Laserfiche WebLink
ADD 2 ROWS 16d NAILS a <br />8" OC, TYP AT 515TERED <br />5UPPORT 5M'5 <br />ADD (5) Irod NAILS THRU <br />SUPPORT BM'S INTO POST <br />4x4 P05T W/ <br />12x12 PRE -MAN. <br />CONCRETE PIER <br />PAD BELOW <br />ADD (5) Irod NAILS <br />THRU RIM INTO P05T <br />1" e s I10 1" I ..�\ <br />� � p <br />Copyright 2021 <br />DEFINITIVE DESIGN GROUP <br />THESE DRAWINGS ARE COPYRIGHTED MATERIAL <br />AND MAY NOT BE COPIED OR REDRAWN WITHOUT <br />THE EXPRESSED WRITTEN CONSENT OF DEFINITIVE <br />DESIGN GROUP. THESE DRAWINGS ARE LIMITED TO <br />A SPECIFIC PROJECT FOR PERSONS NAMED HEREIN <br />AND FOR THE CONSTRUCTION OF ONE BUILDING. <br />ANY OTHER USE OR REUSE IS STRICTLY <br />PROHIBITED WITHOUT WWiTEN CONSENT FROM <br />DEFINITIVE DESIGN GROUP. <br />L?4e�sig-n +Gro up <br />22922 14th Place Ullest <br />Bothell, (Uashington 9,6 21 <br />.W6 3- 5 6140 jmp ddcs Ogmail com <br />OCAS FIREPLACE 4 FLUE LINER INSTALLATION <br />-FINAL INSPECTION REQUIRED <br />-DATE OF CONSTRUCTION UNKNOWN <br />-MECH. CONTRACTOR SHALL REMOVE ANY CHIMNEY <br />CAPS/COVERS FOR INSPECTION t REINSTALL <br />OFLUE LINER FOR GAS FURNACE INSTALLATION <br />-DATE OF CONSTRUCTION UNKNOWN <br />-CONTRACTOR UNKNOWN <br />-PERMIT UNKNOWN - REQUIRES FINAL INSPECTION <br />-MEC14. CONTRACTOR SHALL REMOVE ANY CHIMNEY <br />CAPS/COVERS FOR INSPECTION i REINSTALL <br />OSHED ROOF OVER BASEMENT ENTRY' <br />-DATE OF CONSTRUCTION UNKNOWN <br />-CONTRACTOR UNKNOWN <br />-PERMIT UNKNOWN - REQUIRES FINAL INSPECTION <br />FINAL INSPECTION CAPABLE WITHOUT ANY <br />DECONSTRUCTION <br />Bruce and Kathi <br />Habenicht <br />21625 42nd Drive AIE <br />Arlington, WA 98223 <br />425 238 9847 <br />CITY OF EVERETT <br />Case # CE20-0376 <br />Project Address <br />31018th Street <br />Everett WA 98201 <br />All non -permitted electrical work done to <br />date shall be exposed for inspection, <br />under the Inspector's direction, for <br />proper permit approval by any & all <br />governing agencies, or must be removed, <br />in its entirety. <br />All non -permitted mechanical work done <br />to date shall be exposed for inspection, <br />under the Inspector's direction, for <br />proper permitted approval by any & all <br />governing agencies. See drawings for <br />specific items to be inspected and <br />permitted. <br />All non -permitted plumbing work done <br />to date shall be exposed for inspection, <br />under the Inspector's direction, for <br />proper permit approval by any & all <br />governing agencies. <br />Any subsequent work required, with all <br />disciplines shown above, shall be <br />completed by a licensed contractor in <br />that specific discipline. <br />Date April 5th, 2021 <br />Drawn JMP <br />-heat <br />A2.4-i <br />