Laserfiche WebLink
Element 9. Control pollutants: <br />• BMP C151: Concrete Handling <br />• BMP C152: Sawcutting and Surfacing Pollution Prevention <br />• BMP C153: Material Delivery, Storage, and Containment <br />❑ BMP C154: Concrete Washout Area <br />❑ BMP C250: Concrete Stormwater Chemical Treatment <br />❑ BMP C251: Construction Stormwater Filtration <br />❑ BMP C252: High pH Neutralization Using CO2 <br />❑ BMP C253: pH Control for High pH Water <br />❑ Other Per the SWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: -------------------------- <br />Element 10. Control dewatering: <br />❑ BMP C236: Vegetative Filtration <br />❑ Other Per the SWMMWW: <br />91 Not applicable to my proposed project <br />Explain: No dewatering is required on this site. <br />Element 11. Maintain BMPs: <br />❑ BMP C150: Materials On Hand <br />❑ BMP C160: Certified Erosion and Sediment Control Lead <br />(CESCL not required on -site for <1 acre). <br />❑ Other Per the SWMMWW: <br />0 Not applicable to my proposed project <br />Explain: No BMPs are proposed as part of development. <br />Element 12. Manage the Project: <br />❑ BMP C150: Materials On Hand <br />❑ BMP C160: Certified Erosion and Sediment Control Lead <br />(CESCL not required on -site for sites <1 acre) <br />0 BMP C162: Scheduling <br />❑ Other Per the SWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: -------------------------- <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 11 <br />