THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND OTHE'.
<br />ORDINANCES, CODES AND REGULATIONS LISTED IN THE SPECIFICATIONS OR
<br />ON THE DRAWINGS, AND REQUIRED BY LOCAL BUILDING AUTHORITIES. THE
<br />GOVERNING CODES, RULES AND REGULATIONS ARE COLLECTIVELY REFERREE
<br />TO AS 'THE CODE." THE CONTRACTOR SHALL REPORT ANY INCONSISTENCIES
<br />CONFLICTS OR OMISSIONS DISCOVERED TO THE ARCHITECT FOR
<br />INTERPRETATION PRIOR TO PERFORMING THE WORK
<br />2. THE GENERAL CONTRACTOR SHALL CONTACT BUILDING MANAGEMENT TO
<br />DETERMINE THE RULES OF THE BUILDING RELATIVE TO CONSTRUCTION; WH
<br />AND HOW DELIVERIES CAN BE MADE, WHAT PHASES AND TYPES OF
<br />CONSTRUCTION MAY BE DONE ON REGULAR OR OVERTIME BASIS, AND IN
<br />GENERAL ANY SPECIAL BUILDING REQUIREMENTS WHICH WILL AFFECT THE
<br />COST OF ALL WORK BORNE BY THE GENERAL CONTRACTOR. ALL WORK SHAL
<br />CONFORM TO ALL BASE BUILDING STANDARD SPECIFICATIONS AND BUILDIN(
<br />REGULATIONS, WHICH THE CONTRACTOR SHALL OBTAIN PRIOR TO
<br />SUBMISSION OF BID.
<br />3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUB-
<br />CONTRACTORS' RECEIPT OF
<br />COMPLETE SETS OF THESE DOCUMENTS AS WEL
<br />AS ALL FUTURE ADDENDA, BULLETINS, FIELD DIRECTIVES AND CHANGE
<br />ORDERS.
<br />4. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING MANAGEMENT
<br />THE STORAGE OF MATERIALS AND SHALL PROVIDE PROTECTION AS NECESSA
<br />TO PREVENT VANDALISM AND LOSS OF MATERIALS BY THEFT OR DAMAGE
<br />SUSTAINED DUE TO EXPOSURE TO INAPPROPRIATE ENVIRONMENTAL
<br />CONDITIONS AND WILL REPAIR & REPLACE DAMAGE OR LOSSES AT THE
<br />CONTRACTOR'S EXPENSE WITHOUT CHARGE TO THE OWNER.
<br />5. WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION AREA WI
<br />BE OCCUPIED DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHAL
<br />A. CONFORM TO TENANT REQUIREMENTS FOR HOURS OF
<br />CONSTRUCTION OPERATIONS, ACCESS TO TENANT SPACES AND
<br />ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS
<br />B. CONSTRUCTION OPERATIONS SHALL NOT BLOCK HALLWAYS ACCESSIE
<br />ROUTES OR MEANS OF EGRESS FOR OCCUPANTS OF BUILDING.
<br />C. CONSTRUCTION OPERATIONS SHALL NOT CAUSE INTERRUPTIONS OF
<br />ELECTRICAL SERVICES TO THE TENANT OF THE BUILDING WITHOUT
<br />PRIOR NOTIFICATION AND APPROVALS, PROPERLY PROTECT ALL
<br />DOORS IN PUBLIC AREAS SUBJECT TO CONSTRUCTION TRAFFIC. SHO
<br />WIPING MATS WILL BE INSTALLED AT ALL OPENINGS BETWEEN
<br />CONSTRUCTION AREAS AND ALL PUBLIC SPACES. ALL ACT IVE AREAS
<br />SHALL BE KEPT CLEAN AND FREE FROM DEBRIS.
<br />D. ERECT AND MAINTAIN TEMPORARY BRACING, LIGHTS, DUSTPROOF
<br />PARTITIONS, BARRICADES, FENCES AND WARNING SIGNS AS
<br />NECESSARY TO PREVENT INJURY, NOISE, DUST AND INCONVENIENCE
<br />TO THE TENANT, AND TO PREVENT DAMAGE TO ADJACENT
<br />CONSTRUCTION WHICH IS TO BE LEFT IN PLACE.
<br />E. CONTRACTOR SHALL FOLLOW THE RECOMMENDED CONTROL
<br />MEASURES OF THE SHEET METAL AND AIR CONDITIONING NATIONAL
<br />CONTRACTORS ASSOCIATION (SMACNA) IAQ GUIDELINES FOR
<br />OCCUPIED BUILDINGS UNDER CONSTRUCTION, 2ND EDITION 2007,
<br />ANSI/SMACNA 008-2008 (CHAPTER 3). ? PROTECT STORED ON -SITE
<br />AND INSTALLED ABSORPTIVE MATERIALS FROM MOISTURE DAMAGE.
