Laserfiche WebLink
COMPLETE IF USING INFILTRATION (2A or 2B) TO MEET FLOW <br /> CONTROL REQUIREMENT <br /> Determine whether infiltration has been pre-determined to be infeasible for any portion of your <br /> project site. <br /> f A\ 601 Ogtlk, l f\ 1, -1Ut 1qt t o <br /> • Review the infiltration infeasibility mapping tool available on"Map Everett" <br /> 0 everettwa.gov/mapeverett <br /> • On the mapping tool,select"Geotechnical/Infiltration Infeasibility Area"and the <br /> applicable"Property"layers from the Layer List. <br /> 4> ■ Zoom into your project site and printthe resulting map to showthe project site <br /> boundaries and the infiltration infeasibility mapping results. <br /> • Areas mapped as red have been pre-determined to be infeasible for infiltration. <br /> • Areas mapped as green are potentially feasible for infiltration and must be <br /> assessed further for infiltration feasibility,as discussed further below. <br /> • Attach a printed copy of the map clearly showing your project site boundary and the <br /> infiltration infeasibility mapping results. <br /> * If you selected Downspout Full Infiltration (2A), submit I and 2 below. <br /> If you selected Rain Garden/Bioretention (2B),on-site soils information for sizing is <br /> required from I through 3 below. <br /> Submit the following information to Permit Services with this report <br /> I. A USDA Custom Soil Report from https://websoilsurvey.sc.egov.usda.gov <br /> 2. USDA Soil Type(s)= <br /> 3. Measured Infiltration Rate= in/hr, measured at BMP location on-site. Use Rain Garden <br /> Handbook methodology for infiltration test. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 20 <br /> the Combined Sewer Area April 2021 <br />