Laserfiche WebLink
LARGE SMALL O.D. <br />EXAM EXAM RECEPTION <br />HVAC -- PLAN <br />SCALE: 1/4" - V-0" <br />I LL f REGISTER' <br />l FF ALE <br />TAG <br />SERVICE <br />(MOUNTING <br />MFR <br />MODEL <br />MODULE SIZE <br />FINISH <br />NOTES <br />S1 <br />SUPPLY <br />SURFACE <br />TITUS <br />OMNI <br />24" X 24" <br />PAINT TO MATCH <br />1, 2, 3 <br />AIR <br />CEILING <br />S2 <br />SUPIPRLY <br />LAY -IN <br />TITUS <br />OMNI <br />24" X 24" <br />S T DI WHITE <br />2 <br />R1 <br />RETURN <br />SURFACE <br />TITUS <br />50F <br />24" X 24" <br />PAINT TO MATCH <br />1, 2, 3 <br />AIR <br />CEILING <br />R2 <br />RETURN <br />SURFACE <br />TITUS <br />50F <br />24" X 12" <br />PAINT TO MATCH <br />1, 2, 3 <br />AIR <br />CEILING <br />R3 <br />RETURN <br />LAY -IN <br />TITUS <br />50F <br />24" X 12" <br />STD. WHITE <br />2 <br />AIR <br />FINISH <br />NOTES/ACCESSORIES <br />1. SECTORIZING BAFFLES FOR DIRECTIONAL CONTROL WHERE NOTED ON DRAWINGS <br />2. PROVIDE YOUNGS REGULATOR TO CONTROL <br />BALANCING <br />DAMPER IN AREAS WITH GYPSUM <br />BOARD CEILING. INSTALL <br />YOUNGS REGULATOR <br />ON FACE OF <br />AIR DEVICE PER DETAIL M014 ON M001. <br />3. PAINT DIFFUSER TO MATCH THE ADJACENT CEILING <br />FINISH. <br />TAG MODEL TONS E.A. <br />DI31WB <br />RTU-1- -- YHC036E3RM - 3 80/67 <br />RTU-2 YHC092F3RM 7.5 80/67 <br />NOTES. <br />1. EQUIPMENT IS SUPPLIED BY TENANT AND INSTALLED BY THE MECHANICAL CONTRACTOR. <br />2. Provide hail guards <br />3. Provide with comparative enthalpy economizer with barometric relief damper <br />4. Provide MERV 13 filters. <br />5. Provide hinged access panels. <br />6. Provide hot gas reheat. <br />1.110 7�1►�C <br />I <br />FAN CFM O:A. ESP <br />HIP <br />0.75 1280 150 0.5 <br />2.75 2520 280 0.5 <br />INPUT <br />MBH <br />80 <br />150 <br />ONT <br />OIE <br />DE CABLE OPERATED DAMPERS WHERE DAMPERS ARE INSTALLED OVER <br />iM BOARD CEILING. PROVIDE YOUNGS REGULATOR AND BOWDEN CABLE <br />APPLICABLE. IN AREAS WITH LAY -IN CEILING, ONLY A MANUAL VOLUME <br />-R IS REQUIRED. <br />)�N OVER NOTES (CONTRACTOR TO <br />)VIDE TO THE PM THE FOLLOWING PRIOR <br />INITIAL PUNCHLIST); <br />1. AIR BALANCE REPORT TO STATE EQUIPMENT INFORMATION INCLUDING <br />MODEL NUMBER, SERIAL NUMBER, RATED AND TESTED AMP DRAW, RATED <br />AND TESTED VOLTAGE AND ANY ALTERATIONS OF THE EQUIPMENT <br />REQUIRED TO ACHIEVE DESIGN AIR FLOW. <br />2. CHANGE FILTER MEDIA PRIOR TO TURN OVER. <br />3. DEMONSTRATE EQUIPMENT HEATS AND COOLS. <br />4. CLEAN DRAIN PANS PRIOR TO TURN OVER. <br />PROVIDE FIRE STOPPING FOR ALL PENETRATIONS OF FIRE WALLS. PROVIDE <br />THROUGH WALL FIRE STOPPING FOR ALL LOCATIONS WHERE JUNCTION BOXES <br />ARE LOCATED IN A DEMISING WALL, OR OTHER FIRE WALL. <br />THESE DRAWINGS ARE RA D INDICATE WORK. <br />CONTRACTORAD PROPER A <br />ALL MECHANICAL SYSTEMS. THE CONTRACTOR SHALL PROVIDE D <br />REQUIREDFITTINGS WHICH MAY BE DUE TO SPACE CONSTRAINTS <br />ROUTE ALL NEW DUCTWORK AS TIGHT