<br />GENERAL PROJECT NOTES
<br />& And F.A. Fire Alarm PRCST. Pre -cast GENERAL.. NOTES:
<br />Z_ Angle F.e, Flat Bar PL. Plate 1. ALL WORK SHALL BE PERFORMED SO AS TO COMPLY WITH ALL LEGAL, INDUSTRY
<br />@ At F.D. Floor Drain P.LAM. Plastic Laminate AND PROJECT -SPECIFIC REQUIREMENTS AND STANDARDS INCLUDING WITHOUT
<br />C Centerline FDN. Foundation PLAS. Plaster LIMITATION OF THE FOLLOWING:
<br />F.E. Fire Extinguisher PLYWD. Plywood
<br />Diameter or Round F.E.C. Fire Extinguisher Cab PR. Pair
<br /># Pound or Number F.H.C. Fire Hose Cabinet PT. Point A. ALL APPLICABLE BUILDING CODES
<br />(E) Existing FIN. Finish P.T.D Paper Towel Dispenser B. ALL APPLICABLE SPECIALTY CODES INCLUDING THE MOST CURRENT ISSUES AND
<br />FL. Floor P.T,D,✓R Combination Paper Towel SUPPLEMENTS
<br />ACOUS Acoustical FLASH. Flashing PTN. Partition C. THE PROJECT MANUAL AND ASSOCIATED SPECIFICATIONS
<br />A.D. Area Drain FLUOR. Fluorescent P.T.R. Paper Towel Receptacle D. THE MANUFACTURER'S REQUIREMENTS OR RECOMMENDATIONS
<br />ADJ. Adjustable F.O.C. Face of Concrete P.J. Panel Joint E. ALL APPLICABLE LANDLORD BUILDING STANDARDS
<br />AGGR. Aggregate F.O.F. Face of Finish
<br />AL. Aluminum F.O.M. Face of Mullion Q.T. Quarry Tile
<br />APPROX. Approximate F.O.SH. Face of Sheathing R. Riser 2. IN USING THESE PLANS FOR BIDDING OR CONSTRUCTION PURPOSES, ALL
<br />ARCH. Architectural FPRF. Fireproof RAID. Radius CONTRACTORS ARE REQUIRED TO REVIEW AND TREAT THEM AS A WHOLE IN
<br />ASB. Asbestos F.S. Full Size R.D. Roof Drain ORDER TO IDENTIFY ALL REQUIREMENTS THAT DIRECTLY OR INDIRECTLY AFFECT
<br />ASPH. Asphalt FT. Foot or Feet REF. Reference THEIR PORTION OF THE WORK, EVEN REQUIREMENTS LOCATED IN SECTIONS
<br />FTG. Footing REFR. Refrigerator DESIGNATED AS APPLICABLE TO OTHER TRADES OR IN DOCUMENTS PROVIDED BY
<br />BD. Board FURR. Furring RGTR. Register OTHER MEMBERS OF THE PROJECT DESIGN TEAM. UNLESS EXPRESSLY PROVIDED
<br />BITUM. Bituminous FUT. Future REINF. Reinforced OTHERWISE, THE INTENT IS TO INCLUDE ALL LABOR, MATERIALS, PRODUCTS AND
<br />BLDG. Building REQ. Required SERVICES NECESSARY OR APPROPRIATE FOR THE COMPLETED PROJECT AS
<br />BLK. Block GA. Gouge RESIL, Resilient CALLED FOR OR REASONABLY IMPLIED FROM THE PLANS AND SPECIFICATIONS
<br />BLKG. Blocking GALV. Galvanized RM. Room PROVIDED BY THE PROJECT'S DESIGN TEAM. IN CASE OF CONFLICTS OR
<br />BM. Beam G.B. Grab Bar R.O. Rough Opening OMISSIONS, THE AFFECTED CONTRACTOR IS REQUIRED TO EITHER OBTAIN
<br />B.O.C. Bottom of Concrete GL. Glass RWD. Redwood DIRECTION FROM AN APPROPRIATE REPRESENTATIVE OF THE OWNER, OR
<br />B4O.M. Bottom of Mullion GND, Ground R.W,L L. Rain Water Leader OTHERWISE TO APPLY THE MORE STRINGENT OR COSTLY STANDARD.
