Laserfiche WebLink
(E) ROOF SHTG <br />TO REMAIN <br />(E) JOIST TO REMAIN --- <br />PROVIDE (2) SIMP <br />'SDS25300-R25' <br />SCREWS AS SHOWN <br />(E) INTERIOR STUD <br />WALL, TO REMAIN <br />FIELD VERIFY <br />NOTE: NAIL16d"s AWAY <br />FROM VENT DOLES <br />:XTENT OF LA <br />MATCH W/ (E) <br />(N) BLKG AT (N) SISTER <br />V-6" MAX V-6" MAX <br />JOISTS, LEAVE 2" MIN <br />AIR GAP @ TOP OF BLKG <br />(E) ROOF SHITG <br />TYP TYP <br />TO REMAIN <br />_ z <br />ti <br />PROVIDE (N) 2x CANTILEVER SISTER <br />6' 1 M <br />ROOF JOISTS PER PLAN W/ 2 ROWS <br />CONT (E) TOP —� <br />OF SIMP "SDS25300-R25" SCREWS AS <br />PLATES TO REMAIN <br />TYP YP <br />SHOWN (STAGGERED) <br />NOTE: <br />1. REMOVE AND REPLACE ANY CHARRED WOOD FRAMING <br />AND SHEATHING, TYPICAL AT EXISTING FRAMING. <br />2. REMOVE CHARRED SECTION OF OVERHANG AFTER (N) <br />SISTERED JOISTS ARE INSTALLED. <br />(E) EXTERIOR STUD <br />WALL, TO REMAIN <br />III ilmolm KesI NI <br />PROVIDE (3) 2 1/2°" O DOLES AT SOLID <br />BLKG, TYP AT EA BLKG <br />(N) 2xSOL0 BLKG AT <br />(N) SISTER JOISTS <br />REMOVE AND REPLACE (E) BLKG <br />W/ 2xSOLID BLKG AT (N) SISTER JOISTS <br />W/ (3) 16d TOE NAIL PER BAY TO TOP <br />PLATES AND (2) 16d AT ENDS <br />REMOVE AND REPLACE (E) TI-1 1 <br />SIDING > REINSTALL OVER <br />OSB SHEATHING (STRUCTUAL I) W/ <br />4" BATH VENT <br />6" HOOD VENT <br />PROVIDE (N) FASCIA <br />BRD, MATCH (E) <br />1 1 /2. = °-o°' <br />(E) FLOOR SHEATHING <br />TO REMAIN <br />4 <br />fi <br />a; <br />L(E) FLOOR JOISTS (N) 5/3"" GYP. BRD. W/ FIRE <br />TO REMAIN TAPE @ JOINTS - 3 SIDES, <br />TYPICAL @ DUCTS <br />FLOOR JOIST <br />DUCT ASSE-1MBLY <br />Z <br />— <br />LLJ <br />Cf) <br />0 <br />c\j <br />00 <br />w°` <br />Q <br />z <br />o <br />W <br />w <br />� <br />� <br />Q <br />(D <br />o <br />cn <br />�U <br />Log� <br />LIJ <br />w <br />