My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2318 HIGHLAND AVE B 2023-12-07
>
Address Records
>
HIGHLAND AVE
>
2318
>
2318 HIGHLAND AVE B 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 1:32:38 PM
Creation date
11/28/2022 3:37:22 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND AVE
Street Number
2318
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 4. COMPLETE MINIMUM REQUIREMENTS <br /> The more information provided in these subsections typically corresponds to faster review and permit <br /> issuance times. Submitted checklists that lack the necessary information for review are considered <br /> incomplete and will be returned unprocessed to the applicant. <br /> Preparation of Stormwater Site Plan <br /> The purpose of this task is to convey all relevant information about the proposed project to the City for review <br /> to ensure the project is in compliance with the current City and State stormwater management standards. <br /> This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br /> significant and insignificant aspects of the project with regards to stormwater management. <br /> Task 1: Describe existing site conditions <br /> Provide description of existingsite conditions: U\PIVP1 W 1I <br /> \ cd,U WSVM <br /> /NC,TV\l/1/4rt lOok \i(mkR. <br /> Describe existing structures (location,type): <br /> '40i0,\KWA (},c <br /> , 0 ea- *IA) <br /> 0 "1 <br /> Describe slopes on your site (flat, rolling, steep,%): <br /> Describe hard surfaces (roof,ground treatment): <br /> S6V,\S\C ‘a( eViNZ-Woji (\k.-cog\i\ <br /> Describe vegetative surfaces (location, quantity ft2): <br /> () ,SS Opt ° 1 'k -0 M0 <br /> oycm% ky.Q,q <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 6 <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.