Laserfiche WebLink
7D <br />0 <br />Q <br />I <br />0 <br />0 <br />0 <br />U <br />/ <br />/ <br />U <br />U <br />Q <br />/ <br />0 <br />0 <br />/ <br />0 <br />0 <br />Q0 <br />0 <br />N <br />Q <br />w <br />On <br />GENERAL PROJECT NOTES <br />& And F.A. Fire Alarm PRCST. Pre -cast GENERAL.. NOTES: <br />Z_ Angle F.e, Flat Bar PL. Plate 1. ALL WORK SHALL BE PERFORMED SO AS TO COMPLY WITH ALL LEGAL, INDUSTRY <br />@ At F.D. Floor Drain P.LAM. Plastic Laminate AND PROJECT -SPECIFIC REQUIREMENTS AND STANDARDS INCLUDING WITHOUT <br />C Centerline FDN. Foundation PLAS. Plaster LIMITATION OF THE FOLLOWING: <br />F.E. Fire Extinguisher PLYWD. Plywood <br />Diameter or Round F.E.C. Fire Extinguisher Cab PR. Pair <br /># Pound or Number F.H.C. Fire Hose Cabinet PT. Point A. ALL APPLICABLE BUILDING CODES <br />(E) Existing FIN. Finish P.T.D Paper Towel Dispenser B. ALL APPLICABLE SPECIALTY CODES INCLUDING THE MOST CURRENT ISSUES AND <br />FL. Floor P.T,D,✓R Combination Paper Towel SUPPLEMENTS <br />ACOUS Acoustical FLASH. Flashing PTN. Partition C. THE PROJECT MANUAL AND ASSOCIATED SPECIFICATIONS <br />A.D. Area Drain FLUOR. Fluorescent P.T.R. Paper Towel Receptacle D. THE MANUFACTURER'S REQUIREMENTS OR RECOMMENDATIONS <br />ADJ. Adjustable F.O.C. Face of Concrete P.J. Panel Joint E. ALL APPLICABLE LANDLORD BUILDING STANDARDS <br />AGGR. Aggregate F.O.F. Face of Finish <br />AL. Aluminum F.O.M. Face of Mullion Q.T. Quarry Tile <br />APPROX. Approximate F.O.SH. Face of Sheathing R. Riser 2. IN USING THESE PLANS FOR BIDDING OR CONSTRUCTION PURPOSES, ALL <br />ARCH. Architectural FPRF. Fireproof RAID. Radius CONTRACTORS ARE REQUIRED TO REVIEW AND TREAT THEM AS A WHOLE IN <br />ASB. Asbestos F.S. Full Size R.D. Roof Drain ORDER TO IDENTIFY ALL REQUIREMENTS THAT DIRECTLY OR INDIRECTLY AFFECT <br />ASPH. Asphalt FT. Foot or Feet REF. Reference THEIR PORTION OF THE WORK, EVEN REQUIREMENTS LOCATED IN SECTIONS <br />FTG. Footing REFR. Refrigerator DESIGNATED AS APPLICABLE TO OTHER TRADES OR IN DOCUMENTS PROVIDED BY <br />BD. Board FURR. Furring RGTR. Register OTHER MEMBERS OF THE PROJECT DESIGN TEAM. UNLESS EXPRESSLY PROVIDED <br />BITUM. Bituminous FUT. Future REINF. Reinforced OTHERWISE, THE INTENT IS TO INCLUDE ALL LABOR, MATERIALS, PRODUCTS AND <br />BLDG. Building REQ. Required SERVICES NECESSARY OR APPROPRIATE FOR THE COMPLETED PROJECT AS <br />BLK. Block GA. Gouge RESIL, Resilient CALLED FOR OR REASONABLY IMPLIED FROM THE PLANS AND SPECIFICATIONS <br />BLKG. Blocking GALV. Galvanized RM. Room PROVIDED BY THE PROJECT'S DESIGN TEAM. IN CASE OF CONFLICTS OR <br />BM. Beam G.B. Grab Bar R.O. Rough Opening OMISSIONS, THE AFFECTED CONTRACTOR IS REQUIRED TO EITHER OBTAIN <br />B.O.C. Bottom of Concrete GL. Glass RWD. Redwood