<br />B.O.P. Bottom of Panel GR. Grade
<br />B.O.R. Bottom of Reveal GYP. Gypsum S. South 3. IN INTERPRETING THESE PLANS, THE FOLLOWING GENERAL RULES APPLY:
<br />BOT. Bottom H.B. Hose Bibb SAF Self Adhered Flashing
<br />H.C. Hollow Core S,G. Solid Core
<br />CAB, Cabinet HDWD. Hardwood S.C.D. Seat Cover Dispenser A. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DRAWINGS
<br />G.B. Catch Basin HDWE. Hardware SCHED. Schedule B. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES
<br />CEM. Cement H.M. Hollow Metal S.D. Soap Dispenser AND TYPICAL DETAILS
<br />CER. Ceramic HORIZ. Horizontal SECT. Section C. WORK NOT PARTICULARLY SHOWN OR SPECIFIED SHALL BE THE SAME AS
<br />C.I. Cast Iron HR. Hour SH. Shelf SIMILAR PARTS THAT ARE SHOWN AND SPECIFIED
<br />C.G. Corner Guard HGT. Height SHR, Shower D, WORK SHOWN AS "NIC" IS FOR REFERENCE ONLY AND THE RESPONSIBILITY OF
<br />CLG. Ceiling SHT. Sheet THE CONTRACTOR ONLY TO THE EXTENT THAT THIS WORK MAY REQUIRE SOME
<br />CLKG. Caulking SIM. Similar REASONABLE PROTECTION OR COORDINATION EFFORTS.
<br />CLO. Closet I.D.NInside Diameter (Dim.) S.N.D. Sanitary Napkin Disp.
<br />CLR. Clear INT. Insulation S.N.R. Sanitary Napkin Recept.
<br />C. 0. Cased Opening INT. Interior
<br />p g SPEC. Specification
<br />COL. Column Jan. Janitor SQ. Square 4. THESE PLANS AND SPECIFICATIONS ARE INTENDED TO REPRESENT ONLY THE
<br />C.O.M. Center of Mullion JT, Joint S.ST, Stainless Steel FINISHED CONSTRUCTION. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL
<br />CONC. Concrete KIT. Kitchen STA. Service Sink CONSTRUCTION AND DEMOLITION MEANS, METHODS, TECHNIQUES, SEQUENCES AND
<br />CONK. Connection K.O. Knock Out STA. Station PROCEDURES INCLUDING ANY AND ALL SAFETY PRECAUTIONS AND PROGRAMS,
<br />CONSTR. Construction STD. Standard AND SHALL INDEMNIFY TO THE FULLEST EXTENT ALLOWED BY LAW THE OWNER
<br />CONT. Continuous STL. Steel AND THE PROJECT DESIGN TEAM FROM AND AGAINST ANY AND ALL RELATED
<br />C.O.R. Center of Reveal LAB. Laboratory STOR. Storage I
<br />LAM. Laminate a g^ CLAIMS AND LIABILITY.
<br />CORR. Corridor STRL. Structural
<br />CTSK. Countersunk LAV. Lavatory SUSP, Suspended 5. THESE PLANS AND SPECIFICATIONS ARE INTENDED TO SET FORTH THE
<br />CNTR. Counter LKR. Locker SYS. Symmetrical REQUIREMENTS FOR CONSTRUCTION IN ONLY AN INDUSTRY -STANDARD LEVEL OF
<br />CTR. Center LT. Light TRD. Tread QUALITY AND DETAIL, AND THEY ARE INTENDED TO BE SUPPLEMENTED BY
<br />DBL. Double T.B. Towel Bar APPROPRIATE REQUESTS FOR INFORMATION (RFIs). ERRORS AND OMISSIONS ARE
<br />MAX. Maximum T.C. Top of Curb TO BE EXPECTED AND ANTICIPATED, AND ALL CONTRACTORS ARE REQUIRED TO
<br />DEFT. Department NI.C, Medicine TEL. Telephone CAREFULLY REVIEW THESE PLANS FOR ERRORS AND OMISSIONS AND TO BRING
<br />D.F. Drinking Fountain MECH, Mechanical TER. Terrazzo THESE ERRORS AND OMISSIONS TO THE ATTENTION OF AN APPROPRIATE OWNER
<br />DIET. Detail MEMB. Membrane To & G. Tongue and Groove s
<br />DlA. Diameter g REPRESENTATIVE IN A TIMELY MANNER; AND ANY CONTRACTOR WHO FAILS TO DO
<br />MET. Metal THK. Thick SO BEFORE BIDDING OR OTHERWISE PROCEEDING ASSUMES THE RISK OF ANY
<br />DIM. Dimension MFR, Manufacturer T.0.C. Top of Concrete CONSEQUENCES.
