Laserfiche WebLink
DONE! <br /> You have now completed the Small Project Stormwater Report. <br /> Please review any sections you may have skipped to ensure all areas have been completed. <br /> Ensure the following attachments have been added: <br /> 7 <br /> ❑ Project Specific Stormwater Site Plan <br /> Topographic Survey <br /> Declaration of Covenant and Grant of Easement <br /> 7 ❑ Construction SWPPP Drawings <br /> 7 ❑ Underground Injection Well(UIC)Registration* <br /> *You may need to register with the Washington State Department of Ecology at least 60 <br /> days prior to commencing U!C Construction.For more information,visit: <br /> everettwa.qov/1985/Stormwater-Technical-Resources <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 22 <br /> the Combined Sewer Area-April 2021 <br />