DIRECTION FROM AN APPROPRIATE REPRESENTATIVE OF THE OWNER, OR <br />B4O.M. Bottom of Mullion GND, Ground R.W,L L. Rain Water Leader OTHERWISE TO APPLY THE MORE STRINGENT OR COSTLY STANDARD. <br />B.O.P. Bottom of Panel GR. Grade <br />B.O.R. Bottom of Reveal GYP. Gypsum S. South 3. IN INTERPRETING THESE PLANS, THE FOLLOWING GENERAL RULES APPLY: <br />BOT. Bottom H.B. Hose Bibb SAF Self Adhered Flashing <br />H.C. Hollow Core S,G. Solid Core <br />CAB, Cabinet HDWD. Hardwood S.C.D. Seat Cover Dispenser A. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DRAWINGS <br />G.B. Catch Basin HDWE. Hardware SCHED. Schedule B. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES <br />CEM. Cement H.M. Hollow Metal S.D. Soap Dispenser AND TYPICAL DETAILS <br />CER. Ceramic HORIZ. Horizontal SECT. Section C. WORK NOT PARTICULARLY SHOWN OR SPECIFIED SHALL BE THE SAME AS <br />C.I. Cast Iron HR. Hour SH. Shelf SIMILAR PARTS THAT ARE SHOWN AND SPECIFIED <br />C.G. Corner Guard HGT. Height SHR, Shower D, WORK SHOWN AS "NIC" IS FOR REFERENCE ONLY AND THE RESPONSIBILITY OF <br />CLG. Ceiling SHT. Sheet THE CONTRACTOR ONLY TO THE EXTENT THAT THIS WORK MAY REQUIRE SOME <br />CLKG. Caulking SIM. Similar REASONABLE PROTECTION OR COORDINATION EFFORTS. <br />CLO. Closet I.D.NInside Diameter (Dim.) S.N.D. Sanitary Napkin Disp. <br />CLR. Clear INT. Insulation S.N.R. Sanitary Napkin Recept. <br />C. 0. Cased Opening INT. Interior <br />p g SPEC. Specification <br />COL. Column Jan. Janitor SQ. Square 4. THESE PLANS AND SPECIFICATIONS ARE INTENDED TO REPRESENT ONLY THE <br />C.O.M. Center of Mullion JT, Joint S.ST, Stainless Steel FINISHED CONSTRUCTION. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL <br />CONC. Concrete KIT. Kitchen STA. Service Sink CONSTRUCTION AND DEMOLITION MEANS, METHODS, TECHNIQUES, SEQUENCES AND <br />CONK. Connection K.O. Knock Out STA. Station PROCEDURES INCLUDING ANY AND ALL SAFETY PRECAUTIONS AND PROGRAMS, <br />CONSTR. Construction STD. Standard AND SHALL INDEMNIFY TO THE FULLEST EXTENT ALLOWED BY LAW THE OWNER <br />CONT. Continuous STL. Steel AND THE PROJECT DESIGN TEAM FROM AND AGAINST ANY AND ALL RELATED <br />C.O.R. Center of Reveal LAB. Laboratory STOR. Storage I <br />LAM. Laminate a g^ CLAIMS AND LIABILITY. <br />CORR. Corridor STRL. Structural <br />CTSK. Countersunk LAV. Lavatory SUSP, Suspended 5. THESE PLANS AND SPECIFICATIONS ARE INTENDED TO SET FORTH THE <br />CNTR. Counter LKR. Locker SYS. Symmetrical REQUIREMENTS FOR CONSTRUCTION IN ONLY AN INDUSTRY -STANDARD LEVEL OF <br />CTR. Center LT. Light TRD. Tread QUALITY AND DETAIL, AND THEY ARE INTENDED TO BE SUPPLEMENTED BY <br />DBL. Double T.B. Towel Bar APPROPRIATE REQUESTS FOR INFORMATION (RFIs). ERRORS AND OMISSIONS ARE <br />MAX. Maximum