<br />F. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING
<br />CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY
<br />REPORTING VALUE (MERV) OF 8 MUST BE USED AT EACH RETURN AIR
<br />GRILLE.
<br />6. ALL CUTTING, CHASING, DRILLING OR DEMOLITION OF WALLS, SLABS, ETC.
<br />REQUIRING THE USE OF JACKHAMMERS OR OTHER HEAVY HAND OR POWER
<br />TOOLS SHALL BE PERFORMED AFTER REGULAR BUSINESS HOURS ON AN
<br />OVERTIME BASIS IF NECESSARY, UNLESS THE BUILDING MANAGEMENT AND
<br />ANY AFFECTED TENANTS PROVIDE A WRITTEN WAIVER EXPRESSLY PERMTTTI
<br />OTHERWISE.
<br />7. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOI
<br />JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS
<br />PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS
<br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
<br />NORMAL WORKING HOURS, THE CONTRACTOR SHALL PROVIDE PUBLIC
<br />PROTECTION, AS NECESSARY AND REQUIRED BY GOVERNING AGENCIES
<br />HAVING JURISDICTION, UNTIL CLIENT ACCEPTANCE OF THE PREMISES.
<br />8. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROVISION
<br />AND MAINTENANCE OF ALL BRACING, SHORING, ENCLOSURES, BARRIERS OR
<br />SCAFFOLDING REQUIRED TO PROVIDE A SAFE WORKING ENVIRONMENT AS
<br />DICTATED BY SITE CONDITIONS AND THE PROGRESS OF WORK,
<br />9. DURING THE ENTIRE CONSTRUCTION PERIOD, ALL EXITS, EXIT LIGHTING,
<br />FIRE PROTECTION DEVICES AND ALARMS SHALL BE CONTINUOUSLY
<br />MAINTAINED IN CONFORMANCE WITH LOCAL BUILDING CODE AND OTHER
<br />GOVERNING ENTITY REQUIREMENTS. UNO, ALL EXISTING, SERVICES AND
<br />DEVICES SHALL REMAIN ACTIVE.
<br />10. THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT AND THE
<br />BUILDING OWNER, INCLUDING, BUT IS NOT LIMIT ED TO, WINDOWS, FLOOR
<br />AND CEILING FINISHES, PUBLIC TOILETS, ELEVATORS, DOORS & BUCKS,
<br />ELECTRICAL AND AIR-CONDI T IONING EQUIPMENT. THE CONTRACTOR SHALL
<br />PROTECT ADJOINING PROPERTY, DAMAGE CAUSED BY THE CONTRACTOR'S
<br />WORK OR WORKMEN MUST BE MADE GOOD, IN A TIMELY FASHION.
<br />PATCHING AND REPLACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT
<br />THE COST OF THE CONTRACTOR.THE CONTRACTOR SHALL BE FULLY
<br />RESPONSIBLE FOR ALL SUB -CONTRACTORS. IF THE CONTRACTOR FAILS TO
<br />COMPLETE THE REPAIRS IN A TIMELY FASHION, SAID REPAIRS WILL BE MADE
<br />BY A CONTRACTOR SELECTED BY THE OWNER'S REPRESENTATIVE AND BACK
<br />CHARGED ACCORDINGLY.
<br />11. THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE LANDLORD,
<br />THE TENANT, AND ARCHITECT AGAINST ANY AND ALL CLAIMS AND DEMANDS
<br />FOR THE DAMAGE TO THE PROPERTY OF ANY PERSON, FIRM OR INDIVIDUAL
<br />OR FOR PERSONAL INJURIES (INCLUDING DEATH) ARISING OUT OF, OR
<br />SUFFERED WHILE ENGAGED IN, OR CAUSED, IN WHOLE OR IN PART, BY THE
<br />EXECUTION OF THE WORK; THE CONTRACTOR SHALL WELL AND TRULY
<br />DEFEND THE LANDLORD, TENANT AND ARCHITECT AND SHALL. PAY ALL
<br />MONIES AWARDED FOR SUCH DAMAGES OR INJURIES (INCLUDING DEATH), A
<br />COSTS INCLUDING ATTORNEY'S FEES SUSTAINED, AND SHALL OBTAIN A FULL
<br />ACQUAINTANCE AND RELEASE IN FAVOR OF THE LANDLORD, TENANT AND
<br />ARCHITECT, UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGEN(
<br />OF THE LANDLORD, TENANT, ARCHITECT, ITS AGENTS OR EMPLOYEES.
<br />12. THE ARCHITECT SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE
<br />ANY WORK, NOR FOR THE MEANS AND METHODS OF CONSTRUCTION CHOSEI
<br />BY THE CONTRACTOR OR ANY SUB -CONTRACTORS, NOR SHALL THE ARCHITE
<br />GUARANTEE THE PERFORMANCE OF THEIR CONTRACTS.