<br />DISP. Dispenser MH. Manhole T.O.P, Top of Panel
<br />DN, Down MIN. Minimum T.O.R. Top of Reveal
<br />D.O. Door Opening MIR. Mirror T.O.RC. To of Dee Recess
<br />DR, Door p p 6. SCALED DIMENSIONS SHOULD BE CONSIDERED ONLY APPROXIMATE; AND IN Ae�#1
<br />MISC. Miscellaneous T.O.M. Top of Mullion EVENT ALL CONTRACTORS PROCEED AT THEIR OWN RISK IF THEY FAIL TO VERIFY
<br />DDr M.O. Masonry Opening T.O.WV'. Top of Wall AND FIELD MEASURE DIMENSIONS BEFORE PROCEEDING WITH ANY AFFECTED
<br />DS. S. Downspout MTD. Mounted T.P. To of Pavement
<br />D.S.P. Dr Standpipe p PROCUREMENT, FABRICATION OR CONSTRUCTION.
<br />yMUL. Mullion T.P.D. Toilet Paper Dispenser
<br />DWG Drawing T.V, Television
<br />E. East N. North T.W. Top of Wall 7. PLANS ARE TO BE CONSIDERED DIAGRAMMATIC IN NATURE AND INTENDED ONLY
<br />EA. Each N.I.C. Not In Contract TYP. Typical TO DEMONSTRATE THE RELATIONSHIP AMONG COMPONENT PARTS, AND NOT TO
<br />E.J. Expansion Joint NO. Number UNF. Unfinished DEPICT SPECIFIC LOCATIONS..
<br />EL, Elevation NOM. Nominal U.O.N. Unless Otherwise Noted
<br />ELEC. Electrical N.T.S, Not To Scale UR. Urinal 8, CONTRACTOR RFI's ARE INTENDED TO OBTAIN INFORMATION NOT AVAILABLE FROM
<br />ELEV. Elevator VERT, Vertical THE PLANS AND SPECIFICATIONS, RFI's WILL NOT BE PROCESSED THAT CAN BE
<br />EMER. Emergency 0. A. Overall VEST. Vestibule ANSWERED BY A REVIEW OF THESE DOCUMENTS, THAT REQUEST DIMENSIONS
<br />ENCL. Enoiosure OBS, ObscureW. THAT CAN BE OBTAINED FROM THE PLANS BY MATHEMATICAL CALCULATION THAT
<br />E.P. Electrical Panelboard O.C. On Center W/ With t ARE IN EFFECT A SUBSTITUTION SUBMITTAL, OR THAT SEEK DIRECTION
<br />EQ, Equal 0. D. Outside Diameter (Dim.) WCWater Closet CONCERNING CONSTRUCTION MEANS AND METHODS OR SAFETY PRECAUTIONS.