T.C. Top of Curb TO BE EXPECTED AND ANTICIPATED, AND ALL CONTRACTORS ARE REQUIRED TO <br />DEFT. Department NI.C, Medicine TEL. Telephone CAREFULLY REVIEW THESE PLANS FOR ERRORS AND OMISSIONS AND TO BRING <br />D.F. Drinking Fountain MECH, Mechanical TER. Terrazzo THESE ERRORS AND OMISSIONS TO THE ATTENTION OF AN APPROPRIATE OWNER <br />DIET. Detail MEMB. Membrane To & G. Tongue and Groove s <br />DlA. Diameter g REPRESENTATIVE IN A TIMELY MANNER; AND ANY CONTRACTOR WHO FAILS TO DO <br />MET. Metal THK. Thick SO BEFORE BIDDING OR OTHERWISE PROCEEDING ASSUMES THE RISK OF ANY <br />DIM. Dimension MFR, Manufacturer T.0.C. Top of Concrete CONSEQUENCES. <br />DISP. Dispenser MH. Manhole T.O.P, Top of Panel <br />DN, Down MIN. Minimum T.O.R. Top of Reveal <br />D.O. Door Opening MIR. Mirror T.O.RC. To of Dee Recess <br />DR, Door p p 6. SCALED DIMENSIONS SHOULD BE CONSIDERED ONLY APPROXIMATE; AND IN Ae�#1 <br />MISC. Miscellaneous T.O.M. Top of Mullion EVENT ALL CONTRACTORS PROCEED AT THEIR OWN RISK IF THEY FAIL TO VERIFY <br />DDr M.O. Masonry Opening T.O.WV'. Top of Wall AND FIELD MEASURE DIMENSIONS BEFORE PROCEEDING WITH ANY AFFECTED <br />DS. S. Downspout MTD. Mounted T.P. To of Pavement <br />D.S.P. Dr Standpipe p PROCUREMENT, FABRICATION OR CONSTRUCTION. <br />yMUL. Mullion T.P.D. Toilet Paper Dispenser <br />DWG Drawing T.V, Television <br />E. East N. North T.W. Top of Wall 7. PLANS ARE TO BE CONSIDERED DIAGRAMMATIC IN NATURE AND INTENDED ONLY <br />EA. Each N.I.C. Not In Contract TYP. Typical TO DEMONSTRATE THE RELATIONSHIP AMONG COMPONENT PARTS, AND NOT TO <br />E.J. Expansion Joint NO. Number UNF. Unfinished DEPICT SPECIFIC LOCATIONS.. <br />EL, Elevation NOM. Nominal U.O.N. Unless Otherwise Noted <br />ELEC. Electrical N.T.S, Not To Scale UR. Urinal 8, CONTRACTOR RFI's ARE INTENDED TO OBTAIN INFORMATION NOT AVAILABLE FROM <br />ELEV. Elevator VERT, Vertical THE PLANS AND SPECIFICATIONS, RFI's WILL NOT BE PROCESSED THAT CAN BE <br />EMER. Emergency 0. A. Overall VEST. Vestibule ANSWERED BY A REVIEW OF THESE DOCUMENTS, THAT REQUEST DIMENSIONS <br />ENCL. Enoiosure OBS, ObscureW. THAT CAN BE OBTAINED FROM THE PLANS BY MATHEMATICAL CALCULATION THAT <br />E.P. Electrical Panelboard O.C. On Center W/ With t ARE IN EFFECT A SUBSTITUTION SUBMITTAL, OR THAT SEEK DIRECTION <br />EQ, Equal 0. D. Outside Diameter (Dim.) WCWater Closet CONCERNING CONSTRUCTION MEANS AND METHODS OR SAFETY PRECAUTIONS. <br />,, <br />EQPT. Equipment OFF. Office WHERE APPROPRIATE, RFI's SHOULD BE SPECIFIC AS TO WHICH PORTION OF THE <br />E.W.C. Electric Water Cooler OPNG. Opening <br />EXST. Existing OPP. Opposite �� WithoutPLANS AND SPECIFICATIONS NEEDS CLARIFICATION, AND WHAT INFORMATION IS <br />EXPO. Exposed WPM Waterproofing Membrane