<br />13. THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB SITE
<br />DURING THE CONSTRUCTION PERIOD AND SHALL PROTECT FINISHED WORK
<br />FROM DAMAGE. IMMEDIATELY PRIOR TO TENANT OCCUPANCY, THE
<br />CONTRACTOR SHALL PERFORM FINAL CLEANING OF THE WORK AREA
<br />INCLUDING, BUT NOT LIMITED TO, WET WIPING OF FURNITURE, AND
<br />CASEWORK, WASHING AND WAXING OF VCT FLOORING AND THE VACUUMIN(
<br />OF CARPET. ALL CLEANING SHALL BE IN ACCORDANCE WITH
<br />MANUFACTURERS' RECOMMENDATIONS
<br />14. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL
<br />SUB -CONTRACTORS AND SHALL PERFORM SUCH MISCELLANEOUS WORK AS
<br />MAY BE NECESSARY FOR THEM TO COMPLETE THEIR WORK. Ir IS EXPECTED
<br />THAT THE CONTRACTOR SHALL ALSO CLOSELY COORDINATE THE WORK WIT
<br />THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO ASSURE THAT
<br />ALL SCHEDULES ARE MET AND THAT WORK PROCEEDS WITHOUT DELAY.
<br />15. BIDDERS, BEFORE SUBMITTING PROPOSALS, SHALL VISIT AND CAREFULLY
<br />EXAMINE THE AREA AFFECTED BY THE WORK TO FAMILIARIZE THEMSELVES
<br />WITH THE EXISTING CONDITIONS AND THE DIFFICULTIES THAT WILL AFFEC
<br />THE EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE
<br />CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE,
<br />AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR,
<br />EQUIPMENT, OR MATERIALS, REQUIRED BECAUSE OF DIFFICULTIES
<br />ENCOUNTERED WHICH COULD HAVE BEEN REASONABLY FORESEEN HAD SUCI
<br />AN EXAMINATION BEEN MADE, THE GENERAL CONTRACTOR SHALL VERIFY AL
<br />CONDITTIONS AND DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL
<br />DISCREPANCIES AND/OR UNUSUAL CONDITIONS TO THE ARCHITECT PRIOR
<br />TO FINALIZING BIDS OR COMMENCEMENT OF ANY CONSTRUCTION,
<br />16. THE GENERAL CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LIMITATION`.
<br />EXCLUSIONS, OR MODIFICATIONS TO THE PROJECT DURING THE BID
<br />SELECTIONS PERIOD. ANY AND ALL LIMITATIONS, EXCLUSIONS, OR
<br />MODIFICATIONS NOT IT EMIZED IN THE BID PROPOSAL DOCUMENTS ARE
<br />PRESUMED "INCLUDED", IN WHICH CASE NO ADDITIONAL MONIES WILL BE
<br />ALLOCATED FOR THIS WORK
<br />17, EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ARE PER EXISTING
<br />DRAWINGS. ALL EXISTING INFORMATION MUST BE VERIFIED IN THE FIELD.
<br />NEITHER THE OWNER NOR THE ARCHITECTS ARE RESPONSIBLE FOR ACCURA
<br />OF EXISTING INFORMATION. EXISTING CONSTRUCTION CONDITIONS IN ARE,
<br />WHERE NEW WORK IS NOT PLANNED MAY BE NOT COMPLETELY SHOWN.
<br />18, THE CONTRACTOR SHALL OBTAIN ALL PERMITS FOR ALL SITE DEVELOPMENT
<br />WORK, PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING
<br />AUTHORITIES' SPECIFICATIONS FOR BUT NOT LIMITED TO, GUTTERS,
<br />SIDEWALKS, POLES, AND OTHER STRUCTURES, INCLUDING THE REMOVAL OF
<br />RELOCATION OF EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN
<br />ON PLANS OR NOTED OTHERWISE.
<br />19. SEPARATE PERMITS, WHEN REQUIRED AND/OR WHEN WORK ITEMS ARE
<br />DESIGN/BUILD IN NATURE, SHALL BE OBTAINED BY THE CONTRACTOR FOR
<br />MECHANICAL, PLUMBING, FIRE SPRINKLERS, ELECTRICAL AND FIRE ALARM.
<br />DESCRIPTIVE, DETAILED DESIGN AND REQUIRED SUBMITTAL DOCUMENTS
<br />INFORMATION SHALL BE PROVIDED FOR REVIEW BY THE REGULATING
<br />AUTHORITIES AND BY THE TENANT FOR APPROVAL PRIOR TO ANY WORK
<br />BEING PERFORMED. SEE SPECIFICATIONS FOR REQUIREMENT FOR
<br />DESIGN/BUILD FIRE SPRINKLER SYSTEM. SUBMIT PLAN TO AND OBTAIN
<br />PERMIT FROM THE AUTHORITY HAVING JURISDICTION FOR FIRE SPRINKLER
<br />SYSTEM INSTALLATION OR MODIFICATION. ALL WORK SHALL COMPLY WITH
<br />CURRENT GOVERNING CODES.
