h.
<br />.,
<br />F
<br />�M , x e
<br />r
<br />A. DOCUMENTS', AS USED HEREIN, SHALL COMPRISE THE ENTIRE INTEGRATED SET OF ALL WRITTEN INSTRUMENTS
<br />RELATED TO THE PROJECT, INCLUSIVE OF, BUT NOT EXCLUSIVE TO, ALL CONTRACTS, SUBCONTRACTS, DRAWINGS,
<br />SKETCHES, MEMORANDA, ADDENDA, SPECIFICATIONS, MANUALS, POLICIES, RULES AND REGULATIONS, LANDLORD
<br />DESIGN CRITERIA, SUBMITTALS, SHOP DRAWINGS, PERMITS, APPROVALS, REGULATIONS AND CODES. 'PROJECT', AS USED
<br />HEREIN, SHALL REFER TO THE ENTIRE SCOPE OF PROVIDING A FINISHED FACILITY, READY AND USEABLE FOR ITS INTENDED
<br />PURPOSE. GC SHALL BE RESPONSIBLE TO VISIT THE SITE PRIOR TO SUBMISSION OF BID, ANY DISCREPANCIES FROM PLANS
<br />SHALL BE CONVEYED TO THE NEXTORE PROJECT MANAGER PRIOR TO BID SUBMISSION. SUBMISSION OF BID SHALL
<br />CONSTITUTE ACKNOWLEDGEMENT AND ACCEPTANCE OF EXISTING CONDITIONS.
<br />B. ALL MATERIALS AND/OR LABOR FOR THE PROJECT WHICH IS SHOWN ON THE DRAWINGS AND SPECIFICATIONS OR
<br />IS REASONABLY INFERABLE THEREIN AS BEING NECESSARY TO PRODUCE A FINISHED PROJECT, SHALL BE PROVIDED BY
<br />GENERAL CONTRACTOR, WHETHER OR NOT THE WORK IS EXPRESSLY COVERED IN THE DOCUMENTS. THIS APPLIES TO
<br />ALL WORK, WITH THE EXCEPTION OF THOSE ITEMS INDICATED N.I.C. ("NOT IN CONTRACT") OR BY OTHERS. THE DESIGN
<br />INTENT OF THE DRAWINGS SHALL ALWAYS BE THE GOAL.
<br />C. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COORDINATION BETWEEN SUBCONTRACTORS,
<br />SUPPLIERS, VENDORS OR ANY OTHER PARTIES SUPPLYING GOODS OR SERVICES TO THE PROJECT. NO EXTRA
<br />COMPENSATION WILL BE GIVEN TO ANY PARTY WHO HAS BID FROM AN INCOMPLETE SET OF DOCUMENTS OR WITH
<br />INSUFFICIENT FAMILIARITY WITH THE PROJECT OR THE SPECIFIC REQUIREMENTS THEREOF. IN THE EVENT OF
<br />INCONSISTENCIES OR DISCREPANCIES BETWEEN THE DOCUMENTS, CODES, CRITERIA OR REQUIREMENTS, THE MOST
<br />STRINGENT SHALL APPLY. THE GENERAL CONTRACTOR SHALL NOTIFY THE NEXTORE PROJECT MANAGER IMMEDIATELY
<br />OF SUCH DISCREPANCIES OR INCONSISTENCIES.
<br />D. IT IS THE RESPONSIBILITY OF THE G.C. TO VERIFY BOTH EXISTING SITE CONDITIONS AND DIMENSIONS WITHIN 24
<br />HOURS OF STARTING ANY PROJECT. THE G.C. SHALL NOTIFY THE CONSTRUCTION MANAGER IMMEDIATELY OF ANY
<br />DISCREPANCIES PRIOR TO INITIATING CONSTRUCTION:
<br />E. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A CURRENT SET OF CONSTRUCTION
<br />DRAWINGS ON SITE AT ALL TIMES DURING CONSTRUCTION. THE GENERAL CONTRACTOR SHALL INDICATE ON THESE
<br />PLANS ALL APPROVED CHANGES TO THE WORK. THIS SET OF DRAWINGS SHALL BE UPLOADED VIA PROJECT READY IN PDF
<br />FORMAT TO THE NEXTORE PROJECT MANAGER UPON COMPLETION OF THE PROJECT. THESE DRAWINGS SHALL BE
<br />MARKED UP TO REPRESENT A COMPLETE AND ACCURATE SET OF "AS -BUILT" DRAWINGS. ANY AND ALL CHANGES SHALL
<br />BE NOTED ON SAID PLANS, PROVIDE MARKED UP PLANS TO NEXTORE PROJECT MANAGER AT PUNCH.
<br />F. IF ANY ERRORS, DISCREPANCIES OR OMISSIONS APPEAR OR ARE EVIDENT ON ANY OF THE DOCUMENTS, THE
<br />GENERAL CONTRACTOR, SUBCONTRACTOR, VENDOR OR SUPPLIER SHALL IMMEDIATELY NOTIFY THE NEXTORE PROJECT
<br />MANAGER.
<br />G. NO MATERIAL SUBSTITUTIONS WILL BE ALLOWED UNLESS SUBMITTED IN WRITING AND APPROVED IN WRITING BY
<br />THE NEXTORE PROJECT MANAGER.
<br />H. THE GENERAL CONTRACTOR SHALL, ON OR BEFORE THE SOONER OF: WITHIN 10 WORKING DAYS OF CONTRACT
<br />AWARD OR THE START OF THE PROJECT, PROVIDE TO NEXTORE AND KEEP CURRENT, A LIST OF ALL SUBCONTRACTORS
<br />TO BE USED ON THE PROJECT. THE GENERAL CONTRACTOR SHALL ALSO PROVIDE A COPY OF THIS LIST TO THE NEXTORE
<br />PROJECT MANAGER AT CONSTRUCTION COMPLETION, AND A COPY IS TO BE INCLUDED IN THE CLOSEOUT PACKAGE
<br />FROM THE GENERAL CONTRACTOR.