<br />,,
<br />EQPT. Equipment OFF. Office WHERE APPROPRIATE, RFI's SHOULD BE SPECIFIC AS TO WHICH PORTION OF THE
<br />E.W.C. Electric Water Cooler OPNG. Opening
<br />EXST. Existing OPP. Opposite �� WithoutPLANS AND SPECIFICATIONS NEEDS CLARIFICATION, AND WHAT INFORMATION IS
<br />EXPO. Exposed WPM Waterproofing Membrane REQUIRED,
<br />EXP. Expansion WRB Wheather/Water
<br />P EXT. Exterior Resistive Barrier 9. NO DEVIATIONS OR OMISSIONS FROM THE REQUIREMENTS OF THE PLANS AND
<br />WSCT. Wainscot SPECIFICATIONS PROVIDED BY THE PROJECT'S DESIGN TEAM ARE ALLOWED
<br />WT. Weight WITHOUT THE EXPRESSED AUTHORIZATION OF AN APPROPRIATE OWNER
<br />REPRESENTATIVE, AND THE RESPONSIBLE CONTRACTOR WILL INDEMNIFY AND HOLD
<br />HARMLESS THE OWNER AND THE PROJECT DESIGN TEAM FROM AND AGAINST THE
<br />SYMBOLS CONSEQUENCES OF ANY UNAUTHORIZED DEVIATIONS OR OMISSIONS. SUBSTITUTION
<br />SUBMITTALS WILL BE CONSIDERED ONLY IF THE PROPOSED SUBSTITUTION
<br />IMPROVES THE QUALITY OF THE PROJECT TO THE OWNER; AND IN NO EVENT WILL
<br />THE OWNER BE REQUIRED TO AUTHORIZE A SUBSTITUTION THAT IS NOT EQUAL IN
<br />QUALITY TO WHAT IS SPECIFIED.
<br />A INTERIOR ELEVATION VIEW
<br />ALIGN 10. DESIGN/BUILD CONTRACTOR SUBMITTALS WILL BE REVIEWED BY THE PROJECT
<br />INTERIOR ELEVATION REFERENCE DESIGN TEAM, IF AT ALL, ONLY FOR CONFORMANCE WITH THE AESTHETIC
<br />D X B ASPECTS AND MAJOR SPACE LIMITATIONS OF THE PROJECT; AND EACH
<br />OFFICE XX SHEET NUMBER DESIGN/BUILD CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING:
<br />OFFICE ROOM NAME
<br />FFICE - ROOM NUMBER C A. PREPARING ALL THE ENGINEERING AND OTHER DRAWINGS AND SPECIFICATIONS
<br />FOR THE COMPONENTS OF ITS DESIGN/BUILD UNDERTAKING.
<br />WALL MATERIAL TYPE
<br />P B. COMPLYING WITH THE PROJECT'S REQUIREMENTS AND SPACE LIMITATIONS.
<br />1 TYPE NUMBER C. COORDINATION AND INTERFACING WITH OTHER TRADES AND CONSULTANTS.
<br />D. OBTAINING ANY REQUIRED OR APPROPRIATE APPROVALS FROM AUTHORITIES
<br />101 DOOR NUMBER HAVING JURISDICTION OVER THE PROJECT.
<br />C FLOOR MATERIAL TYPE E. HAVING THEIR DESIGN CONSULTANTS SERVE AS THE PROFESSIONAL OF RECORD
<br />TYPE NUMBER FOR THE PORTIONS OF WORK WHICH THEY DESIGN.
<br />EXISTING DOOR 11. AT THE CONCLUSION OF THE CONSTRUCTION, EACH PRIME CONTRACTOR SHALL
<br />PL MISC. MATERIAL TYPE PROVIDE SUCH WRITTEN CERTIFICATION THAT THE CONSTRUCTION HAS BEEN
<br />1 TYPE NUMBER PERFORMED IN COMPLIANCE WITH THE PROJECT'S APPROVED PLANS AND
<br />SPECIFICATIONS AS THE BUILDING OFFICIAL WITH JURISDICTION OVER THE PROJECT
<br />MAY REQUIRE, OR AS THE OWNER MAY REASONABLY REQUEST.
