:37:22 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND AVE
Street Number
2318
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLETE IF USING INFILTRATION (2A or 2B) TO MEET FLOW <br /> CONTROL REQUIREMENT <br /> Determine whether infiltration has been pre-determined to be infeasible for any portion of your <br /> project site. <br /> f A\ 601 Ogtlk, l f\ 1, -1Ut 1qt t o <br /> • Review the infiltration infeasibility mapping tool available on"Map Everett" <br /> 0 everettwa.gov/mapeverett <br /> • On the mapping tool,select"Geotechnical/Infiltration Infeasibility Area"and the <br /> applicable"Property"layers from the Layer List. <br /> 4> ■ Zoom into your project site and printthe resulting map to showthe project site <br /> boundaries and the infiltration infeasibility mapping results. <br /> • Areas mapped as red have been pre-determined to be infeasible for infiltration. <br /> • Areas mapped as green are potentially feasible for infiltration and must be <br /> assessed further for infiltration feasibility,as discussed further below. <br /> • Attach a printed copy of the map clearly showing your project site boundary and the <br /> infiltration infeasibility mapping results. <br /> * If you selected Downspout Full Infiltration (2A), submit I and 2 below. <br /> If you selected Rain Garden/Bioretention (2B),on-site soils information for sizing is <br /> required from I through 3 below. <br /> Submit the following information to Permit Services with this report <br /> I. A USDA Custom Soil Report from https://websoilsurvey.sc.egov.usda.gov <br /> 2. USDA Soil Type(s)= <br /> 3. Measured Infiltration Rate= in/hr, measured at BMP location on-site. Use Rain Garden <br /> Handbook methodology for infiltration test. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 20 <br /> the Combined Sewer Area April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.