<br />L. THE GENERAL CONTRACTOR SHALL INSPECT, VERIFY AND INVENTORY ALL SHIPMENTS OF NEXTORE SUPPLIED
<br />MATERIALS, INCLUDING THOSE TO AND FROM ANY OFF SITE WAREHOUSE FACILITIES. THIS INCLUDES VERIFYING PACKING
<br />LISTS AGAINST ORDER FORMS AND BILLS OF LADING AND NOTING N G AND REPORTING
<br />E ORTING ANY DAMAGES OR SHORTAGES TO
<br />THE NEXTORE PROJECT MANAGER. IF NOT DONE WITHIN 24 HOURS OF DELIVERY, THE GENERAL CONTRACTOR SHALL
<br />BEAR ANY AND ALL ASSOCIATED COSTS, INCLUDING EXPEDITED FREIGHT CHARGES, TO MEET THE CONSTRUCTION
<br />SCHEDULE. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR FILING DAMAGE REPORTS AND MAINTAINING PACKING
<br />MATERIALS FOR RETURN SHIPMENT OF DAMAGED ITEMS,
<br />J. THE GENERAL CONTRACTOR SHALL KEEP ALL HANDBOOKS, MANUALS, WARRANTY DOCUMENTS AND
<br />MISCELLANEOUS PAPERWORK, INCLUDING ALL PACKING SLIPS AND BILLS OF LADING IN A MARKED BINDER. THIS BINDER
<br />IS TO BE TURNED OVER TO THE STORE GENERAL MANAGER AT PROJECT COMPLETION. COPIES OF THOSE ITEMS AND
<br />DOCUMENTS REQUIRED FOR INCLUSION IN THE CLOSEOUT PACKAGE SHALL BE MADE BY THE GENERAL CONTRACTOR AS
<br />NEEDED FOR THIS SUBMISSION.
<br />K. THE GENERAL CONTRACTOR SHALL DELIVER TO THE NEXTORE PROJECT MANAGER A COPY OF THE CERTIFICATE OF
<br />OCCUPANCY (C OF 0), LIEN WAIVERS, WARRANTIES, GUARANTEES AND EQUIPMENT OPERATION MANUALS. THE
<br />ORIGINAL CERTIFICATE OF OCCUPANCY IS TO BE LEFT WITH THE STORE GENERAL MANAGER.
<br />L. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEAN UP AND DISPOSAL OF ALL TRASH AND DEBRIS
<br />GENERATED BY ALL TRADES. GC. TO REMOVE/DISPOSE OF ALL BOXES/CRATES/TRASH OF TENANT SUPPLIED AND
<br />INSTALLED ITEMS; INCL. DISPLAY FIXTURES & HARDWARE. DAILY CLEAN REQUIRED.
<br />M. THESE CONSTRUCTION DOCUMENTS ARE NOT TO BE SCALED. ALL DIMENSIONS ARE TO FINISH FACE OF WALL,
<br />UNLESS OTHERWISE NOTED
<br />N. THESE DRAWINGS ARE NOT TO BE ALTERED IN ANY WAY WITHOUT THE WRITTEN AUTHORIZATION FROM NEXTORE
<br />OR NEXTORE'S ARCHITECT.
<br />0. THE GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AT ALL TIMES DURING STORE OPERATION / CONSTRUCTION.
<br />P. THE GENERAL CONTRACTOR SHALL COORDINATE CONSTRUCTION TIMES AND NOISE REQUIREMENTS WITH
<br />LANDLORD PRIOR TO CONSTRUCTION START, NO EXTRA COSTS WILL BE ALLOWED TO ACCOMMODATE ANY
<br />RESTRICTIONS OR LIMITATIONS.
<br />Q. UPON COMPLETION OF CONSTRUCTION, IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO
<br />CLEAN ALL SURFACES /FIXTURES PER MANUFACTURER'S INSTRUCTIONS AND TO EMPLOY THE SERVICES OF A
<br />PROFESSIONAL CLEANING COMPANY TO ASSURE DELIVERY TO THE TENANT OF AN ABSOLUTELY CLEAN STORE. (2)
<br />CLEANINGS REQUIRED. (1) PRIOR TO PUNCH & (1) AT TURNOVER. THE FINAL CLEANING IS TO BE PERFORMED NO MORE
<br />THAN ONE DAY PRIOR TO THE TURN OVER. IF AN UNTIDY STORE IS TURNED OVER, NEXTORE RESERVES THE RIGHT,
<br />WITHOUT NOTICE TO THE GENERAL CONTRACTOR, TO EMPLOY PROFESSIONAL CLEANING SERVICES AND DEDUCT THE
<br />COST PLUS 15% FROM THE BALANCE OF THE GENERAL CONTRACTOR.
<br />R. THE GENERAL CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR ALL EQUIPMENT, FINISHES,
<br />MERCHANDISE, CARPET, ETC., INCLUDING THE WORK OF OTHERS, THROUGHOUT THE DURATION OF THE PROJECT.
<br />S. THE GENERAL CONTRACTOR SHALL COORDINATE ALL ACTIVITIES WITH THE LANDLORD PRIOR TO THE START OF
<br />CONSTRUCTION, AND COORDINATE WITH THE LANDLORD, ALL INTERRUPTION OF SERVICES. ANY SHUT DOWNS SHALL
<br />BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR
<br />T. THE GENERAL CONTRACTOR SHALL INSTALL A LANDLORD AND CODE COMPLIANT TEMPORARY BARRICADE AS
<br />REQUIRED BY THE LANDLORD OR NEXTORE PROJECT MANAGER, UNLESS THE PLANS SPECIFICALLY CALL OUT FOR THIS
<br />WORK TO BE BY OTHERS.
<br />U. GENERAL CONTRACTOR SHALL INSTALL A TEMPORARY ENTRANCE WITH DOORS, FRAMES AND LOCKS, UNLESS THE
<br />PLANS SPECIFICALLY CALL OUT FOR THIS WORK TO BE BY OTHERS.