<br />ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH CURRENT
<br />GOVERNING CODES. NOTHING IN THESE DRAWINGS IS TO BE CONSTRUED A'
<br />TO PERMIT WORK WHICH IS NOT CONFORMING TO CURRENT GOVERNING
<br />CODES.
<br />i OBTAINED FIRE DEPARTMENT
<br />20. ALL REQUIRED PERMITS MUST BE OBTAIN FROM THE
<br />PRIOR TO START OF CONSTRUCTION.
<br />21. ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY
<br />OF THE CONTRACTOR, UNO
<br />22. THE CONTRACTOR SHALL PAY THE EXPENSES FOR ALL TRANSPORTATION,
<br />HOISTING AND ELEVATOR USE CHARGES ON ALL MATERIALS OR EQUIPMENT
<br />TO THE POINT OF USE, AND SHALL BE RESPONSIBLE FOR ALL UNLOADING,
<br />CHECKING AND STORAGE OF THE SAME IN CONNECTION WITH THIS
<br />CONTRACT.
<br />23. OF THE INEVITABLE WASTE THAT IS GENERATED, AS MANY OF THE WASTE
<br />MATERIALS AS ECONOMICALLY FEASIBLE SHALL BE REUSED, SALVAGED, OR
<br />RECYCLED. WASTE DISPOSAL IN LANDFILLS SHALL BE MINIMIZED.
<br />CONTRACTOR SHALL COORDINATE WASTE MATERIALS HANDLING AND
<br />SEPARATION FOR ALL TRADES. CONTRACTOR SHALL PROVIDE SEPARATION,
<br />HANDLING, TRANSPORTATION, RECYCLING, SALVAGE, AND LANDFILLING FOR
<br />ALL DEMOLITION AND WASTE MATERIALS. RECYCLABLE MATERIALS CAN BE
<br />COMMINGLED IN DUMPSTERS ON -SITE AS LONG AS PROVISION IS MADE FOR
<br />HAULING TO A TRANSFER STATION WHERE SEPARATION WILL OCCUR.
<br />TRANSFER. STATION MUST PROVIDE DOCUMENTATION REPORT TYPES OF
<br />MATERIALS SEPARATED BY LOAD AND PERCENTAGE OF EACH LOAD. FINAL
<br />DESTINATION OF SORTED MATERIALS MUST ALSO BE REPORTED.
<br />DIVERSION GOALS: A MINIMUM 75% OF TOTAL PROJECT WASTE SHALL BE
<br />DIVERTED FROM LANDFILL. THE FOLLOWING WASTE CATEGORIES, AT A
<br />MINIMUM, SHALL BE DIVERTED FROM LANDFILL.
<br />a. CLEAN DIMENSIONED WOOD, PALLET WOOD
<br />b. CONCRETE
<br />c. CARDBOARD, PAPER, PACKAGING
<br />d. METALS
<br />e. GLASS
<br />f. PLASTICS
<br />g. BEVERAGE CONTAINERS
<br />24. THE CONTRACTOR, SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY
<br />ALL COSTS FOR TEMPORARY WATER, PLUMBING, POWER, LIGHTING,
<br />HEATING OR VENTILATION REQUIRED TO PROPERLY CONDUCT THE WORK.
<br />25. DIMENSIONS ARE TO FACE OF STUD, CONCRETE, OR MASONRY LION.
<br />DO NOT SCALE THESE DRAWINGS; WRITTEN DIMENSIONS SHALL GOVERN.
<br />SHOULD ANY DIMENSIONAL DISCREPANCIES BE ENCOUNTERED,
<br />CLARIFICATIONS SHALL BE OBTAINED FROM THE OFFICE OF THE ARCHITECT.
<br />26. LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER SCALE PLANS AND
<br />ELEVATIONS.
<br />27. INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS'
<br />RECOMMENDATIONS. ANY DIFFICULTIES ARE TO BE REPORTED TO THE
<br />ARCHITECT IMMEDIATELY.
<br />28. THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL WARRANTEE ALL
<br />WORK PERFORMED BY HIM DIRECTLY FOR A MINIMUM PERIOD OF ONE (1)
<br />YEAR AS SPECIFIED IN THE CONSTRUCTION CONTRACT. ALL DEFECTS
<br />OCCURRING IN THE GUARANTEED PERIOD SHALL BE CORRECTED AT NO
<br />ADDITIONAL COST,
<br />29. THE CLIENT, ARCHITECT, CONSULTANTS AND ALL INSPECTORS FROM
<br />PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB SITE AT ALL
<br />TIMES DURING NORMAL WORKING HOURS.
<br />30. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
<br />EQUIPMENT NECESSARY TO EXECUTE ALL WORK, EXCEPT WHERE NOTED AS
<br />NOT IN CONTRACT (N.I.C.).