<br />X DETAIL REFERENCE XXX KEYNOTE INDICATOR 12. VERSIONS OF THESE PLANS PROVIDED IN ANY ELECTRONIC FORM ARE SUBJECT
<br />XX TO THE SAME PROVISION AS THE OTHER INSTRUMENTS OF SERVICE PREPARED BY
<br />SHEET NUMBER OR ON BEHALF OF THE PROJECT DESIGN TEAM, INCLUDING WITHOUT LIMITATION
<br />XXX FINISH INDICATOR THEIR COMMON LAW, STATUTORY OR OTHER RESERVED RIGHTS, INCLUDING
<br />COPYRIGHTS. A RECIPIENT IS GRANTED AT MOST A TRANSFERABLE
<br />X DETAIL SECTION REFERENCE NONEXCLUSIVE LICENSE TO REUSE THE PLANS SOLELY FOR PROJECT PURPOSES;
<br />XX SHEET NUMBER REVISION AND NO RECIPIENT IS AUTHORIZED TO USE OR TO ALLOW THE USE OF ALL OR
<br />ANY PORTION OF THESE PLANS FOR ANY OTHER PURPOSE, AND ANY OTHER USE
<br />FOR ANY OTHER PURPOSE COULD CONSTITUTE ACTIONABLE PLAGIARISM. ANY
<br />ELECTRONIC DOCUMENTS WILL BE PROVIDED IN THE RESPONSIBLE DESIGN
<br />X DETAIL SECTION REFERENCE PROFESSIONAL'S STANDARD FORMATS AND CONVENTIONS AND WITH NO
<br />XX SHEET NUMBER GUARANTEE OF THE ABSENCE OF VIRUSES OR OTHER HARMFUL MATERIAL, OR OF
<br />FIRE EXTINGUISHER, CABINET COMPATIBILITY WITH ANY RECIPIENTS SOFTWARE OR HARDWARE SO THAT ANY
<br />W/ FIRE EXTINGUISHER USE WITH OR CONVERSION TO THE OTHER FORMS OR CONVENTIONS, OR THE USE
<br />EXTERIOR ELEVATION REFERENCE , s WITH ANY PARTICULAR SOFTWARE OR HARDWARE, IS AT THE RECIPIENT'S SOLE
<br />X HALL -MOUNTED FIRE RISK,
<br />XX SHEET NUMBER EXTINGUISHER
<br />,I
<br />N
<br />(1)
<br />NO SCALE
<br />VICINITY MAP
<br />COLLIERS INTERNATIONAL
<br />5500 HARBOUR HEIGHTS PARKWAY, SUITE 107 JOHN BAUSCH
<br />MUKILTEO, WA 98275 PH: (425) 315-1354
<br />John.Bausch@coliiers.com
<br />REPRESENTATIVESAGENCY
<br />COURTUS
<br />SECURITI'/USMS OFFICE OF THE CIRCUIT EXECUTIVE
<br />PAMELA CARTER FOR THE NINTH CIRCUIT
<br />pamela.carter@usdoj,gov DANIEL NORDSON
<br />dnordson@ce9.uscourts.gov
<br />IT
<br />DAVE DECKER
<br />david-decker@wawp.uscourts.gov
<br />SPACE & FACILITIES SPECIALIST
<br />ANGELA POSTEN
<br />angela-posten@wawd.uscourts.gov
<br />JOB SITE NOTE:
<br />1, WHERE EXISTING TENANTS/BUSINESSES ARE ADJACENT TO THE JOB SITE/TENANT,
<br />THE CONTRACTOR SHALL MINIMIZE CONSTRUCTION NOISE - EXTREMELY NOISY
<br />CONSTRUCTION SHALL OCCUR AT NON -TYPICAL BUSINESS HOURS. CONTRACTOR
<br />SHOULD NOTIFY BUILDING REPRESENTATIVE OF SPECIAL CIRCUMSTANCES IN
<br />ADVANCE PRIOR TO WORK.
<br />2. THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND
<br />SURROUNDING AREA FREE FROM DUST AND DEBRIS. THE WORK SHALL BE IN
<br />CONFORMANCE WITH THE AIR AND WATER POLLUTION CONTROL STANDARDS AND
<br />REGULATIONS OF THE STATE DEPARTMENT OF HEALTH.
<br />3. CONSTRUCTION DEBRIS AND WASTES SHALL BE DEPOSITED AT AN APPROPRIATE
<br />SITE. THE CONTRACTOR SHALL INFORM THE BUILDING REPRESENTATIVE OF THE
<br />LOCATION OF DISPOSAL SITES.