<br />V. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE CODES AND ORDINANCES, THE LANDLORD'S TENANT
<br />DESIGN CRITERIA, THE LANDLORD'S CONSTRUCTION RULES AND REGULATIONS, NEXTORE STANDARD SPECIFICATIONS,
<br />NEXTORE'S STANDARD CONSTRUCTION CRITERIA AND ACCEPTED BEST CONSTRUCTION PRACTICES. THE GENERAL
<br />CONTRACTOR SHALL BE RESPONSIBLE TO FILE ANY NEEDED"NOTICE OF COMMENCEMENT" OR OTHER FILINGS RELATED
<br />TO THE PROJECT IN THE APPROPRIATE OFFICES AND SHALL BE RESPONSIBLE TO POST SUCH NOTICES AT THE JOB SITE,
<br />W. ALL WOOD CONSTRUCTION, INCLUDING BLOCKING, SHALL BE FIRE RESISTANT TREATED(FRT). ALL NEW FRAMING
<br />AT THE STOREFRONT AND / OR ABOVE THE CEILING SHALL BE NON-COMBUSTIBLE.
<br />X. THE GENERAL CONTRACTOR SHALL, PRIOR TO BEGINNING ANY WORK, COORDINATE WITH THE LANDLORD OR ANY
<br />AUTHORITY HAVING JURISDICTION, AND BEAR THE COSTS FOR, ALL EXPLORATIONS / X-RAYS REQUIRED FOR
<br />CUTTING/CORING OF THE SLAB OR EXCAVATING.
<br />Y. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL THEIR WORK AND THE WORK OF THEIR
<br />SUBCONTRACTORS WITH THE STRUCTURE AND SHELL BUILDING ELEMENTS. THE GENERAL CONTRACTOR SHALL
<br />IMMEDIATELY NOTIFY THE NEXTORE PROJECT MANAGER OF ANY DISCREPANCIES BETWEEN THESE DRAWINGS AND THE
<br />BUILDING SHELL.
<br />Z. THE GENERAL CONTRACTOR SHALL PROVIDE ALL FIRE EXTINGUISHERS, CONCEALED BLOCKING AND SIGNAGE FOR
<br />SAME AS REQUIRED. QUANTITIES, SIZES AND LOCATIONS SHOWN IN THE DRAWINGS ARE ONLY SUGGESTED QUANTITIES,
<br />SIZES AND LOCATIONS, THE MOST STRINGENT REQUIREMENT OF ANY BODY HAVING JURISDICTION SHALL PREVAIL.
<br />AA. THE GENERAL CONTRACTOR SHALL DESIGN, INSTALL, LOCATE, RELOCATE, RECONFIGURE THE FIRE SPRINKLER AND
<br />FIRE ALARM SYSTEMS AS REQUIRED BY THE INTENT OF THESE CONSTRUCTION DOCUMENTS OR ANY CODE OR BODY
<br />HAVING JURISDICTION OVER THE WORK. ALL FIRE SPRINKLER AND FIRE ALARM SYSTEM WORK SHALL BE 'DESIGN BUILD' BY
<br />THE GENERAL CONTRACTOR, UNLESS CALLED OUT TO BE PERFORMED SPECIFICALLY BY OTHERS IN THE DOCUMENTS (SEE
<br />FIRE SPRINKLER SYSTEM / FIRE ALARM SYSTEM NOTES. GC TO COORDINATE WITH LANDLORD REQUIRED VENDOR.
<br />AB. THE GENERAL CONTRACTOR SHALL, WITHOUT EXCEPTION, PROVIDE AND INSTALL ANY AND ALL DUST
<br />PROTECTION, REQUIRED DURING CONSTRUCTION.
<br />AC. GENERAL CONTRACTOR TO PROVIDE ALL FLOOR PREPARATION AS NEEDED TO ASSURE COMPLIANCE WITH
<br />FINISHED FLOORING MANUFACTURER SPECIFICATIONS.
<br />AD. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL CEILING WORK WITH THE
<br />MEP DRAWINGS.
<br />AE. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL LIGHTING WITH THE
<br />ELECTRICAL DRAWINGS / REFLECTED CEILING PLAN.
<br />AF. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL LIGHT FIXTURES
<br />SUPPORTS; INCLUDING ANY AND ALL SEISMIC REQUIREMENTS.
<br />AG, THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING REQUIRED FIRE RATINGS AND FIRE
<br />PROOFING IN ALL INSTANCES.
<br />AH. ALL PENETRATIONS OF DEMISING WALLS, ROOF AND FLOOR SHALL BE FIRE SAFE / PROOF PER CODES / LANDLORD
<br />REQUIREMENTS. THE MOST STRINGENT REQUIREMENT SHALL PREVAIL.
<br />Al. THE GENERAL CONTRACTOR SHALL RECEIVE, UNLOAD, AND PROVIDE SAFE STORAGE OF ALL NEXTORE / NEXTORE
<br />SUPPLIED AND / OR INSTALLED MATERIAL. TRASH REMOVAL OF ALL BOXES / CRATES CONTAINING NEXTORE / NEXTORE
<br />SUPPLIED AND / OR INSTALLED MATERIAL, INCLUDING BUT NOT LIMITED TO FLOORING, MILLWORK, LIGHTING,
<br />HARDWARE, ACCESSORIES, EQUIPMENT, ETC. SHALL BE BY THE GENERAL CONTRACTOR.
<br />AJ. NOTICE OF INCIDENT: THE GENERAL CONTRACTOR SHALL, VIA ELECTRONIC MEDIUM AND NEXTORE STANDARD
<br />NOTIFICATION AND REPORTING FORMS, IMMEDIATELY NOTIFY THE NEXTORE PROJECT MANAGER OF ANY INCIDENT
<br />INVOLVING THE PROJECT WHICH RESULTS IN CONTACT WITH ANY FEDERAL, STATE OR LOCAL GOVERNMENT AGENCY OR
<br />AS CALLED OUT IN NEXTORE'S OR THE LANDLORDS RULES, REGULATIONS OR POLICIES.
