Laserfiche WebLink
STEP 4. COMPLETE MINIMUM REQUIREMENTS <br /> The more information provided in these subsections typically corresponds to faster review and permit <br /> issuance times. Submitted checklists that lack the necessary information for review are considered <br /> incomplete and will be returned unprocessed to the applicant. <br /> Preparation of Stormwater Site Plan <br /> The purpose of this task is to convey all relevant information about the proposed project to the City for review <br /> to ensure the project is in compliance with the current City and State stormwater management standards. <br /> This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br /> significant and insignificant aspects of the project with regards to stormwater management. <br /> Task 1: Describe existing site conditions <br /> Provide description of existingsite conditions: U\PIVP1 W 1I <br /> \ cd,U WSVM <br /> /NC,TV\l/1/4rt lOok \i(mkR. <br /> Describe existing structures (location,type): <br /> '40i0,\KWA (},c <br /> , 0 ea- *IA) <br /> 0 "1 <br /> Describe slopes on your site (flat, rolling, steep,%): <br /> Describe hard surfaces (roof,ground treatment): <br /> S6V,\S\C ‘a( eViNZ-Woji (\k.-cog\i\ <br /> Describe vegetative surfaces (location, quantity ft2): <br /> () ,SS Opt ° 1 'k -0 M0 <br /> oycm% ky.Q,q <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 6 <br /> the Combined Sewer Area-April 2021 <br />