<br />31. MINOR DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER
<br />CONSTRUCTION OF ANY PART OF THE WORK, SHALL BE INCLUDED AS IF THEY
<br />WERE INDICATED IN THE DRAWINGS, UNLESS OTHERWISE AGREED UPON.
<br />WHERE THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY
<br />WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE
<br />BUILDING CODE, OR ANY OTHER ENTITY HAVING JURISDICTION OVER THE
<br />WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE
<br />FURNISHED IN ALL CASES.
<br />32. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH
<br />MATERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE -CONSUMER (POST-
<br />INDUSTRIAL) AND POST -CONSUMER RECYCLED CONTENT. THE CONTRACTOR
<br />SHALL FURNISH THESE MATERIALS WITHIN THE PARAMETERS OF THE BUDGET
<br />AND SHALL NOT PURCHASE ANY COST -ADDING MATERIAL OR PAY A PREMIUM
<br />(MORE THAN FAIR MARKET VALUE) WITHOUT PROJECT MANAGER AND OWNER
<br />ACKNOWLEDGEMENT AND APPROVAL.
<br />33. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH
<br />MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT
<br />SITE WHERE AVAILABLE, WITHIN BUDGET, WITHIN FAIR MARKET VALUE AND
<br />DO NOT PRESENT RISK TO THE PROJECT SCHEDULE.
<br />34, FOR ALL NEW WOOD PRODUCTS INCLUDING BUT NOT LIMITED TO PARTICLE
<br />BOARD, MDF, PLYWOOD, OSB AND WOOD DOORS, THE CONTRACTOR SHALL
<br />FURNISH MATERIALS THAT CONTAIN NO ADDED UREA-FORMADALHYDE.
<br />35. DETAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. MINOR
<br />MODIFICATIONS MAY BE REQUIRED TO SUIT FIELD CONDITIONS.
<br />REQUIRED MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK.
<br />36. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER BY MECHANICS
<br />AND TRADESPERSONS SKILLED IN THEIR, RESPECTIVE TRADES AND IN
<br />ACCORDANCE WITH THE BEST TRADE PRACTICES.
<br />37. THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND DELIVERY TIMES
<br />FOR ALL SPECIFIED MATERIALS & EQUIPMENT REQUIRED TO PERFORM THE
<br />WORK UPON RECEIPT OF THE CONTRACT DOCUMENTS. SHOULD THE
<br />AVAILABILITY OF SPECIFIED ITEMS POSE A. DELAY TO THE ON -TIME
<br />COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL NOTIFY THE
<br />ARCHITECT IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO
<br />BE REVIEWED BY THE ARCHITECT IF SUCH A DELAY IS NOT ACCEPTABLE.
<br />38. CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS, I
<br />WHETHER DUE TO FIELD CONDITIONS OR OMISSIONS BY THE CONTRACTOR,
<br />ARCHITECT OR OWNER, SHALL BE DOCUMENTED BY THE ARCHITECT AND
<br />APPROVED, PRIOR TO EXECUTION.
<br />39. THE CONTRACTOR SHALL MAINTAIN AT THE SITE, ONE RECORD COPY OF ALL
<br />DRAWINGS, PERMITS, SUBMITTALS AND SAMPLES ON WHICH TO RECORD ALL
<br />CHANGES DURING CONSTRUCTION. ACCESS TO THESE SHALL BE PROVIDED FO
<br />THE USE OF ALL TRADES, CLIENT REPRESENTATIVES AND THE ARCHITECT,
<br />DURING ALL PHASES OF CONSTRUCTION.
<br />40. PRIOR TO THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL
<br />ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF MANUFACTURERS'
<br />CATALOG, OPERATING INSTRUCTIONS, START-UP CHECK LISTS, MAINTENANCE
<br />INSTRUCTIONS AND SIMILAR DATA, AS WELL AS ALL GUARANTEE(S) FOR ALL I
<br />EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE i
<br />CONTRACTOR UNDER THIS CONTRACT, AND SHALL ORIENT AND INSTRUCT
<br />THE PERSONNEL DESIGNATED BY THE CLIENT IN THE OPERATION OF ALL SUCH
<br />EQUIPMENT.