<br />AK. WEEKLY PROGRESS PHOTOS, DAILY REPORTS, SAFETY INSPECTIONS, SCHEDULE UPDATES, CHANGE ORDER LOGS, RFI
<br />LOGS, AND TOOL BOX TOPICS SHALL BE SUBMITTED TO THE NEXTORE PROJECT MANAGER VIA PROJECT READY AS
<br />REQUIRED IN THE DOCUMENTS OR DIRECTED BY THE NEXTORE PROJECT MANAGER.
<br />AL. FOR THOSE PROJECTS THAT ARE "OPEN REMODELS"; STORES WILL REMAIN OPEN DURING REGULAR BUSINESS
<br />HOURS WHILE CONSTRUCTION IS IN PROGRESS. ALL DISTURBANCES TO SURROUNDING BUSINESSES AND AREAS MUST BE
<br />KEPT TO A MINIMUM. WORK DURING AN OPEN REMODEL IS TYPICALLY PERFORMED "AFTER NORMAL OPERATING HOURS."
<br />' GC MUST COORDINATE WITH NEXTORE PROJECT MANAGER AND OR STORE OPERATIONS MANAGER PRIOR TO
<br />CONSTRUCTION START. THERE SHALL BE NO UP -CHARGE SUBMITTED, ALLOWED, OR CONSIDERED FOR ANY SUCH AFTER
<br />HOURS WORK.
<br />SAFETY:
<br />SAFETY OF ALL EMPLOYEES, ASSOCIATES AND CUSTOMERS SHALL BE THE NUMBER ONE PRIORITY FOR ALL CONTRACTORS
<br />ON ANY NEXTORE PROJECT. OSHA REQUIREMENTS SHALL BE INCORPORATED INTO THE SCOPE OF WORK EVEN THOUGH
<br />THEY MAY NOT BE LISTED SEPARATELY. CONTRACTOR SHALL MAINTAIN A COPY OF THEIR SITE SPECIFIC SAFETY PLAN ON
<br />SITE AT ALL TIMES
<br />1-PVC30-0001-REV00
<br />Ae
<br />S
<br />x I
<br />1. BUILDING PERMIT AND CERTIFICATE OF OCCUPANCY:
<br />A. THE GC SHALL CONTACT THE NEXTORE P.M. OR THE PERMIT EXPEDITOR TO SECURE THE PERMIT. PERMIT SHALL
<br />BE MOUNTED IN A VISIBLE, LOCATION AT THE SITE. PERMITS SHALL BE PAID FOR BY THE GC AND SUBMITTED TO
<br />TENANT AS A NET COST.
<br />B. THE GC SHALL ARRANGE FOR ALL REQUIRED INSPECTIONS.
<br />C. THE GC SHALL DETERMINE IF THE INSPECTORS WILL BE CHECKING LAB / LENS PROCESSING ROOM EQUIPMENT
<br />FOR UL OR ETL LABELS AND NOTIFY THE CONSTRUCTION MANAGEMENT TEAM NO LATER THAN 4 WEEKS
<br />BEFORE "PUNCH".
<br />D. IF REQUIRED, A "TEMPORARY C OF 0" OR BUILDING DEPARTMENT APPROVAL SHALL BE RECEIVED TO SET
<br />DOWN EQUIPMENT.
<br />2. DIMENSIONS:
<br />THE WORD 'HOLD' REFERS TO A CRITICAL DIMENSION AND MUST BE ADHERED TO. IF THESE DIMENSIONS CAN NOT
<br />BE MET, SUBMIT IN WRITING & CALL NEXTORE P.M. FOR DIRECTION.
<br />3. ON -SITE COMMUNICATION:
<br />A. THE GC SHALL CONTACT THE NEXTORE P.M. TO RESOLVE ALL FIELD ISSUES.
<br />B. GC TO HAVE CELL PHONE WITH VOICEMAIL CAPABILITIES.
<br />C. GC TO HAVE LAPTOP ON SITE WITH WIFI CAPABILITIES.
<br />D. GC TO HAVE PRINTER ON SITE.
<br />4. CHANGE ORDERS:
<br />NO ADDITIONAL COSTS OR DESIGN CHANGES WILL BE ACCEPTED WITHOUT THE WRITTEN APPROVAL OF THE
<br />NEXTORE P.M. AND THE EXECUTION OF THE NEXTORE CHANGE ORDER PROCEDURE, PRIOR TO THE COMMENCEMENT
<br />OF SUCH WORK, CHANGE ORDER WORK COMPLETED WITHOUT SIGNED APPROVAL TO DO SAME, IS DONE SO AT THE
<br />GC'S RISK.
<br />5. SUBCONTRACTOR COORDINATION:
<br />THE GC MUST BE PRESENT AT ALL TIMES FOR THE DURATION OF CONSTRUCTION. THE GC SHALL GIVE
<br />SUBCONTRACTORS APPROPRIATE NOTICE BEFORE REQUIRING THEM ON SITE, COORDINATE INSTALLATION DATES,
<br />AND COMMUNICATE SIT
<br />E E SPECIFIC DETAILS. THE GC SHALL COORDINATE THE INSTALLATION SCHEDULE AND
<br />DIVISION OF WORK WITH THE NEXTORE P.M. SUBCONTRACTORS SHOULD CONTACT THE GC FOR SCHEDULE
<br />CLARIFICATIONS.
<br />MILLWORK / CASEWORK: GC SHALL COORDINATE CRITICAL DIMENSIONS PRIOR TO WALL CONSTRUCTION AND HAVE
<br />THE AREA READY PRIOR TO FIXTURE DELIVERY. READY SHALL BE DEFINED AS FLOORING DOWN THRU-OUT THE RETAIL
<br />AND OPTOMETRIC DOCTOR D E (O ) RECEPTION, LIGHTING SOFFITS BUILT OUT; DRYWALLED, FINISHED, PAINTED AND
<br />LIGHTING FIXTURES INSTALLED, ALL WALLS IN THE RETAIL AND OD RECEPTION MUST BE FINISHED AND PAINTED, ALL
<br />ELECTRICAL AND MECHANICAL ROUGH -OUTS MUST BE COMPLETED, STORE MUST BE SECURED FROM THE OUTSIDE.
