Laserfiche WebLink
DONE! <br />You have now completed the Small Project Stormwater Report. <br />Please review any sections you may have skipped to ensure all areas have been completed. <br />Ensure the following attachments have been added: <br />0 Project Specific Stormwater Site Plan <br />0 Topographic Survey <br />0 Declaration of Covenant and Grant of Easement <br />0 Construction SWPPP Drawings <br />0 Map of Project Site Boundary and the Infiltration Infeasibility Mapping Results <br />0 Worksheet 3 — Sizing Justification Worksheet for your Selected BMP <br />Kh� Underground Injection Well (UIC) Registration* <br />* You may need to register with the Washington State Department of Ecology at least 60 <br />days prior to commencing UIC Construction. For more information, visit: <br />everettwa. gov/1985/Stormwater-Technical-Resources <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 20 <br />