TO ROOF DECK AS POSSIBLE. NEW DUCTWORK SMALL BE <br />ROUTED BETWEEN ROOF STRUCTURE AS NEEDED. COORDINATE WITH ALL TRADES AND PROVIDE <br />OFFSETS AS REQUIRED TO AVOID CONFLICT. <br />TAG <br />ISTYLE <br />jCFM <br />I MAN UFACTURERI <br />MODEL <br />ISTATIC <br />IVOLTAGE <br />I POWER <br />INOTES <br />CEF-1 <br />CEILING I <br />100 <br />LOREN-COOK <br />GC-144 <br />1 <br />0.3751 <br />120 <br />104W <br />1 1 <br />NOTES: <br />1. CONTROL FAN WITH ROOM SWITCH <br />OUTPUT VOLT/ <br />MCA <br />MAX <br />WT. DIMENSIONS <br />NOTES <br />MBH <br />PHASE <br />FUSE <br />LENGTH (fl) WIDTH (ft) <br />64 <br />208/3 <br />21 <br />30 <br />767 <br />5.82 1 <br />3.69 <br />1-6 <br />120 <br />208/3 <br />42 <br />1 <br />50 <br />1291 <br />7.39 1 <br />4.44 <br />1-7 <br />10 KEY NOTES - MECHANICAL PLAN I <br />1. PROVIDE DAMPERS PER DETAIL. <br />2. PROVIDE DUCT TAKE OFFS PER DETAIL. HIGH EFFICIENCY FITTINGS SHALL BE USED. SEE DETAIL. <br />3. INSULATE ALL SUPPLY DUCTWORK PER APPLICABLE ENERGY/MECHANICAL CODE - MOST <br />RESTRICTIVE TO GOVERN. <br />4. REMOTE SENSOR. CONNECT TO MAIN THERMOSTAT. <br />5. NOT USED. <br />6. NOT USED. <br />7. EXTEND 8" EXHAUST DUCT TO LANDLORD PROVIDED EXHAUST MAIN, VERIFY LOCATION IN <br />FIELD, COORDINATE WORK WITH LANDLORD. <br />8. CONTROL FAN WITH ROOM OCCUPANCY SENSOR. <br />9. PROVIDE NEW THERMOSTAT WIRING FROM DEVICE TO RTU CONTROLLER. CONCEAL ALL <br />CONTROL WIRING WITHIN WALLS AND ABOVE CEILING. <br />10. INSTALL SMOKE DETECTOR IN RETURN DUCT ADJACENT TO ACCESS PANEL. <br />11. PROVIDE NEW ROOF TOP UNIT (RTU) IN PLACE OF EXISTING WITH CURB ADAPTER. FIELD VERIFY <br />EXACT LOCATION AND EXISTING CONDITIONS PRIOR TO BID. <br />12. PROVIDE NEW ROOF TOP UNIT (RTU) IN LOCATION AS SHOWN WITH NEW 14" ROOF CURB. <br />GENERAL NOTES - MECHANICAL PLAN <br />A. ALL WORK MUST COMPLY WITH THE REQUIREMENTS OF LOCAL CODES AND ORDINANCES. <br />WHERE INSPECTIONS ARE REQUIRED BY AUTHORITIES HAVING JURISDICTION, WORK MUST <br />NOT BE CONCEALED UNTIL INSPECTIONS AND TESTING ARE COMPLETED AND ACCEPTED. <br />B. PRIOR TO BID, GENERAL CONTRACTOR MUST BECOME THOROUGHLY FAMILIAR WITH THE <br />REQUIREMENTS OF THE GENERAL NOTES AS WELL AS ALL OTHER NOTES SHOWN ON THE <br />CONTRACT DOCUMENTS. VISIT THE SITE TO ESTABLISH THE EXISTING CONDITIONS PRIOR TO <br />BID AND PRIOR TO ANY DUCT, PIPE OR EQUIPMENT FABRICATION, SYSTEMS MUST BE <br />ERECTED USING GENERAL CONTRACTOR'S FIELD MEASUREMENTS FOR COORDINATION WITH <br />EQUIPMENT, STRUCTURE, FIRE PROTECTION AND ELECTRICAL CONDITIONS IN THE SPACE. <br />C. ALL CONTRACT DOCUMENTS ARE DIAGRAMMATIC AND INDICATE THE GENERAL <br />ARRANGEMENTS OR GEOMETRICAL RELATIONSHIPS OF EQUIPMENT AND SERVICES. THEY ARE <br />NOT INTENDED TO SPECIFY OR SHOW EVERY OFFSET, SEQUENCE, DEVICE, OPTION, FITTING, <br />OR COMPONENT. <br />D. THE CONTRACT DOCUMENTS REFLECT A SYSTEM DESIGNED AROUND SPECIFIC REFERENCE <br />PRODUCTS, THE SELECTION OF WHICH HAS IMPACTED THE DESIGNS OF