<br />ONCE THE PRE -CONSTRUCTION MILLWORK DROP / INSTALL DATE HAS BEEN ESTABLISHED, ANY CHANGES TO THE
<br />ESTABLISHED DATE MUST BE COMMUNICATED AT LEAST 7 DAYS PRIOR.
<br />6. DATA-POS / PHONES:
<br />A. NEW T.I. & RELO STORES: BACKBOARD TO BE INSTALLED WITHIN 7 CALENDAR DAYS OF THE CONSTRUCTION
<br />START DATE. ACCESS TO BACKBOARD SHALL BE AFFORDED TO ALL TENANT VENDORS. TELEPHONE, ELECTRIC
<br />AND DATA CABLING INSTALLED ONE WEEK BEFORE "P
<br />UNCH" PUNCH" FOR HARDWARE INSTALLATION AND TESTING:
<br />CONTACT NEXTORE P.M. IF NEEDED.
<br />B. REMODEL STORES: GC TO COORDINATE ALL TEMPORARY AND PERMANENT DATA AND PHONE CABLING
<br />DURING THE OPEN REMODEL. KEEPING STORE POS AND PHONE SYSTEMS ON LINE AND ACTIVATED AT ALL
<br />TIMES. COORDINATE WORK WITH TENANT LOW VOLTAGE VENDOR.
<br />7. ELECTRICAL AND LIGHTING DELIVERIES
<br />GC SHALL BE RESPONSIBLE FOR THE COORDINATION OF DELIVERIES, FOR THE OFF-LOADING OF SAME, AND TO
<br />VERIFY / REPORT ANY DAMAGE AND FOR THE SAFE STORAGE OF ALL MATERIALS RECEIVED. THE GC SHALL VERIFY THE
<br />VOLTAGE AND COMPATIBILITY OF ALL EQUIPMENT, FIXTURES AND MILLWORK PRIOR TO CONNECTION.
<br />8. METER INSTALLATION (WATER / ELECTRIC / GAS):
<br />UTILITY ACCOUNT TRANSFER /SETUP (FOR CORPORATE NEW AND RELOCATION STORES ONLY):
<br />GC SHALL CONTACT THE NEXTORE RETAIL STORE
<br />A S O E MAINTENANCE HOTLINE 765- 500 513 UPON ARRIVAL AT THE ( ) 3 U 0 SITE.
<br />GC WILL NOT BE RESPONSIBLE FOR ANY UTILITYT COSTS DURING CONSTRUCTION. GC TO CONTACT NEXTORE TO
<br />CONVERT METERS TO NEXTORE NAME IMMEDIATELY UPON CONSTRUCTION START UP. GC TO PROVIDE THE
<br />FOLLOWING INFORMATION WHEN CALLING:
<br />A. STORE ADDRESS AND SPACE #
<br />B. UTILITY COMPANY (S)'NAME AND PHONE # (I.E., GAS, ELECTRIC, WATER AND POSSIBLY SEWER)
<br />C. METER AND SOCKET # (IF USED)
<br />D. EXPECTED "PUNCH" DATE (TIMING FOR NEW INSTALLATION OR UTILITY ACCOUNT TRANSFER WILL BE EXECUTED
<br />ON/OR BEFORE THE "PUNCH" DATE).
<br />9. TURNOVER PROCEDURE:
<br />A. THE GC SHALL CALL THE THE NEXTORE P.M. TO CONFIRM THE TURNOVER DATE NO LATER THAN 10 WORKING
<br />DAYS BEFORE TURNOVER.
<br />B. ALL CONSTRUCTION ITEMS, INCLUDING ITEMS ON THE INSTALLATION SCHEDULE ARE TO BE COMPLETED
<br />BEFORE TURNOVER DAY.
<br />C. THE GC AND NEXTORE P.M.O CONDU
<br />CT UCT THE PUNCH WALKTHROUGH, NOTING ALL DEFICIENCIES AND TIMING
<br />FOR RESOLUTION.
<br />D. A "SUBSTANTIAL COMPLETION" DOCUMENT WILL BE DISTRIBUTED TO THE GC. THE GC SHALL REMAIN ON SITE
<br />UNTIL ALL "PUNCH LIST" ITEMS ARE COMPLETE AND THE NEXTORE PM HAS APPROVED ITEMS CONFIRMING
<br />COMPLETION OF THE "PUNCH LIST" BY GC
<br />E. A COPY OF THE "CONFIRMED COMPLETION OF PUNCH LIST" WILL BE GIVEN TO THE NEXTORE P.M. BY THE GC.
<br />10, SETDOWN FOR NEW CORPORATE STORES:
<br />NEXTORE'S NEW STORE TEAM WILL DELIVER ALL REMAINING OWNER FURNISHED ITEMS TO THE STORE ON THE
<br />EVENING OF "TURNOVER" DAY. THE GC SHALL BE ON SITE ON THE DAY AFTER "TURNOVER", WITH ONE (1) PLUMBER
<br />AND ONE (1) ELECTRICIAN TO ASSIST THE SETDOWN TEAM TO RESOLVE ANY ISSUES. THE GC SHALL SUPPLY
<br />DUMPSTER FOR REMOVAL OF SETDOWN DEBRIS.
<br />11. SOUND SYSTEM:
<br />A. THE GC SHALL BE RESPONSIBLE TO CONTACT NEXTORE PROJECT MANAGER 4 WEE S PRIOR TO THE
<br />SCHEDULED DATE TO ARRANGE FOR INSTALLATION.
<br />B. REMODELS AND RELOCATIONS: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL,
<br />STORAGE AND REINSTALLATION OF SYSTEM (INCLUDING CD PLAYERS AND SPEAKERS) AT NEXTORE STORES
<br />DURING DURATION OF CONSTRUCTION.