REQUIRED, <br />EXP. Expansion WRB Wheather/Water <br />P EXT. Exterior Resistive Barrier 9. NO DEVIATIONS OR OMISSIONS FROM THE REQUIREMENTS OF THE PLANS AND <br />WSCT. Wainscot SPECIFICATIONS PROVIDED BY THE PROJECT'S DESIGN TEAM ARE ALLOWED <br />WT. Weight WITHOUT THE EXPRESSED AUTHORIZATION OF AN APPROPRIATE OWNER <br />REPRESENTATIVE, AND THE RESPONSIBLE CONTRACTOR WILL INDEMNIFY AND HOLD <br />HARMLESS THE OWNER AND THE PROJECT DESIGN TEAM FROM AND AGAINST THE <br />SYMBOLS CONSEQUENCES OF ANY UNAUTHORIZED DEVIATIONS OR OMISSIONS. SUBSTITUTION <br />SUBMITTALS WILL BE CONSIDERED ONLY IF THE PROPOSED SUBSTITUTION <br />IMPROVES THE QUALITY OF THE PROJECT TO THE OWNER; AND IN NO EVENT WILL <br />THE OWNER BE REQUIRED TO AUTHORIZE A SUBSTITUTION THAT IS NOT EQUAL IN <br />QUALITY TO WHAT IS SPECIFIED. <br />A INTERIOR ELEVATION VIEW <br />ALIGN 10. DESIGN/BUILD CONTRACTOR SUBMITTALS WILL BE REVIEWED BY THE PROJECT <br />INTERIOR ELEVATION REFERENCE DESIGN TEAM, IF AT ALL, ONLY FOR CONFORMANCE WITH THE AESTHETIC <br />D X B ASPECTS AND MAJOR SPACE LIMITATIONS OF THE PROJECT; AND EACH <br />OFFICE XX SHEET NUMBER DESIGN/BUILD CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: <br />OFFICE ROOM NAME <br />FFICE - ROOM NUMBER C A. PREPARING ALL THE ENGINEERING AND OTHER DRAWINGS AND SPECIFICATIONS <br />FOR THE COMPONENTS OF ITS DESIGN/BUILD UNDERTAKING. <br />WALL MATERIAL TYPE <br />P B. COMPLYING WITH THE PROJECT'S REQUIREMENTS AND SPACE LIMITATIONS. <br />1 TYPE NUMBER C. COORDINATION AND INTERFACING WITH OTHER TRADES AND CONSULTANTS. <br />D. OBTAINING ANY REQUIRED OR APPROPRIATE APPROVALS FROM AUTHORITIES <br />101 DOOR NUMBER HAVING JURISDICTION OVER THE PROJECT. <br />C FLOOR MATERIAL TYPE E. HAVING THEIR DESIGN CONSULTANTS SERVE AS THE PROFESSIONAL OF RECORD <br />TYPE NUMBER FOR THE PORTIONS OF WORK WHICH THEY DESIGN. <br />EXISTING DOOR 11. AT THE CONCLUSION OF THE CONSTRUCTION, EACH PRIME CONTRACTOR SHALL <br />PL MISC. MATERIAL TYPE PROVIDE SUCH WRITTEN CERTIFICATION THAT THE CONSTRUCTION HAS BEEN <br />1 TYPE NUMBER PERFORMED IN COMPLIANCE WITH THE PROJECT'S APPROVED PLANS AND <br />SPECIFICATIONS AS THE BUILDING OFFICIAL WITH JURISDICTION OVER THE PROJECT <br />MAY REQUIRE, OR AS THE OWNER MAY REASONABLY REQUEST. <br />X DETAIL REFERENCE XXX KEYNOTE INDICATOR 12. VERSIONS OF THESE PLANS PROVIDED IN ANY ELECTRONIC FORM ARE SUBJECT <br />XX TO THE SAME PROVISION AS THE OTHER INSTRUMENTS OF SERVICE PREPARED BY <br />SHEET NUMBER OR ON BEHALF OF THE PROJECT DESIGN TEAM, INCLUDING WITHOUT LIMITATION <br />XXX FINISH INDICATOR THEIR COMMON LAW, STATUTORY OR OTHER RESERVED RIGHTS, INCLUDING <br />COPYRIGHTS. A RECIPIENT IS GRANTED AT MOST A TRANSFERABLE <br />X DETAIL SECTION REFERENCE NONEXCLUSIVE