OTHER TRADES. IF <br />ALTERNATE MANUFACTURERS ARE SUBMITTED OR BID, IT IS THE RESPONSIBILITY OF THIS <br />GENERAL CONTRACTOR TO COORDINATE ALL DIFFERENCES AND IMPACTS WITH ALL <br />TRADES PRIOR TO BID, INCLUDING COSTS ASSOCIATED WITH REQUIRED CHANGES TO OTHER <br />TRADES. NO EXTRAS WILL BE ALLOWED FOR CHANGES REQUIRED TO OTHER TRADES IF <br />ALTERNATE EQUIPMENT IS BID OR INSTALLED AT THE GENERAL CONTRACTOR'S OPTION. <br />E. EXISTING MECHANICAL INFORMATION IS BASED ON LIMITED EXISTING BUILDING DRAWINGS <br />AND FIELD WORK. THE GENERAL CONTRACTOR SHALL FIELD VERIFY THE EXISTING <br />CONDITIONS FOR ACCURACY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED FOR <br />REVISIONS TO THE DESIGN TO CORRECT FOR EXISTING CONDITIONS NOT AS INDICATED ON <br />THE PLANS. <br />F. GENERAL CONTRACTOR SHALL NOTIFY TENANT, ARCHITECT AND ENGINEER OF ANY <br />SITUATIONS THAT MODIFY OR INCREASE THE SCOPE OF WORK FROM THAT IS DESCRIBED IN <br />THE DOCUMENTS. <br />G. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING/PATCHING RELATED TO <br />THEIR WORK. <br />H. SPACE ABOVE CEILING IS INDICATED TO BE A RETURN AIR PLENUM. CONSTRUCTION <br />MATERIALS ABOVE CEILING SHALL BE NONCOMBUSTIBLE, OR HAVE A MAXIMUM 25 FLAME <br />SPREAD AND 50 SMOKE DEVELOPMENT FINISH RATING, WIRING SHALL BE LABELED PLENUM <br />RATED TYPE PER NFPA 70. <br />1. COORDINATE LOCATION AND ELEVATION OF MECHANICAL WORK WITH ALL DUCTWORK, <br />LIGHT FIXTURES, AND OTHER CEILING BUILT-IN FIXTURES. CONTACT ENGINEER OR ARCHITECT <br />IMMEDIATELY SHOULD ANY CONFLICT ARISE. <br />J. ALL ROOF PENETRATIONS, PATCHING AND FLASHING SHALL BE PERFORMED BY A LANDLORD <br />APPROVED ROOFING GENERAL CONTRACTOR AT THIS GENERAL CONTRACTOR'S EXPENSE. <br />COORDINATE ROOF PENETRATIONS AND ROOFTOP EQUIPMENT LOCATIONS WITH <br />LANDLORD AND GENERAL CONTRACTOR. <br />K. NOTHING 1S PERMITTED TO BE ATTACHED TO, SUSPENDED FROM, OR PENETRATE THE ROOF <br />DECK. GENERAL CONTRACTOR MAY ATTACH TO OR SUSPEND FROM THE TOP CHORD OF <br />THE JOIST OR THE STRUCTURAL STEEL WHICH EXISTS ABOVE THE TENANT SPACE, <br />L. ALL ROOFTOP UNITS TO BE LOCATED ON FACTORY SUPPLIED ROOF CURBS. <br />M. MAINTAIN A MINIMUM OF 10' CLEARANCE TO ANY OUTSIDE AIR INTAKES ON ROOF FOR ALL <br />EXHAUST FANS. <br />N. GENERAL CONTRACTOR TO LABEL ALL ROOFTOP EQUIPMENT WITH TENANT NAME, SPACE <br />NUMBER AND EQUIPMENT IDENTIFICATION (RTU-1, ETC.), PER MALL SPECIFICATIONS AND <br />STANDARDS. <br />O. CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION WITH A MAXIMUM <br />INCLUDE ANGLE OF DIVERGENCE OF 15 DEGREE. <br />P. DUCT SIZES INDICATED REPRESENT CLEAR INTERIOR SHEET METAL DIMENSIONS AND IF <br />INTERNAL INSULATION IS SPECIFIED THE DIMENSIONS INCLUDE ALLOWANCE FOR INTERNAL <br />INSULATION. <br />Q. ALL SUPPLY AIR DUCTWORK NOT EXPOSED OR INTERNALLY LINED SHALL BE EXTERNALLY <br />INSULATED. REFER TO SPECIFICATIONS. <br />R. BRANCH DUCTS SERVING DIFFUSERS SHALL BE SIZED TO MATCH DIFFUSER NECK SIZE <br />INDICATED. ALL