<br />12. SECURITY ALARM TRANSFER/MODIFICATION
<br />A. ALARM TRANSFER/MODIFICATION GC SHALL CONTACT THE SECURITY VENDOR DURING ANY POINT IN
<br />CONSTRUCTION THE GC DETERMINES THEY WILL NEED TO DISABLE OR RELOCATE ANY ALARM SYSTEM
<br />COMPONENTS. GC SHALL AWAIT INSTRUCTIONS FROM THE "NEXTORE SECURITY LIAISON" BEFORE TAKING ANY
<br />ACTION ON THE SECURITY SYSTEM.
<br />B. CAMERAS - GC SHALL CONTACT THE "NEXTORE LOSS PREVENTION MANAGER" TO COORDINATE THE
<br />REINSTALLATION OF SECURITY CAMERAS ON REMODEL OR RELOCATION STORES THAT ALREADY HAVE
<br />CAMERAS IN PLACE AND ARE BEING DISTURBED DURING CONSTRUCTION.
<br />13. AIR BALANCE REPORTS:
<br />G.C. RESPONSIBLE TO OBTAIN CERTIFIED AIR BALANCING REPORT FROM A VENDOR INDEPENDENT FROM THE HVAC
<br />CONTRACTOR.
<br />2-PVC30-GO01-REV00
<br />3-PVC30-0001-REV00
<br />NAME PEARLE VISION
<br />STREET ADDRESS 910 SE. EVERETT MALL WAY, SUITE 103/104
<br />CITY, STATE, ZIP EVERETT, WA 98208
<br />4-PVC30-G001-REV00
<br />DEPARTMENT
<br />CITY OF EVERETT
<br />PERMIT SERVICES
<br />STREET ADDRESS
<br />3200 CEDAR STREET, 2ND FLOOR
<br />CITY, STATE, ZIP
<br />EVERETT, WA 98201
<br />PHONE
<br />425-257-8810
<br />5-PVC30-0001-REV00
<br />LANDLORD
<br />RAND'S 910 CENTER, LLC
<br />ASSOCIATE BROKER
<br />BLAKE SPRINGER - TRYBUS
<br />STREET ADDRESS
<br />15015 MAIN STREET, SUITE 203
<br />CITY, STATE, ZIP
<br />BELLEVUE, WA 98007
<br />PHONE
<br />425-746-6066
<br />EMAIL
<br />BLAKE@ PMFINVESTMENTS.COM
<br />6-PVC30-GO01-REV00
<br />STORE CONTACT PEARLE VISION
<br />STREET ADDRESS 910 SE. EVERETT MALL WAY - SUITE 103/104
<br />CITY, STATE, ZIP EVERETT, WA 98208
<br />PHONE Tan
<br />7-PVC30-GO01-REV00
<br />TEST, n g 6 n Drawings for:
<br />SM
<br />THESE DOCUM
<br />ENTS HAVE NOT SEEN
<br />APPROVED FOR THE ISSUANCE OF PEARLE OVI-SION
<br />PUBLIC WORKS, MECHANICAL, FIRE
<br />SUPPRESSION, ELECTRICAL OR Subsidiary of the L u x o t t i C a Group
<br />ft,j,m1aINq PFIRMITS.
<br />Additional Permits Are Required
<br />4000 Luxottica Place Mason, Ohio 45040
<br />' '
<br />For This Project TO Include:
<br />CITY OF EVERETT
<br />-
<br />sprinkler 910 SE EVERETT MALL WAY
<br />�j Plumbing Alarm
<br />REVIEWEDE PERMIT
<br />[3 MechanicalICU
<br />dire Ala
<br />Electrical
<br />EVERETT, WA 2
<br />98 08
<br />.L s .
<br />,
<br />�.
<br />CONSTRUCTION TYPE:
<br />2B
<br />EGRESS WIDTH PER OCCUPANT: 0.2 INCHES PER PERSON
<br />EXISTING OCCUPANCY:
<br />M (MERCANTILE)
<br />1.) 1005.3.2 EGRESS COMPONENTS SPRINKLERED
<br />0.2 INCHES PER OCCUPANT x 32 OCCUPANTS = 6.4 INCHES (REQUIRED)
<br />PROPOSED OCCUPANCY:
<br />M (MERCANTILE) & B (BUSINESS) [2417 SQ. FT.]
<br />2.) ACTUAL WIDTH PROVIDED:
<br />BUILDING:
<br />2018 WASHINGTON STATE BUILDING CODE
<br />THROUGH ENTRY (1) PAIR T-0" DOORS = 68" CLEAR
<br />THROUGH REAR DOOR (1)T-0" DOOR = 34" CLEAR
<br />MECHANICAL`
<br />2018 WASHINGTON STATE MECHANICAL CODE
<br />TABLE 1006.3.2 MINIMUM NUMBER OF EXITS:1-500 Occupants = 2 EXITS.
<br />FIRE:
<br />2018 WASHINGTON STATE FIRE CODE
<br />TABLE 1017.2 EXIT ACCESS TRAVEL DISTANCE:
<br />PLUMBING:
<br />2018 UNIFORM PLUMBING CODE
<br />(M) 250 feet sprinklered (B) 300 feet sprinklered
<br />ELECTRICAL
<br />2020 NATIONAL ELECTRICAL CODE
<br />1018.3 AISLE SPACING 44" min. (unless under 50 occs than 36" min.)
<br />FROM SECTION 1020.2
<br />ENERGY:
<br />2018 WASHINGTON STATE ENERGY CODE -
<br />COMMFROAL PROVISIONS
<br />1020.4 DEAD ENDS: no dead ends in corridors more than 20 feet
<br />EXCEPTIONS: where the building is equipped through -out with automatic
<br />ACCESSIBILITY CODE:
<br />2009 ICC ANSI A117.1
<br />sprinkler system the length of the dead-end corridors shall not exceed 50 feet.
<br />ADDITIONAL CODES
<br />-
<br />1024.2 EXIT PASSAGEWAY WIDTH:
<br />44" Min. for occupant load of 50 or more.