<br />41. ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY I
<br />INSURANCE AS REQUIRED BY ANY GOVERNING AGENCIES HAVING
<br />JURISDICTION AND COMPLYING WITH STATUTORY REQUIREMENTS FOR i
<br />DISABILITY AND WORKMEN'S COMPENSATION. i
<br />COORDINATION/ COORDINATION
<br />RESPONSIBILM NOTES
<br />1. THE FOLLOWING SCOPE OF WORK TO BE PROVIDED BY THE FOLLOWING ENTITIES:
<br />ALL ELECTRICAL (HIGH VOLTAGE) BY: GC
<br />CORE DRILLS FOR ALL WORK WITHIN CONTRACT BY: GC
<br />TRENCHING FOR ALL WORK WITHIN CONTRACT BY: GC
<br />SECURITY CABLING BY: OWNER/TENANT
<br />DATA CABLING (LOW VOLTAGE) BY: CLIENT VENDOR
<br />PHONE CABLING (LOW VOLTAGE) BY: CLIENT VENDOR
<br />2. GC RESPONSIBLE FOR COORDINATING SCHEDULE AND SCOPE WITH ALL CLIENT
<br />VENDORS. WORK SEQUENCE: THE WORK SHALL BE PERFORMED IN THE WAY WHICH
<br />SHALL PROVIDE THE LEAST POSSIBLE INTERFERENCE WITH THE CLIENT'S
<br />PERSONNEL AND PERMIT AN ORDERLY TRANSFER OF PERSONNEL AND EQUIPMENT
<br />TO THE NEW FACILITIES.
<br />3. MATERIALS AND EQUIPMENT IN OCCUPIED SPACE: STORAGE AT JOB SITE PRIOR TO
<br />INCORPORATION SHALL BE A MAXIMUM OF 48 HOURS.
<br />4. OWNER/TENANT VENDORS ARE RESPONSIBLE FOR VERIFICATION OF SCOPE.
<br />ARCHITECT'S INTENT IS FOR VENDORS TO PERFORM 'BEST PRAC IICE' WORK
<br />(COMPLIANCE WITH OWNER/TENANT STANDARDS, LOCAL BUILDING CODES, ETC.)
<br />VENDORS TO PRICE WORK ACCORDINGLY.
<br />5, CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR REVIEW AND APPROVAL BY
<br />ARCHITECT OF ALL SPECIAL ITEMS (CUSTOM) PRIOR TO
<br />MANUFACTURE/FABRICATION:
<br />107A
<br />107B
<br />_$_ -0-
<br />1492
<br />COLUMN LINE/GRID LINE
<br />DOOR/RELITE NUMBER
<br />CORRESPONDS TO ROOM ENTERING
<br />KEY NOTE
<br />PARTITION TYPE
<br />REVISION NUMBER
<br />REVISION
<br />CLOUD AROUND REVISION
<br />MATCH LINE
<br />SHADED PORTION IS THE SIDE
<br />CONSIDERED
<br />WORK POINT, CONTROL POINT
<br />OR DATUM POINT
<br />EQUIPMENT NUMBER
<br />BUILDING SECTION
<br />SECTION IDENTIFICATION
<br />SHEET WHERE SECTION IS DRAWN
<br />DETAIL SECTION
<br />SECTION IDENTIFICATION
<br />SHEET WHERE SECTION IS DRAWN
<br />I
<br />x DETAIL OR ENLARGED PLAN
<br />AXY DEVIL IDENTIFICATION
<br />SHEET WHERE DETAIL IS DRAWN
<br />ABBREVIATIONS
<br />NELSOK6-9
<br />V ANGLE FLUOR FLUORESCENT PS PAINT SYSTEM
<br />�%ONDO WINDOW SYMBOL (. CENTER LINE FM FACTORY MUTUAL PSF POUNDS PER SQUARE FOOT
<br />0 DIAMETER OR ROUND FOC FACE OF CONCRETE PSI POUNDS PER SQUARE. INCH NoiCO Architecture, Inc.
<br /># NUMBER OR POUND FOF FACE OF FINISH PT PRESSURE TREATED
<br />J PENNY FOIC FURNISHED BY OWNER PTD PAPER TOWEL DISPENSER
<br />INTERIOR ELEVATIONS T PERPENDICULAR INSTALLED BY CONTRACTOR PTD/R PAPER TOWEL DISPENSER
<br />D<A:XX �-- - ELEVATION IDENTIFICATION it.PLATE FOIO FURNISHED BY OWNER AND RECEPTACLE
<br />SHEET WHERE ELEVATION IS INSTALLED BY OWNER PTN PARTITION! �� �It Ave.
<br />AB ANCHOR BOLT FOS FACE OF STUD PTR PAPER TOWEL RECEPTACLE
<br />-- DRAWN Suite 1300
<br />� AC ACOUSTICAL FS FULL SIZE PVMT PAVEMENT
<br />A/C AIR CONDITIONING FT FEET Seattle, WA 9101
<br />ACP ACOUSTICAL CEILING PANEL FT'G FOOTING QT QUARRY TILE Phone: (206) 408-500
<br />TITL E1 ROOM IDENTIFICATION ACT ACOUSTICAL TILE FTIC FURNISHED BY TENANT WWW.NELSONWORLDWIDE.COM
<br />TITLE2 ADH ADHESIVE INSTALLED BY CONTRACTOR R RISER
<br />TITLES ROOM NAME ADJ ADJACENT FTIO FURNISHED BY TENANT RA RETURN! AIR
<br />RAD RADIUS Representative,.