ROUND DUCT ELBOWS SHALL BE LONG SWEEP, 1-1/2 TIMES THE CENTERLINE <br />RADIUS. ALL CONDENSATE PIPING SHALL BE COPPER, AND INSULATED BELOW ROOF LINE. <br />GENERAL CONTRACTOR SHALL VERIFY, PRIOR TO BID, THE CORRECT METHOD AND <br />LOCATION OF CONDENSATE DISCHARGE FROM UNITS WITH THE LANDLORD, <br />S. PITCH POCKETS ARE NOT PERMITTED ON THE ROOF FOR CONDENSATE DRAINS, POWER OR <br />CONTROL WIRING. ALL CONNECTIONS ARE TO BE MADE INSIDE THE EQUIPMENT CURB OR <br />THROUGH PRE -MANUFACTURED PIPING CURB. <br />T. GENERAL CONTRACTOR MUST REPLACE ALL AIR FILTERS IN HVAC UNITS WITH NEW CLEAN <br />FILTERS BEFORE AIR BALANCING AND PRIOR TO FINAL TURNOVER TO TENANT, <br />U. IT IS THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO VISIT THE JOB SITE PRIOR <br />TO CONSTRUCTION TO FAMILIARIZE HIMSELF WITH MAJOR ITEMS SUCH AS STRUCTURAL <br />ELEMENTS, PLUMBING LOCATIONS, ELECTRICAL RUNS AND POINTS OF CONNECTION TO <br />EXISTING DUCT SYSTEMS. ADDITIONALLY, MECHANICAL CONTRACTOR SHALL VERIFY EXACT <br />LOCATIONS AND DIMENSIONS OF SUCH ITEMS AS HVAC EQUIPMENT, DUCTWORK, ETC. <br />PRIOR TO COMMENCING ANY WORK, <br />V. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE MECHANICAL <br />EQUIPMENT COMPONENTS ARE INSTALLED AT LOCATIONS AND ELEVATIONS WHICH MAKE <br />THEM READILY AND SAFELY ACCESSIBLE FOR ROUTINE MAINTENANCE WITHOUT REQUIRING <br />ANY EXTRAORDINARY MEASURES. <br />W. THE TENANT RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS <br />AND SPECIFICATIONS. SHOULD THE TENANT FIND CORRECTIVE WORK NECESSARY, HE WILL <br />NOTIFY GENERAL CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE <br />PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, <br />THE COST OF REINSPECT IONS WILL BE BORNE BY THE GENERAL CONTRACTOR. IF WORK IS <br />REQUIRED BY TENANT IN ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING <br />OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION, WARRANTY OR OTHER INABILITY <br />TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE, GENERAL CONTRACTOR <br />SHALL BE DIRECTED BY TENANT TO ADDRESS THIS WORK IN A TIMELY MANNER. IF IT <br />BECOMES EVIDENT THAT THE GENERAL CONTRACTOR CAN NOT ACCOMPLISH THE TASK, <br />THEN AFTER 72 HOURS OF WRITTEN NOTICE, THE TENANT MAY AT HIS DISCRETION TAKE <br />OVER SUCH WORK AND BACK CHARGE THE GENERAL CONTRACTOR FOR ANY CORRECTIVE <br />WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND/OR <br />ADHERENCE TO PLANS AND SPECIFICATIONS. <br />0 <br />� d- <br />o � <br />00 <br />mom L)O <br />4- <br />0 0 <br />b <br />U <br />O 0- <br />R O <br />�D __j <br />�a <br />QC <br />UJI <br />d <br />Revisions: <br />Mark Date <br />A <br />A <br />d <br />�ll� I�1LT?�f���„Vl'�+Ji� <br />wl� <br />1", <br />Architect Job No.: <br />33N2022 <br />Nextore Store Design Revision No.: <br />ISSUED FOR: <br />❑ CONSTRUCTION <br />Title <br />uate <br />04/19/2022 <br />Drawn 6y <br />TBA <br />Checked By <br />-r n A <br />Sheet <br />aY'F Y <br />