Laserfiche WebLink
.,�—rkj'-RAVEL BACKFILL <br />FOR DRAINS <br />s E TE TILE <br />=F ILTEIII <br />EMIR I 1 N' OR <br />3 APPROVED EQUAL <br />T F <br />_ { PERFORATED <br />DRAIN PIPE <br />�PERFORATIONSDOWN' .fMINIMUM <br />SV <br />U11LITIE'S AS SHOWN <br />kp _ <br />a@ PLANS SHALL BE <br />MIN. . LOCATED OUTSVE THE <br />i SOIL BEARING LINE <br />OF THE BUILDING <br />FOUNDATION <br />DRAINAGE <br />__ _.___ <br />T <br />FINISH GRADE <br />PER PLo <br />x <br />- W <br />p T a <br />x GEOTEXTILE FABRIC. <br />s <br />it—r WASHED ROCS r — m PERFORATED RIPE <br />SEE DRA-E PLAN FOR <br />fNAG <br />Of <br />INWERT ELEVATIONS, <br />" MINT <br />TK �.. <br />:R, ow, _ , €'" <br />Vil#k is <br />. N_.,_ <br />T <br />raa� GAS. Vale <br />N"IX <br />- <br />SLOPE T E ,,GH SELECT <br />SITE CML <br />SIDES PER � <br />SILL <br />I E I II EI E <br />1, 1235 sm. ISM street ; suite <br />ELECT FILL, TEMAL SHALL I <br />Nevus, <br />OF LARGE ROCKS (Y+) AND <br />is425,463.9501�� 08 <br />ALL BE <br />.FREE <br />q cm <br />PLACED IN W MAX LOOSE LIFTSvi <br />AND COMPACTED "T F MAX; <br />CCITT PER <br />a <br />e° <br />� <br />OWNER <br />I <br />� �'. <br />� �� <br />MODIFIED PROCTOR TEST T. <br />.I <br />, <br />u <br />CATALYST CAPITAL <br />BEDDING,r4 <br />STORM DRAINAGE PIPE (SEE <br />_ <br />POET SPEC.) <br />_ <br />_ <br />BEDDING <br />r <br />PROJECT NAME <br />PIPE BEDDING, NIII AND <br />ZZ <br />I SITI L 8ACKRLL MATERIALS' fl L <br />SELECT <br />PER dE€IITL SM, AND <br />FILL <br />;'r SHALL BE SHAPED TO THE <br />B07TON11, OF PIPE,EVERETT <br />12" AREA DRAIN (SIDEWALK) <br />T" <br />-01-41-9919,01 <br />CRY OF EVERT <br />