<br />ROOM ROOM NO, AF ACCESS FLOOR INSTALLED BY OWNER �=�r,��lii��� �.�pr��e�����v�.,
<br />AFF AT/ABOVE FINISH FLOOR FURR FURRING R&S ROD & SHELF Firm Name: TERRAPOWER
<br />AHJ AUTHORITY HAVING JURISDICTION FUT FUTURE RB RESILIENT BASE Attn: IAN VAN HOUTEN
<br />FINISHED CEILING HEIGHT AL ALUMINUM FUTURE- FUTURE ROUGH IN ONLY RCP REFLECTED CEILING PLAN 360.739.2364
<br />ALT ALTERNATE RIO RD ROOF DRAIN E-mail: IVANHOUTEN@TERRAPOWER.com
<br />AP ACCESS PANEL RD/O ROOF DRAIN OVERFLOW
<br />PROPERTY LINE APC ACOUSTICAL PANEL CEILING GA GAGE REBAR REINFORCING BAR
<br />APPROX APPROXIMATE GALV GALVANIZED REF REFERENCE
<br />ARCH ARCHITECTURAL GB GRAB BAR REFR REFRIGERATOR
<br />ASPH ASPHALT GC GENERAL CONTRACTOR REINF REINFORCED
<br />NEW OR FINISHED CONTOURS � Structural Eng
<br />ineer:
<br />78 GL GLASS OR GLAZING REQ D REQUIRED
<br />$D BOARD Firm Name: SHUTLER CONSULTING ENGINEERS
<br />BETW BETWEEN GLB GLU-LAM BEAM REV REVISION
<br />GND GROUND RH RIGHT HAND OR ROBE HOOK JOHN HEADLAND
<br />425.
<br />EXISTING CONTOURS BLK BLOCK 42Se450,4075
<br />71 BLDG BUILDING GR GRADE RESIL RESILIENT
<br />BM BEAM GWB GYPSUM WALL BOARD RM ROOM JOHNH@SHUTLER.com
<br />0 BRG BEARING RO ROUGH OPENING
<br />$OT BOTTOM HB HOSE BIB RT RESILIENT TILE
<br />TOP OF WALL HC HOLLOW CORE OR HANDICAP RUB RUBBER
<br />BBASEMENT HDR HEADER RIN RAIN WATER Genera! Contractor:
<br />BUR
<br />R BUILT UP ROOF HDWD HARDWOOD RWL RAIN WATER LEADER Firm Name: PATTISON GENERAL CONTRACTOR
<br />fib, HOWE HARDWARE Attn: ANDY FORTINO
<br />TOP OF CURB HM HOLLOW METAL
<br />CAB CABINET S SOUTH T: 206.571.3478
<br />CB CATCH BASIN HORIZ HORIZONTAL SC SOLID CORE E-maiI:ANDYF@PATTISONGC.com
<br />CBU CEMENTITIOUS BACKER UNIT HR HOUR SCD SEAT COVER DISPENSER
<br />CEM CEMENT HT HEIGHT SCHD SCHEDULE
<br />N TOP OF PAVEMENT HTG HEATING SD SOAP DISPENSER
<br />��. CER CERAMIC HVAC HEATING/VENTILATION/
<br />Q . SECT SECTION
<br />C CFM CUBIC FEET PER MINUTE
<br />CFT CONDUCTIVE FLOOR TILE AIR CONDITIONING SF SQUARE FEET
<br />HWH HOT WATER HEATER SHTG SHEATHING CLIENT:
<br />CG CORNER GUARD
<br />SIM SIMILAR
<br />CHBD CHALK BOARD IBC INTERNATIONAL BUILDING CODE
<br />PROJECT
<br />CI CAST IRON SNK SINK
<br />ID INSIDE DIAMETER/
<br />NORTH CJT CONTROL JOINT DIMENSION SLR SEALER
<br />CLF CHAIN LINK FENCE SND SANITARY NAPKIN 5
<br />N IEC INTERNATIONAL ELECTRIC DISPENSER
<br />PROJECT NORTH CLG CEILING CODE COUNCIL I
<br />CJ CONSTRUCTION JOINT IFC INTERNATIONAL FIRE CODE SNR SANTARY NAPKIN
<br />CLK CAULKING IG INSULATED GLAZING RECEPTACLE
<br />CLO CLOSET IHM INSULATED HOLLOW METAL SOG SLAB ON GRADE
<br />CLR CLEAR IN INCH SPEC SPECIFICATION
<br />9'-0" DENOTES CHANGE IN CMU CONCRETE MASONRY UNIT SQ SQUARE
<br />ELEVATION INCL INCLUDE
<br />7.0 CNTR COUNTER INSUL INSULATION SST STAINLESS STEEL
<br />CO CLEANOUT INT INTERIOR SSK SERVICE SINK
<br />COL COLUMN IPC INTERNATIONAL PLUMBING CODE ST STONE/STONE TILE TERPAPOWER
<br />CONC CONCRETE STA STATION
<br />PT CONSTR CONSTRUCTION JAN JANITOR STC SOUND TRANSMISSION 15800 NORTHUP WAY
<br />FINISH SYMBOL CONT CONTINUOUS JT JOINT CLASS BELLEVU , WA, 00
<br />2 CORR CORRIDOR STD STANDARD
<br />CPT CARPET KIT KITCHEN STL STEEL PROJECT. -
<br />CT CERAMIC TILE KO KNOCK OUT STOR STORAGE
<br />CTR CENTER KS KNEE SPACE STRL STRUCTURAL R&D LAB EXPANSION
<br />CY CUBIC YARD SUSP SUSPENDED
<br />LAM LAMINATE SV SHEET VINYL
<br />DEL DOUBLE LAV LAVATORY SYM SYMMETRICAL
<br />DEPT DEPARTMENT LB LAG BOLT T TREAD
<br />DF DRINKING FOUNTAIN(W/O COOLER) LF LINEAL FOOT TB TOWEL BAR
<br />DIA DIAMETER LG LENGTH 331 SEAWAY BLVD.