<br />4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB
<br />AFTER ITS COMPLETION. WHERE APPLICABLE, CLEANING SHALL INCLUDE, BUT
<br />NOT BE LIMITED TO, THE EXTERIOR AND THE INTERIOR OF THE BUILDING, THE
<br />PATH OF TRAVEL TO THE JOB SITE, PARKING LOTS, ELEVATORS, LOBBIES, AND
<br />CORRIDOR CARPETS.
<br />5. THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED
<br />PER STATE AND LOCAL CODES.
<br />6, IF TRENCHES OR EXCAVATIONS 5-0" OR MORE IN DEPTH ARE REQUIRED, OBTAIN
<br />ISSUANCE OF A BUILDING OR GRADING PERMIT.
<br />7. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING
<br />WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE &
<br />COUNTY REQUIREMENTS.
<br />8. CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF SUPPLY AND RETURN
<br />AIR GRILLES, DIFFUSERS & DUCTS TO KEEP DUST FROM ENTERING INTO BUILDING
<br />AIR DISTRIBUTION SYSTEMS,
<br />9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE
<br />SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES.
<br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE
<br />BUILDING AND SITE WHILE JOB IS IN PROGRESS AND UNTIL THE JOB IS
<br />COMPLETED.
<br />DRAWING NOTES:
<br />1. UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE DOCUMENTS
<br />SHALL BE TO FACE OF CURB, FACE OF CONCRETE OR MASONRY, FACE OF FINISH
<br />OR CENTERLINE of GRIDS.
<br />2. ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, U.O.N.
<br />3. DIMENSIONS SHOWN IN FIGURES TAKE PRECEDENCE OVER DIMENSIONS SCALED
<br />FROM DRAWINGS. LARGE SCALE DRAWINGS AND DETAILS TAKE PRECEDENCE OVER
<br />SMALLER SCALE DRAWINGS.
<br />4. THE TERM "ALIGN", AS USED IN THESE DOCUMENTS, SHALL MEAN TO
<br />ACCURATELY LOCATE FINISHES IN THE SAME PLANE,
<br />5, "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS
<br />THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT,
<br />U.O.N.
<br />6. DETAILS ARE USUALLY KEYED AND NOTED "TYPICAL" ONLY ONCE, WHEN THEY
<br />FIRST OCCUR AND ARE REPRESENTATIVE OF ALL SIMILAR CONDITIONS
<br />THROUGHOUT, U.O.N.
<br />7, COLUMN CENTERLINES (GRID LINES) ARE SHOWN FOR DIMENSIONING PURPOSES.
<br />8. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF
<br />THE WORK, THE DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK IN
<br />THE SAME BUILDING.
<br />INTERIOR / EXTERIOR NOTES:
<br />1. WHERE ELECTRICAL, MECHANICAL AND/OR PLUMBING ITEMS, SUCH AS LIGHTS,
<br />DUCTS, PIPING, DOWNSPOUTS, ETC, ARE TO PENETRATE ANY BUILDING FOOTINGS,
<br />SLABS, FLOORS, STRUCTURAL FRAMING, WALL PARTITIONS, CEILINGS, ETC., IT IS
<br />REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE
<br />FURNISHED. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL ITEMS
<br />WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION OF
<br />STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY CONFLICT OR
<br />DISCREPANCY WITHIN CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE
<br />ARCHITECT'S ATTENTION FOR CLARIFICATION.
<br />2. CONTRACTOR, ALONG WITH MECHANICAL CONTRACTOR, SHALL PROVIDE AND
<br />LOCATE ACCESS DOORS/PANELS IN WALL & CEILING CONSTRUCTION AS REQUIRED
<br />TO PROVIDE ACCESS TO MECHANICAL, FIRE SPRINKLER, PLUMBING & ELECTRICAL
<br />WORK. CONTRACTOR SHALL SUBMIT A PLAN OF ALL PROPOSED ACCESS PANEL
<br />LOCATIONS TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION.
<br />3. ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN
<br />RATING.