LICENSE TO REUSE THE PLANS SOLELY FOR PROJECT PURPOSES; <br />XX SHEET NUMBER REVISION AND NO RECIPIENT IS AUTHORIZED TO USE OR TO ALLOW THE USE OF ALL OR <br />ANY PORTION OF THESE PLANS FOR ANY OTHER PURPOSE, AND ANY OTHER USE <br />FOR ANY OTHER PURPOSE COULD CONSTITUTE ACTIONABLE PLAGIARISM. ANY <br />ELECTRONIC DOCUMENTS WILL BE PROVIDED IN THE RESPONSIBLE DESIGN <br />X DETAIL SECTION REFERENCE PROFESSIONAL'S STANDARD FORMATS AND CONVENTIONS AND WITH NO <br />XX SHEET NUMBER GUARANTEE OF THE ABSENCE OF VIRUSES OR OTHER HARMFUL MATERIAL, OR OF <br />FIRE EXTINGUISHER, CABINET COMPATIBILITY WITH ANY RECIPIENTS SOFTWARE OR HARDWARE SO THAT ANY <br />W/ FIRE EXTINGUISHER USE WITH OR CONVERSION TO THE OTHER FORMS OR CONVENTIONS, OR THE USE <br />EXTERIOR ELEVATION REFERENCE , s WITH ANY PARTICULAR SOFTWARE OR HARDWARE, IS AT THE RECIPIENT'S SOLE <br />X HALL -MOUNTED FIRE RISK, <br />XX SHEET NUMBER EXTINGUISHER <br />,I <br />N <br />(1) <br />NO SCALE <br />VICINITY MAP <br />COLLIERS INTERNATIONAL <br />5500 HARBOUR HEIGHTS PARKWAY, SUITE 107 JOHN BAUSCH <br />MUKILTEO, WA 98275 PH: (425) 315-1354 <br />John.Bausch@coliiers.com <br />REPRESENTATIVESAGENCY <br />COURTUS <br />SECURITI'/USMS OFFICE OF THE CIRCUIT EXECUTIVE <br />PAMELA CARTER FOR THE NINTH CIRCUIT <br />pamela.carter@usdoj,gov DANIEL NORDSON <br />dnordson@ce9.uscourts.gov <br />IT <br />DAVE DECKER <br />david-decker@wawp.uscourts.gov <br />SPACE & FACILITIES SPECIALIST <br />ANGELA POSTEN <br />angela-posten@wawd.uscourts.gov <br />JOB SITE NOTE: <br />1, WHERE EXISTING TENANTS/BUSINESSES ARE ADJACENT TO THE JOB SITE/TENANT, <br />THE CONTRACTOR SHALL MINIMIZE CONSTRUCTION NOISE - EXTREMELY NOISY <br />CONSTRUCTION SHALL OCCUR AT NON -TYPICAL BUSINESS HOURS. CONTRACTOR <br />SHOULD NOTIFY BUILDING REPRESENTATIVE OF SPECIAL CIRCUMSTANCES IN <br />ADVANCE PRIOR TO WORK. <br />2. THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND <br />SURROUNDING AREA FREE FROM DUST AND DEBRIS. THE WORK SHALL BE IN <br />CONFORMANCE WITH THE AIR AND WATER POLLUTION CONTROL STANDARDS AND <br />REGULATIONS OF THE STATE DEPARTMENT OF HEALTH. <br />3. CONSTRUCTION DEBRIS AND WASTES SHALL BE DEPOSITED AT AN APPROPRIATE <br />SITE. THE CONTRACTOR SHALL INFORM THE BUILDING REPRESENTATIVE OF THE <br />LOCATION OF DISPOSAL SITES. <br />4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB <br />AFTER ITS COMPLETION. WHERE APPLICABLE, CLEANING SHALL INCLUDE, BUT <br />NOT BE LIMITED TO, THE EXTERIOR AND THE INTERIOR OF THE BUILDING, THE <br />PATH OF TRAVEL TO THE JOB SITE, PARKING LOTS, ELEVATORS, LOBBIES, AND <br />CORRIDOR CARPETS. <br />5. THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED <br />PER STATE AND LOCAL CODES. <br />6, IF TRENCHES OR EXCAVATIONS 5-0" OR MORE IN DEPTH ARE REQUIRED, OBTAIN <br />ISSUANCE OF A BUILDING OR GRADING PERMIT. <br />7. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING <br />WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE & <br />COUNTY REQUIREMENTS. <br />8. CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF SUPPLY AND RETURN <br />AIR GRILLES, DIFFUSERS & DUCTS TO KEEP DUST FROM ENTERING INTO BUILDING <br />AIR DISTRIBUTION SYSTEMS, <br />9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE <br />SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES. <br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE <br />BUILDING AND SITE WHILE JOB IS IN PROGRESS AND UNTIL THE JOB IS <br />COMPLETED. <br />DRAWING NOTES: <br />1. UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE DOCUMENTS <br />SHALL BE TO FACE OF CURB, FACE OF CONCRETE OR MASONRY, FACE OF FINISH <br />OR CENTERLINE of GRIDS. <br />2. ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, U.O.N. <br />3. DIMENSIONS SHOWN IN FIGURES TAKE PRECEDENCE OVER DIMENSIONS SCALED <br />FROM DRAWINGS. LARGE SCALE DRAWINGS AND DETAILS TAKE PRECEDENCE OVER <br />SMALLER SCALE DRAWINGS. <br />4. THE TERM "ALIGN", AS USED IN THESE DOCUMENTS, SHALL MEAN TO <br />ACCURATELY LOCATE FINISHES IN THE SAME PLANE, <br />5, "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS <br />THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, <br />U.O.N. <br />6. DETAILS ARE USUALLY KEYED AND NOTED "TYPICAL" ONLY ONCE, WHEN THEY <br />FIRST OCCUR AND ARE REPRESENTATIVE OF ALL SIMILAR CONDITIONS <br />THROUGHOUT, U.O.N. <br />7, COLUMN CENTERLINES (GRID LINES) ARE SHOWN FOR DIMENSIONING PURPOSES. <br />8. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF <br />THE WORK, THE DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK IN <br />THE SAME BUILDING. <br />INTERIOR / EXTERIOR NOTES: <br />1. WHERE ELECTRICAL, MECHANICAL AND/OR PLUMBING ITEMS, SUCH AS LIGHTS, <br />DUCTS, PIPING, DOWNSPOUTS, ETC, ARE TO PENETRATE ANY BUILDING FOOTINGS, <br />SLABS, FLOORS, STRUCTURAL FRAMING, WALL PARTITIONS, CEILINGS, ETC., IT IS <br />REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE <br />FURNISHED. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL ITEMS <br />WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION OF <br />STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY CONFLICT OR <br />DISCREPANCY WITHIN CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE <br />ARCHITECT'S ATTENTION FOR CLARIFICATION. <br />2. CONTRACTOR, ALONG WITH MECHANICAL CONTRACTOR, SHALL PROVIDE AND <br />LOCATE ACCESS DOORS/PANELS IN WALL & CEILING CONSTRUCTION AS REQUIRED <br />TO PROVIDE ACCESS TO MECHANICAL, FIRE SPRINKLER, PLUMBING & ELECTRICAL <br />WORK. CONTRACTOR SHALL SUBMIT A PLAN OF ALL PROPOSED ACCESS PANEL <br />LOCATIONS TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. <br />3. ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN <br />RATING. <br />4. WHERE OCCURS, CONTRACTOR SHALL PATCH ANY EXISTING WALLS AND/OR <br />CEILINGS AS NEEDED TO REFURBISH THE LEASE SPACE AND REPAIR ALL <br />DAMAGES CAUSED BY CONTRACTOR <br />5, INTERIOR WALLS AND CEILINGS SHALL BE INSTALLED IN ACCORDANCE TO STATE & <br />LOCAL CODES, INCLUDING REQUIREMENTS FOR FLAME SPREAD AND SMOKE <br />DENSITY RATINGS FOR FINISH MATERIALS. <br />6. WHEN USED, ALL NOISE BARRIER BATTS (SOUND INSULATION) AND INSULATION <br />BATTS SHALL BE NON-COMBUSTIBLE AND SHALL NOT CONTAIN OR UTILIZE <br />OZONE DEPLETING COMPOUNDS. <br />7. ALL NET CONSTRUCTION MATERIALS SHALL BE 100% ASBESTOS -FREE. <br />ARCHITECT <br />GSA PM <br />PBS, NORTHWEST/ARCTIC REGION <br />400 15TH ST SW <br />AUBURN, WA 98001 <br />ILDING D P T �E T; CITY OF EVERETT, WASHINGTON <br />ARCH ITECTURAL <br />(15 SHEETS) LL <br />LJ <br />Of <br />o <br />AO.1 <br />TITLE SHEET <br />Cf) <br />r) <br />ILD. O IE: 2018 <br />INTERNATIONAL BUILDING CODE <br />AO.2 <br />GENERAL NOTES <br />2018 <br />INTERNATIONAL EXISTING BUILDING CODE <br />Q <br />2018 <br />INTERNATIONAL MECHANICAL CODE <br />AO.3 <br />ACCESSIBILITY DETAILS <br />J <br />2018 <br />INTERNATIONAL FIRE CODE <br />2018 <br />WASHINGTON STATE ENERGY CODE <br />A1.1 <br />OCCUPANCY AND EGRESS PLAN <br />2018 <br />UNIFORM PLUMBING CODE <br />o <br />2020 <br />NFPA 70, NATIONAL ELECTRIC CODE <br />ADA <br />DEMOLITION FLOOR PLAN <br />2018 <br />WASHINGTON STATE-WIDE AMENDMENTS <br />Ld <br />2009 <br />ICC A117.1 - ANSI <br />AD.2 <br />DEMOLITION REFLECTED CEILING PLAN <br />t- <br />A2.1 <br />FLOOR PLAN <br />z <br />A3.1 <br />POWER AND SIGNAL & FURNITURE PLANLd <br />n <br />� <br />A3 1 a <br />SECURITY PLAN <br />OCCUPANCY CLA IFI ATiON- PER IBC CHAPTER 3 (SECTION 302) - B LU <br />A4.1 REFLECTED CEILING PLAN <br />� r � <br />PER IBC CHAPTER 7 - N/A <br />AL).1 <br />FINISH PLAN <br />Cn <br />A6.1 <br />ENLARGED RESTROOM PLAN & ELEVATIONS <br />TYPE OF CONSTRUCTION: <br />PER IBC CHAPTER 6 SECTION 602 - II-FR <br />( ) <br />< <br />A�.2 <br />INTERIOR ELEVATIONS �c SECTIONS <br />A7.1 <br />DOOR & HARDWARE SCHEDULE <br />0 <br />P I LERE : <br />NO <br />v� <br />A8.1 <br />DETAILS <br />Li <br />NUMBER OF STORIES: <br />4 <br />ASSESSOR'S PARCEL O.: <br />28051800305400 <br />ACOUSTIC <br />DESIGN REMEWSEE <br />U <br />cn <br />ATTACHED <br />of <br />w <br />PROJECT SCOPE: <br />THE SCOPE OF THIS PROJECT IS A 3RD FLOOR <br />0 <br />LLJ <br />SECOND GENERATION TENANT IMPROVEMENT OF <br />EXISTING SPACE WHERE SUITE 306 IS EXPANDING CD 00 <br />O� >- <br />INTO SUITE #310 FOR USE OF OFFICE. DEMOLITION TO CD <br />INCLUDE WALLS, CEILING, LIGHTING TING AND FINISHES. NEW � � <br />CONSTRUCTION TO INCLUDE PARTITION WALLS, DOORS, a_ <br />CEILING, LIGHTING AND FINISHES.PAPPRO' L <br />�, t= bCN <br />C)sAWilNaY � <br />u <br />T NANT OCCUPANCY: OFFICE (B) 3,933 USF B Y. Z_ <br />D __c� _° can <br />Cn <br />E5 <br />714is SET OF W 0 F_ <br />g * •I SHALL, <br />UJ <br />U N 1105 SITEF- W <br />'U TmjE . <br />CITY OF <br />REVIEV <br />PERM� UJ <br />,014PPROVED"OP co <br />PQJFPL10V,V10RKS, FIRE <br />LLJ <br />co CD <br />�- <br />w <br />a <br />m <br />ar <br />OEM", alumv <br />X <br />Ld <br />s < w <br />"he K ° of's per"M 0 M, not >- w <br />be Comm, a a . aldwzytov < <br />0 z 0 <br />the nw fitC) LLJ <br />applCoMe . 7h <br />issuem 1- a" ' , - CD cf) <br />LLJ 41 ., , i <br />dMa hW Im pmma 1 ft am coo, F4 F4 <br />owG Eu®� <br />_J CN o <br />Q C7 <br />CD <br />SUBMITTALS -DEFERRED Zr4 M _ _ <br />Z <br />DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT AND ENGINEERS OF RECORD WHO SHALL REVIEW AND PROVIDE NOTATION INDICATING v <br />DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE WITH THE BUILDING DESIGN, SUBMITTAL MATERIALS SHALL INCLUDE PLANS, -J <br />DETAILS AND CALCULATIONS PREPARED AND SIGNED BY A STATE REGISTERED ENGINEER. o `' Q <br />CONTRACTOR SHALL SUBMIT ARCHITECT AND ENGINEER REVIEWED SUBMITTAL MATERIALS TO THE BUILDING OFFICIAL FOR REVIEW AND PERMIT APPROVAL. W <br />DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED PRIOR TO OBTAINING THE BUILDING OFFICIAL'S APPROVAL OF THE SUBMITTAL. Ld = ILLJ <br />a_ <br />'> 0 0 fLLI <br />- <br />Q ���' LJ <br />nsv <br />LJ v <br />= W W C) Z < o <br />F- <br />o o� o 0 CD <br />c� <br />0 a n to 0 0 0 <br />cn c„ �i v1 M Cn <br />Q of6-5 cry Lo <br />> c- o(D00 <br />cv cv c14 cv cv o 0 0 � C) CD o <br />LLJ N c� v c�i c� cN cv cv <br />a_ <br />0 < N o r caa ED <br />� c�i cv <br />o o N c_i cNi ® oCf <br />0 <br />LLJ <br />DIANA TA, PROJECT MANAGER <br />THE GOVERNMENT RETAINS THE RIGHT TO REVIEW AND APPROVE MANY ASPECTS OF THE LESSOR'S DESIGN, INCLUDING WITHOUT LIMITATION, REVIEW OF THE <br />PA i PM: C.KANG <br />PH: (253) 326-0068 <br />LESSOR'S DESIGN AND CONSTRUCTION DRAWINGS, SHOP DRAWINGS, PRODUCT DATA, FINISH SAMPLES, AND COMPLETED BASED BUILDING AND Tl CONSTRUCTION. <br />� <br />diona.ta@gso.gov <br />SUCH REVIEW ,AND APPROVAL IS INTENDED TO IDENTIFY POTENTIAL DESIGN FLAWS, TO MINIMIZE COSTLY MISDIRECTION OF EFFORT, AND TO ASSIST THE LESSOR <br />v <br />DRAWN BY: J.STOKDIJK <br />IN ITS EFFORT TO MONITOR WHETHER SUCH DESIGN AND CONSTRUCTION COMPLY WITH APPLICABLE LAWS AND SATISFY ALL LEASE REQUIREMENTS. <br />� <br />w <br />JOB NO.: SEA20-6100-01 <br />a7 <br />