My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3101 8TH ST 2020 Plans 2022-12-15
>
Address Records
>
8TH ST
>
3101
>
Plans
>
3101 8TH ST 2020 Plans 2022-12-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 4:30:57 PM
Creation date
12/15/2022 4:17:19 PM
Metadata
Fields
Template:
Address Document
Street Name
8TH ST
Street Number
3101
Permit
BW2007-006
Year
2020
Notes
SFR REMODEL TO REMEDIATE WORK WITHOUT PERMITS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2x BLOCKING @ 24" o/c <br />SHEATHING ABOVE SECURED <br />w/ (4) 10d NAILS <br />A34 @ EA. BLOCKING <br />FULL HEIGHT STUDS <br />OR CRIPPLE STUDS <br />NAIL ROOF SHEATHING TO <br />TOP CHORD w/ 8d @ 6" O/C <br />RAFTER PER PLAN <br />SHEATHING TO MATCH <br />SHEARWALL. NAIL TO <br />GABLE PER SCHEDULE. <br />GABLE END/SHEARWALL CONNECTION <br />HIP BEAM <br />RIDGE BM. PER PLAN 36" PER PLAN <br />16d NAIL EACH BLOCK (USE <br />SDS4"x4Y" SCREW FOR 3x <br />16d NAIL EACH JOIST (USE SHEARWALL EDGE BOTTOM PLATES) <br />SDs)"x4Y" SCREW FOR 3x NAILING TO BOTTOM <br />BOTTOM PLATES) PLATE <br />JOIST PER PLAN A34 CLIPS TO MATCH <br />LTP4 SPACING (SEE <br />SHEARWALL <br />A34 CLIPS TO MATCH LTP4 SCHEDULE) <br />SPACING (SEE SHEARWALL <br />SCHEDULE) <br />SHEARWALL EDGE \(2) 16d NAILS @ SHEARWALL EDGE <br />NAILING .STAGGERED INTO EACH JOIST NAILING STAGGERED INTO <br />TOP PLATE TOP PLATE <br />*BREAK SHEARWALL SHEATHING @ CENTER OF RIM JOIST ONLY <br />JOISTS PERPENDICULAR <br />EXT4 SHEARWALUJO ST CONNECTION <br />JOISTS PARALLEL <br />(LOWER EXTERIOR SHEATHING &UPPER INTERIOR SHEATHING) <br />8d @ 6" o/c <br />2x BLOCKING <br />(N) RAFTERS <br />PER PLAN <br />-1-12.51 CLIP @ EA. RAFTER <br />SHEARWALL EDGE NAILING PER PLAN <br />LEDGER PER PLAN <br />DORMER & RIDGE FRAMING CONN. <br />SHEARWALL EDGE NAILING TO <br />'BOTTOM PLATE <br />(2) BAYS OF BLOCKING @ 48" <br />O/C W/ (3) 10d NAILS @ EA <br />BLOCK <br />ST PER PLAN <br />A34 FROM BLOCK TO TOP <br />PLATE <br />8d @ 6" o/c <br />2x BLOCKING\ <br />H2.5T CLIP\ <br />LEDGER PER <br />PLAN <br />VENTILATION MAY BE REQ'D AT BLOCKING. VERIFY METHOD W/ <br />ENGINEER PRIOR TO CONSTRUCTION. BIRD BLOCKING IS <br />ACCEPTABLE. <br />16d NAIL EACH BLOCK (USE SHEARWALL PER PLAN <br />SDS)/4"x4Y" SCREW FOR 3x <br />BOTTOM PLATES) SHEARWALL EDGE NAILING TO <br />I ZBOTTOM PLATE <br />BEAM PER PLAN; SECURE TOGETHER w/ <br />2—SDS25312 @ 12" o/c [ALTERNATE SIDES & <br />STAGGER] <br />SHEARWALL TO FLOOR CONN. <br />BEVELED BLOCKING FOR FULL <br />BEARING <br />/H2.5T CLIP <br />/RIDGE BM. PER PLAN <br />N <br />G IN V, <br />O <br />N <br />Ln <br />c <br />L� <br />co <br />L <br />4 <br />P <br />u> <br />mLu� <br />Ln <br />0 <br />0 <br />® <br />C) <br />c\j <br />6 <br />o <br />cx1 <br />0 <br />c�1 <br />o <br />I <br />Ln <br />o <br />tu <br />LLJ <br />cz <br />f <br />Lu <br />uj <br />Brawn 13y: JIE3 <br />Checked 13y: CCC <br />Date: 05-1 1 --2022 <br />5DA J013 NO. <br />9303 <br />STRUCTURAL <br />DETAILS <br />S-4,0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.