<br />4. WHERE OCCURS, CONTRACTOR SHALL PATCH ANY EXISTING WALLS AND/OR
<br />CEILINGS AS NEEDED TO REFURBISH THE LEASE SPACE AND REPAIR ALL
<br />DAMAGES CAUSED BY CONTRACTOR
<br />5, INTERIOR WALLS AND CEILINGS SHALL BE INSTALLED IN ACCORDANCE TO STATE &
<br />LOCAL CODES, INCLUDING REQUIREMENTS FOR FLAME SPREAD AND SMOKE
<br />DENSITY RATINGS FOR FINISH MATERIALS.
<br />6. WHEN USED, ALL NOISE BARRIER BATTS (SOUND INSULATION) AND INSULATION
<br />BATTS SHALL BE NON-COMBUSTIBLE AND SHALL NOT CONTAIN OR UTILIZE
<br />OZONE DEPLETING COMPOUNDS.
<br />7. ALL NET CONSTRUCTION MATERIALS SHALL BE 100% ASBESTOS -FREE.
<br />ARCHITECT
<br />GSA PM
<br />PBS, NORTHWEST/ARCTIC REGION
<br />400 15TH ST SW
<br />AUBURN, WA 98001
<br />ILDING D P T �E T; CITY OF EVERETT, WASHINGTON
<br />ARCH ITECTURAL
<br />(15 SHEETS) LL
<br />LJ
<br />Of
<br />o
<br />AO.1
<br />TITLE SHEET
<br />Cf)
<br />r)
<br />ILD. O IE: 2018
<br />INTERNATIONAL BUILDING CODE
<br />AO.2
<br />GENERAL NOTES
<br />2018
<br />INTERNATIONAL EXISTING BUILDING CODE
<br />Q
<br />2018
<br />INTERNATIONAL MECHANICAL CODE
<br />AO.3
<br />ACCESSIBILITY DETAILS
<br />J
<br />2018
<br />INTERNATIONAL FIRE CODE
<br />2018
<br />WASHINGTON STATE ENERGY CODE
<br />A1.1
<br />OCCUPANCY AND EGRESS PLAN
<br />2018
<br />UNIFORM PLUMBING CODE
<br />o
<br />2020
<br />NFPA 70, NATIONAL ELECTRIC CODE
<br />ADA
<br />DEMOLITION FLOOR PLAN
<br />2018
<br />WASHINGTON STATE-WIDE AMENDMENTS
<br />Ld
<br />2009
<br />ICC A117.1 - ANSI
<br />AD.2
<br />DEMOLITION REFLECTED CEILING PLAN
<br />t-
<br />A2.1
<br />FLOOR PLAN
<br />z
<br />A3.1
<br />POWER AND SIGNAL & FURNITURE PLANLd
<br />n
<br />�
<br />A3 1 a
<br />SECURITY PLAN
<br />OCCUPANCY CLA IFI ATiON- PER IBC CHAPTER 3 (SECTION 302) - B LU
<br />A4.1 REFLECTED CEILING PLAN
<br />� r �
<br />PER IBC CHAPTER 7 - N/A
<br />AL).1
<br />FINISH PLAN
<br />Cn
<br />A6.1
<br />ENLARGED RESTROOM PLAN & ELEVATIONS
<br />TYPE OF CONSTRUCTION:
<br />PER IBC CHAPTER 6 SECTION 602 - II-FR
<br />( )
<br /><
<br />A�.2
<br />INTERIOR ELEVATIONS �c SECTIONS
<br />A7.1
<br />DOOR & HARDWARE SCHEDULE
<br />0
<br />P I LERE :
<br />NO
<br />v�
<br />A8.1
<br />DETAILS
<br />Li
<br />NUMBER OF STORIES:
<br />4
<br />ASSESSOR'S PARCEL O.:
<br />28051800305400
<br />ACOUSTIC
<br />DESIGN REMEWSEE
<br />U
<br />cn
<br />ATTACHED
<br />of
<br />w
<br />PROJECT SCOPE:
<br />THE SCOPE OF THIS PROJECT IS A 3RD FLOOR
<br />0
<br />LLJ
<br />SECOND GENERATION TENANT IMPROVEMENT OF
<br />EXISTING SPACE WHERE SUITE 306 IS EXPANDING CD 00
<br />O� >-
<br />INTO SUITE #310 FOR USE OF OFFICE. DEMOLITION TO CD
<br />INCLUDE WALLS, CEILING, LIGHTING TING AND FINISHES. NEW � �
<br />CONSTRUCTION TO INCLUDE PARTITION WALLS, DOORS, a_
<br />CEILING, LIGHTING AND FINISHES.PAPPRO' L
<br />�, t= bCN
<br />C)sAWilNaY �
<br />u
<br />T NANT OCCUPANCY: OFFICE (B) 3,933 USF B Y. Z_
<br />D __c� _° can
<br />Cn
<br />E5
<br />714is SET OF W 0 F_
<br />g * •I SHALL,
<br />UJ
<br />U N 1105 SITEF- W
<br />'U TmjE .