<br />SPRINKLERED: - YES
<br />36" Min. for occupant load of less than 50
<br />FIRE ALARM: - YES NFPA
<br />72
<br />FIRE EXTINGUISHERS: N PA I F
<br />10
<br />PLUMBING FIXTURES: 32 OCCUPANTS TOTAL (25 MERCANTILE / 7 BUSINESS)
<br />(16 OCCS MEN / 16`OCCS WOMEN) `
<br />OCCUPANT LOAD: TABLE
<br />1004.5 GROSS LEASE AREA 2417SQ. FT.
<br />WATER CLOSETS REQUIRED: I
<br />RETAIL STORE
<br />AREA OCCUPANCY
<br />(MERCANTILE): 1 PER 100 OCCUPANTS
<br />(BUSINESS): 1 PER 50 (MALE)
<br />RETAIL SALES AREA
<br />1505 SQ, FT. SQ. FT / 60 PERSON = 25.08
<br />AND 1 PER 15 (FEMALE)
<br />UNISEX RESTROOM
<br />62 SQ. FT. SQ. FT / 150 PERSON = 00.41
<br />PROVIDED: 1
<br />B.O.H.
<br />207 SQ. FT. SQ. FT / 150 PERSON = 01.38
<br />OFFICE
<br />53 SQ. FT. SQ. FT / 150 PERSON = 00.35
<br />LAVATORIES REQUIRED: 1
<br />ELECTRICAL ROOMS
<br />183 SQ. FT. SQ. FT / 150 PERSON = 00.55
<br />(MERCANTILE):1 PER200 OCCUPANTS
<br />1910 TOTAL SQ. FT. TOTAL OCCUPANT LOAD: 27.77
<br />(BUSINESS): 1 PER 75 (MALE) AND1
<br />PER 50 (FEMALE)
<br />PROVIDED: 1
<br />OPTOMETRY
<br />AREA OCCUPANCY
<br />CONTACT LENS
<br />148 SQ. FT. SQ. FT / 150 PERSON = 00.99
<br />DRINKING FOUNTAIN REQUIRED: 1
<br />PRETEST
<br />90 SQ. FT. SQ. FT / 150 PERSON = 00.60
<br />(MERCANTILE): 1 PER 250
<br />LARGE EXAM
<br />146 SQ. FT. SQ. FT / 150 PERSON = 00.97
<br />(BUSINESS):1 PER 150
<br />SMALL EXAM
<br />123 SQ. FT. SQ. FT / 150 PERSON = 00.82
<br />PROVIDED: 1
<br />507 TOTAL SQ. FT. TOTAL OCCUPANT LOAD: 3.38
<br />SERVICE SINK REQUIRED: 1 '
<br />(MERCANTILE)1 REQUIRED
<br />2417 TOTAL SQ. FT. TOTAL OCCUPANT LOAD: 32
<br />(BUSINESS): 1 REQUIRED
<br />PROVIDED: 1
<br />422.2 SEPARATE FACILITIES, EXCEPTION:
<br />3. IN BUSINESS AND MERCANTILE OCCUPANCIES WITH A TOTAL
<br />OCCUPANT LOAD OF 50 OR LESS INCLUDING CUSTOMERS AND
<br />EMPLOYEES, ONE TOILET FACILITY, DESIGNED FOR USE BY NO MORE
<br />THAN ONE PERSON AT A TIME, SHALL BE PERMITTED FOR USE BY
<br />BOTH SEXES.
<br />8-PVC30-0001-REV00
<br />9-PVC30-0001-REV00
<br />tz�ck 1*90; "
<br />e {irat'sc t�hnSt
<br />Traclef.Jaes
<br />r [qws JaWrs i rIym¢Gc Hol Tub"e == a;an I, A,rim
<br />El
<br />A ,pket terffi
<br />E,e,E�It
<br />F
<br />PEARLE VISION
<br />EVERETT, WA
<br />NORTH
<br />11-PVC30-GO01-REV00
<br />SHEET
<br />TITLE
<br />ACTIVE
<br />REVISION #
<br />ARCHITECTURAL & STRUCTURAL
<br />G001
<br />GENERAL INFORMATION / COVER SHEET
<br />-
<br />G002
<br />RESPONSIBILITY SCHEDULE & TYPICAL INFO
<br />-
<br />G003
<br />SPECIFICATIONS 1 OF 4
<br />-
<br />G004
<br />SPECIFICATIONS 2 OF 4
<br />-
<br />G005
<br />SPECIFICATIONS 3 OF 4
<br />-
<br />G006
<br />SPECIFICATIONS 4 OF 4
<br />-
<br />G007a
<br />DOOR & HARDWARE SCHEDULE
<br />-
<br />G007b
<br />DOOR DETAILS
<br />-
<br />G008
<br />NOT USED
<br />-
<br />G009
<br />SCHEDULES
<br />-
<br />G010
<br />LIFE SAFETY PLAN
<br />-
<br />AD100
<br />DEMOLITION PLAN
<br />-
<br />A100
<br />FIXTURE FLOOR PLAN
<br />-
<br />A101
<br />CONSTRUCTION FLOOR PLAN
<br />-
<br />A102
<br />REFLECTED CEILING PLAN
<br />-
<br />A103
<br />FINISH PLAN
<br />-
<br />A200
<br />INTERIOR ELEVATIONS
<br />-
<br />A201
<br />INTERIOR ELEVATIONS
<br />-
<br />A202
<br />NOT USED
<br />-
<br />A203
<br />TOILET ROOM PLAN, ELEVATIONS & DETAILS
<br />-
<br />A300
<br />STOREFRONT PLAN, ELEVATIONS & SECTION
<br />-
<br />A400
<br />SECTIONS & DETAILS
<br />-
<br />A401a
<br />SECTIONS & DETAILS
<br />-
<br />A401b
<br />SECTIONS & DETAILS
<br />-
<br />A402
<br />SECTIONS & DETAILS
<br />-
<br />A403
<br />CEILING DETAILS
<br />-
<br />A403
<br />CEILING DETAILS
<br />S001
<br />GENERAL NOTES
<br />S101
<br />PARTIAL EXISTING ROOF FRAMING PLAN
<br />S102
<br />SECTIONS & DETAILS
<br />MECHANICAL, ELECTRICAL, PLUMBING
<br />M001
<br />MECHANICAL DETAILS & NOTES
<br />-
<br />M002
<br />MECHANICAL SPECIFICATIONS