<br />DIAG DIAGONAL TTOP &BOTTOM EVES kA/ 98203
<br />DIM DIMENSION LH LEFT" HAND TG TEMPERED GLASS e
<br />LINO LINOLEUM THK THICK
<br />DISP DISPENSER LKR LOCKER TIG TEMPERED INSULATED Description: No: Date:
<br />DN DOWN LT LIGHT GLAZING
<br />DR DOOR OR DRAIN PERMIT SET 05/26/2021
<br />DTL DETAIL TO TOP OF
<br />DWR DRAWER MACH MACHINE TOC TOP OF CONCRETE
<br />DS DOWNSPOUT MAIL MATERIAL TOP TOP OF PAVEMENT
<br />DW DISHWASHER MAX MAXIMUM TOS TOP OF STEEL
<br />DWG DRAWING MECH MECHANICAL TOSL TOP OF SLAB
<br />MEZZ MEZZANINE TOW TOP OF WALL
<br />E EAST MFR MANUFACTURER TPD TOILET PAPER DISPENSER
<br />EA EACH MH MANHOLE TPH TOILET PAPER HOLDER
<br />EB EXPANSION BOLT MIN MINIMUM TPTN TOILET PARTITION
<br />MIR MIRROR TS TUBULAR STEEL
<br />EJ EXPANSION JOINT MISC MISCELLANEOUS TV TELEVISION
<br />EL ELEVATION MLD MOLDING TYP TYPICAL
<br />ELEC ELECTRIC MRGWB MOISTURE RESISTANT GWB UNDERWRITERS LABORATORY
<br />ELEV ELEVATOR N1TD MOUNTED UL
<br />ENT ENTRY MAT MTL METAL UNF UNFINISHED
<br />EMER EMERGENCY ENCL ENCLOSURE OR ENCLOSED MULL MULLION UON UNLESS OTHERWISE NOTED
<br />EP ELECTRICAL PANEL N NORTH UR URINAL
<br />EWC ELECTRIC WATER COOLER NIC NOT IN CONTRACT
<br />EPX EPDXY NO/# NUMBER VAR VINYL
<br />S
<br />EQ EQUAL NOd`� NOMINAL VCT VINYL COMPOSITION TILE
<br />EQUIP EQUIPMENT NTS NOT TO SCALE VEST VERTICAL
<br />EST ESTIMATE VEST VESTIBULE
<br />EX EXPANSION OA OVERALL VIN VINYL
<br />EXIST EXISTING OC ON CENTER VWC VINYL WALL COVERING
<br />EXEXTERIOR OD OUTSIDE DIAMETER/
<br />DIMENSION W WEST
<br />FA FIRE ALARM OFF OFFICE W/ WITH
<br />FBO FURNISHED BY OTHERSOH OVERHEAD W/O WITHOUT SEAL:
<br />FCIC FURNISHED BY CONTRACTOR OPH OPPOSITE HAND WC WATER CLOSET
<br />INSTALLED BY CONTRACTOR OPNG OPENING WD WOOD
<br />FCTY FACTORY OPP OPPOSITE WF WIDE FLANGEI
<br />FD FLOOR DRAIN WG WIRE GLASS T E /!�i"ERTID
<br />PERP PERPENDICULAR f,
<br />WHSE WAREHOUSE A j. ITEOT
<br />FDN FOUNDATION PFN PREFINISHEDq 1
<br />FE FIRE EXTINGUISHER PL PLATE OR PROPERTY LINE WP WATER PROOF
<br />WR WATER RESISTANT
<br />FEC FIRE EXTINGUISHER CABINET PLAM PLASTIC LAMINATE
<br />FF FACTORY FINISH WSCT WAINSCOT