My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/11/30 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/11/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 4:48:58 PM
Creation date
12/1/2022 8:25:27 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/30/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 7: RESPONSIBILITIES OF EACH PARTY <br />7.1 Responsibilities of Subrecipient: <br />This project itself is the sole responsibility of Subrecipient. MLE undertakes no responsibilities <br />to Subrecipient, or to any third party, other than as expressly set out in this document. <br />Subrecipient shall be solely responsible for the design, development, implementation, <br />achievement of deliverables and reporting of the project, as those phases are applicable to this <br />project, and solely responsible for any claim or suit of any nature by any third party related in <br />any way to the project. <br />7.1.1 Project Timeline. The Subrecipient is responsible for maintaining the project timeline for all <br />dates and activities outlined as the Subrecipient's responsibility as identified in the <br />Subrecipient's FFA Grant Application (Attachment "A"). <br />The Subrecipient shall complete the approved project no later than September 30, 2023, as a <br />term of the acceptance of this grant award. The project timeline cannot be extended under the <br />scope of this agreement. <br />MLE staff shall monitor the activities conducted under the scope of this project on a quarterly <br />basis. Work will be considered complete, only when the following conditions are met: <br />• The activities described in the Scope of Work and this grant document have been <br />achieved. <br />• All request for reimbursements have been submitted. <br />• All reporting through the MLE Statement of Activity Reporting system (SOAR) and <br />SECTOR have been completed <br />• Appropriate proof of completion has been provided to MLE <br />If the work is not satisfactorily completed, Subrecipient will be in breach and MLE may, at its <br />discretion, rescind the grant and require repayment of any grant funds already disbursed. <br />7.1.2 Design Preparation. The Subrecipient shall design a project that will have a reasonably <br />likelihood of positively impacting the reduction of boating accidents, boating injuries, and <br />boating fatalities. Such design shall include applicable items on the Checklist for Plans and <br />Specifications as provided in the Subrecipient's MLE Grant Application (Attachment "A"). <br />7.1.3 Purchase. The Subrecipient shall make no purchases in excess of $2,500.00 without prior <br />written authorization by MLE. All purchases must be in the furtherance of recreational boating <br />safety and must adhere to the guidelines set out in the in the Allowable Costs and <br />Expenditures for State Vessel Registration Fees and Federal Assistance Grants manual. <br />(Attachment "B"). <br />7.1.4 Periodic Inspections. Subrecipient hereby grants to the Recipient, or its authorized <br />representative, a right, equal in time to six years from the date of the last signature on this <br />document, to enter upon Subrecipient's property as deemed necessary by the Recipient for <br />inspection documents and any equipment. These periodic inspections are intended to ensure <br />continued compliant use of the awarded funds toward recreational boating safety enforcement <br />and education. materials, products, and workmanship to the original approved plans and <br />specifications. These inspections require a 30-day advance notification to the Subrecipient of <br />such inspection or access. <br />MLE 123-401 Subrecipient Agreement - Boating Program (FFA Grant Award) Page 4 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.