<br />CITY OF
<br />REVIEV
<br />PERM� UJ
<br />,014PPROVED"OP co
<br />PQJFPL10V,V10RKS, FIRE
<br />LLJ
<br />co CD
<br />�-
<br />w
<br />a
<br />m
<br />ar
<br />OEM", alumv
<br />X
<br />Ld
<br />s < w
<br />"he K ° of's per"M 0 M, not >- w
<br />be Comm, a a . aldwzytov <
<br />0 z 0
<br />the nw fitC) LLJ
<br />applCoMe . 7h
<br />issuem 1- a" ' , - CD cf)
<br />LLJ 41 ., , i
<br />dMa hW Im pmma 1 ft am coo, F4 F4
<br />owG Eu®�
<br />_J CN o
<br />Q C7
<br />CD
<br />SUBMITTALS -DEFERRED Zr4 M _ _
<br />Z
<br />DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT AND ENGINEERS OF RECORD WHO SHALL REVIEW AND PROVIDE NOTATION INDICATING v
<br />DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE WITH THE BUILDING DESIGN, SUBMITTAL MATERIALS SHALL INCLUDE PLANS, -J
<br />DETAILS AND CALCULATIONS PREPARED AND SIGNED BY A STATE REGISTERED ENGINEER. o `' Q
<br />CONTRACTOR SHALL SUBMIT ARCHITECT AND ENGINEER REVIEWED SUBMITTAL MATERIALS TO THE BUILDING OFFICIAL FOR REVIEW AND PERMIT APPROVAL. W
<br />DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED PRIOR TO OBTAINING THE BUILDING OFFICIAL'S APPROVAL OF THE SUBMITTAL. Ld = ILLJ
<br />a_
<br />'> 0 0 fLLI
<br />-
<br />Q ���' LJ
<br />nsv
<br />LJ v
<br />= W W C) Z < o
<br />F-
<br />o o� o 0 CD
<br />c�
<br />0 a n to 0 0 0
<br />cn c„ �i v1 M Cn
<br />Q of6-5 cry Lo
<br />> c- o(D00
<br />cv cv c14 cv cv o 0 0 � C) CD o
<br />LLJ N c� v c�i c� cN cv cv
<br />a_
<br />0 < N o r caa ED
<br />� c�i cv
<br />o o N c_i cNi ® oCf
<br />0
<br />LLJ
<br />DIANA TA, PROJECT MANAGER
<br />THE GOVERNMENT RETAINS THE RIGHT TO REVIEW AND APPROVE MANY ASPECTS OF THE LESSOR'S DESIGN, INCLUDING WITHOUT LIMITATION, REVIEW OF THE
<br />PA i PM: C.KANG
<br />PH: (253) 326-0068
<br />LESSOR'S DESIGN AND CONSTRUCTION DRAWINGS, SHOP DRAWINGS, PRODUCT DATA, FINISH SAMPLES, AND COMPLETED BASED BUILDING AND Tl CONSTRUCTION.
<br />�
<br />diona.ta@gso.gov
<br />SUCH REVIEW ,AND APPROVAL IS INTENDED TO IDENTIFY POTENTIAL DESIGN FLAWS, TO MINIMIZE COSTLY MISDIRECTION OF EFFORT, AND TO ASSIST THE LESSOR