<br />-
<br />M100
<br />HVAC DEMOLITION PLAN
<br />-
<br />M200
<br />HVAC PLAN
<br />-
<br />P001
<br />PLUMBING NOTES & SPECIFICATIONS
<br />-
<br />P002
<br />PLUMBING DETAILS
<br />-
<br />P003
<br />PLUMBING ISOMETRICS
<br />-
<br />P100
<br />PLUMBING DEMOLITION PLAN
<br />P200
<br />PLUMBING PLAN
<br />-
<br />E001
<br />ELECTRICAL DETAILS, NOTES & SPECIFICATIONS
<br />E002
<br />ELECTRICAL DETAILS, NOTES & SPECIFICATIONS
<br />-
<br />E003
<br />ELECTRICAL DETAILS, NOTES & SPECIFICATIONS
<br />-
<br />E004
<br />ELECTRICAL DETAILS, NOTES & SPECIFICATIONS
<br />-
<br />E005
<br />ELECTRICAL DETAILS, NOTES & SPECIFICATIONS
<br />-
<br />E006
<br />ELECTRICAL DETAILS, NOTES & SPECIFICATIONS
<br />-
<br />E100
<br />ELECTRICAL DEMOLITION PLAN
<br />-
<br />E200
<br />LIGHTING PLAN
<br />-
<br />E201
<br />POWER / SYSTEMS PLAN
<br />-
<br />E202
<br />ELECTRICAL DIMENSIONING PLAN
<br />-
<br />12-PVC30-GO01-REV00
<br />NEXTORE
<br />NEXTORE
<br />6 CREAMERY BROOK
<br />4000 LUXOTTICA PLACE
<br />EAST GRANBY, CT 06026
<br />MASON, OH 45040
<br />516.393.2484
<br />513.765.6000
<br />DESIGN AND CONSTRUCTION MANAGEMENT
<br />NOTE:
<br />ANY QUESTIONS REGARDING THESE CONSTRUCTION DOCUMENTS SHOULD BE
<br />DIRECTED TO THE NEXTORE PROJECT PLANNER
<br />FOR APPROPRIATE DIRECTION OF
<br />COMMUNICATION.
<br />NEXTORE PROJECT MGR.
<br />NEXTORE STORE PLANNER
<br />JEB BREWER
<br />ANDREW GOLDMAN
<br />425-760-0814
<br />248-882-8393
<br />JBREWER@NEXTORERETAIL.COM
<br />AGOLDMAN@NEXTORERETAIL.COM
<br />NEXTORE STORE PLANNER
<br />PERMIT EXPEDITOR
<br />ALYSSA NASH
<br />Tim Schenk
<br />860-431-9700
<br />Elder -Jones, Inc.
<br />ANASH@NEXTORERETAIL.COM
<br />Ph: 952-345-6040
<br />Cell: 952-250-9864
<br />tims@elderjones.com
<br />13-PVC30-GO01-REV00
<br />1. SPRINKLER
<br />2. FIRE ALARM
<br />3. SIGNAGE
<br />14-PVC30-0001-REV00
<br />EVERETT FIRE DEPT. REVIEW
<br />Permittf:
<br />:APPROVED
<br />Site Addre
<br />[3APPROVED WITH CHANGES NOTED
<br />Owner:
<br />Tenant:
<br />13 REVISE AND RESUBMIT
<br />App. Date
<br />0 REJECTED:
<br />Proposed
<br />❑ SEE ATTACHED CHECKLIST/HANDOUT
<br />Descriptic
<br />The issuance of a permit shall not
<br />be construed as authority to violate,
<br />cancel or set aside any provision of
<br />Reviewed
<br />the Everett fire Code or other
<br />aff1Ce
<br />applicable regulations or laws. The
<br />issuance of a permit based on
<br />construction documents and other
<br />data shall not prevent the Fire Code
<br />Offical from requiring the correction
<br />of error$.
<br />By:. ..
<br />ND<MRE
<br />EQESIGN
<br />CONSTRUCTION
<br />MANAGEMENT
<br />STORE 46261
<br />910 CENTER
<br />910 SE EVERETT MALL WAY
<br />EVERETT, WA 98208
<br />Construction for:
<br />z0
<br />O 0
<br />O
<br />I�2O
<br />0
<br />C
<br />x O
<br />t0 J C�6
<br />'D
<br />W �
<br />c a)
<br />(
<br />+-� � U
<br />W
<br />M O
<br />W 2!1
<br />0
<br />O
<br />� J
<br />No
<br />CD
<br />WQCD
<br />Revisions:
<br />Mark Date
<br />Architect of Record
<br />C N
<br />C 0 R T L A N 0
<br />M 0 R G A N
<br />ARCHITECT
<br />711 N. FIELDER RD.
<br />ARLINGTON, TX 76012
<br />PH: (817) 635-5696
<br />FAX: (817) 635-5699
<br />Seal
<br />REGISTERED
<br />A ITECT
<br />CORTLAND MORGAN
<br />STATE OF WASHINGTON
<br />Architect Job No.:
<br />33N2022
<br />Nextore Store Design Revision No.:
<br />7
<br />Nextore Project
<br />Number 86841
<br />Brand Design Type:
<br />B2204-058
<br />ss: 910 SE EVERETT MALL WAY STE 103
<br />RANDS 910 CENTER LLC
<br />PEARLE VISION CENTER-STE 103
<br />4/25/2022
<br />Use: COMMERCIAL
<br />n: REMODEL OF FORMER T MOBILE INTO A
<br />PEARLE VISION CENTER
<br />By: Date:
<br />Set Job Site Set Fire/Planning Set
<br />Date Sheet
<br />04/19/2022
<br />Drawn By
<br />- STAFF 0001
<br />Checked By
<br />CM
<br />
|