Laserfiche WebLink
ATIACH IN A MANNER THAT <br />ASSURES FABRIC IS FIRMLY <br />HELD BYTHE BACKUP <br />SUPPORT IN A WAY THAT <br />REDUCES THE POTENTIAL <br />FOR FABRIC TEARING <br />BACKUP SUPPORT <br />BACKFILLED & 1{il <br />tt ,la�l .I <br />COMPACTED <br />NATIVE SOIL GEOTEXTILE <br />FLOVV <br />BURY GEOTEXTILE <br />IN TRENCH ------ <br />UKHIIVHI t <br />GRATE FR/ <br />SEDIMENT <br />AND DEBF <br />DRAII <br />BELO <br />DEVI( <br />5" MAX <br />SECTION VIEW <br />)W BYPASS <br />NLET GRATE <br />a WATER <br />NOTES <br />1. CAT CH BASIN INSERTS SHALL BE REMOVED AT THE <br />END OF THE PROJECT. <br />2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN <br />DRAINAGE DEVICES PER THE MANUFACTURES'S <br />RECOMMENDATIONS. CATCH BASIN INLET INSERTS <br />SHALL BE INSTALLED IN CURB INLETS. <br />3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO <br />CLEARING AND GRADING ACTIVITY, OR UPON <br />PLACEMENT OF A NEW CATCH BASIN, <br />4. SEDIMENT SHALL BE REMOVED FROM THE UNIT <br />WHEN IT BECOMES ONE THIRD FULL OR IN <br />ACCORDANCE WITH THE MANUFACTURES' <br />INSTRUCTIONS. <br />5, SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY <br />REMOVING THE INLET INSERTS, EMPTYING, AND <br />RE -INSTALLING IT INTO THE CATCH BASIN, DO NOT <br />WASH SEDIMENT INTO STORM DRAINS WHILE <br />CLEANING. <br />6. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE <br />STORM WATER STRUCTURE IT WILL SERVICE. <br />7. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF <br />SYSTEM (OVERFLOW BYPASS). <br />8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF <br />THE BIGD WITHOUT SPILLING THE COLLECTED <br />MATERIAL. <br />9. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />STANDARD SPECIFICATION 8-01.3(15). <br />WSDOT STD PLAN 1-40.20-00 ACCEPTABLE SUBSTITUTE IF <br />S MAINTENANCE MEETS NOTES 1-5 <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />CNfnQl A ME 1f. F M�'a Dawn`E <br />RYAN SASS HEATh[ER GRIFFIN APAUL WILHELM ESH 12 J30/2016 <br />Tii1F <br />STORM DRAIN INLET DDRnV eGpn <br />PROTECTION 210 <br />(D_�IAT <br />BASIN I a 6 <... ^t <br />SCLE. NOTA <br />SCALES <br />NOTES <br />- POST SEE WSDOT STANDARD <br />SPECIFICATIONS 8-01.3(9)A 1. INSTALL THE ENDS OF THE SILT FENCE TO POINT <br />SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM <br />FLOWING AROUND THE ENDS OF THE FENCE. <br />2. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />FASTEN GEOTEXTILE TO WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A <br />POST EVERY 6" IN O.C. AND 8-01.3(15). <br />i 1 I I 11v <br />3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS <br />ijj <br />OR SUMP LOCATIONS, IF SPLICES ARE LOCATED IN <br />LOW OR SUMP AREAS, THE FENCE MAY NEED TO <br />N <br />SELF-LOCKING TIE -NYLONS BE REINSTALLED UNLESS OTHERWISE APPROVED. <br />6/6 (MIN GRADE) <br />120# MIN TENSILE STRENGTH 4. INSTALL SILT FENCING PARALLEL TO MAPPED <br />UV STABILIZED CONTOUR LINES. <br />' N. <br />5. DURING EXCAVATION, MINIMIZE DISTURBING <br />THE GROUND AROUND TRENCH AS MUCH AS IS <br />Y <br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING <br />EXCAVATION TO AVOID CONCENTRATING FLOWS. <br />COMPACTION MUST BE ADEQUATE TO PREVENT <br />UNDERCUTTING FLOWS. <br />c 1p BACKUP SUPPORT <br />GEOICAIILL FOR SILI FENCE l;' '.I`1 <br />STEEL POST ;a,, 11, (TYPICAL) <br />SEE STANDARD SPECIFICATION <br />�+ (TYPICAL) s;,€ <br />SECIIO(v 9 33.2 (1), TABLE 6 -- If ,l v'WI <br />Ail,, 1at <br />I r <br />^'; i Sri �. �I f � /. Y'C` �• <br />TYPICAL INSTALLATION DETAIL Y <br />�1°` i / �ti° FABRIC rY ,, cJJL <br />/ p@® (GEOTEXTILE) <br />ILE) <br />rt <br />L <br />1 <br />(TYPICAL) <br />INSTALL BACKUP SUPPORT FOR „ �r <br />�I r <br />THE GEOTEXTILE SEE STANDARDS T�� <br />SPECIFICATION SECTION 8.01.3(9)A <br />!,�� a ; ,itil tip, <br />LVI / `� P� SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER <br />TO PREVENT SILT LADEN <br />WATER <br />E ESCAPING THROUGH THE <br />ENCAT OVERLAP.--r,;1� l,i;; SPLICE DETAIL <br />I <br />�I�i a�I+ , i % i9 - <br />11fa { i / TYPICAL SILT FENCE WSDOT STD PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE <br />ITUTE <br />/ / U WITH BACKUP SUPPORT EXCEPT STEEL POST REQUIRED <br />ISOMETRICCITY OF EVERETT <br />� <br />/©�� <br />p ..PUBLICWORKS DEPARTMENT <br />/ nTY Ent r`r 5 e ,UD 6L1er D"aam y <br />�C' RYAN SASS HEATHERGRIFFIN PAULWILHELM ESH 03J17J2017 <br />TITLF <br />T v9RD DRAN'LG fJo_ <br />TEMPORARY SILT FENCE 214 <br />� 7 , <br />P:\WORK\PROJECTS\2018\18-141 EMORY'S\CE\DWG\SHEETS\C2.2 SWPPP DETAILS.DWG 10/23/2019 <br />LENGTH AS REQUIRED 1001 <br />MAY BE REDUCED TO 50' Mi <br />SITES WITH LESS THAN ONE <br />OF EXPOSED SOIL OR APPRO <br />SITE IS LESS THAN 1 ACRE. <br />s <br />PLACE CONSTRUCTION GEOI <br />a <br />STABILIZATION FROM THE El <br />ROADWAY TO THE CONSTRL <br />z <br />OR AS DIRECTED BY THE ENS <br />0 <br />0 <br />z <br />aQ <br />N � <br />oN <br />O¢o <br />O <br />, <br />SCALE: NOT TO SCALE came® <br />NOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br />MEET THE REQUIREMENTS OF WSDOT STANDARD <br />SPECIFICATION SECTION 8-01.3(7), <br />INSTALL DRIVEWAY CULVERT <br />IF THERE IS A ROADSIDE DITCH <br />PRESENT <br />30' MIN TYPICAL <br />PERMEABLE BALLAST TYPICAL SEE <br />STANDARD SPECIFICATION <br />SECTION 9-03.9(2) <br />PROVIDE FULL WIDTH OF <br />INGRESS/EGRESS AREA <br />1T MIN <br />WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE <br />CITY OF EVERETT <br />'-,EVEI?Err PUBLIC WORKS DEPARTMENT <br />CicY E�Aineer c„ ` 4 . C.ADM E Dawnfi I -1-Rev Gale <br />RYAN SASS HEATHERGRIFHN PAULWILHELM ESH. 04/03/2017 <br />TITLE <br />AADAR.D DRA4M1 NG Yo. <br />CONSTRUCTION RUCTION ACCESS I 201 <br />T.E.S.C. <br />NOTES, <br />THE NOTES AND DETAILS PROVIDED ON THIS SHEET ILLUSTRATE SOME OF THE MOST COMMON TEMPORARY EROSION/SILTATION CONTROL BEST MANAGEMENT PRACTICES (BMPs). ALTHOUGH <br />SOME MEASURES <br />T.E.S.C.PLAN FOR THIS PROJECT,3 ARE _. R FUTURE REFERENCE SHOULD CONDITIONS <br />O REQUIRE <br />ADDITIONAL MEASURES BEYOND THOSE SPECIFIED. APPROPRIATE RESPONSES TO UNANTICIPATED SITE CONDITIONS MAY INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING ADDITIONAL r " <br />Ps - <br />STRAW MULCH ® JUTE OR SYNTHETIC MATTING, EITHER GENERIC OR PROPRIETARY <br />- TEMPORARY DITCHES, SWALES, DIKES OR BASINS <br />MULCH, BRUSH OR GRAVEL FILTER BERMS ® ANCHORED PLASTIC SHEETING ® SLOPE SCARIFICATION OR TERRACING <br />® TIRE WASH STATIONS ® SODDING - ROCK CHECK DAMS <br />- DUST CONTROL <br />SUCH MEASURES SHALL BE SELECTED BY THE CONTRACTOR IN CONSULTATION WITH THE CITY INSPECTOR AND THE CESCL, AND SHALL BE INSTALLED PER <br />MANUFACTURER'S SPECIFICATIONS, ENGINEER'S DESIGN OR STANDARD CONSTRUCTION INDUSTRY PRACTICE AS THE SITUATION DICTATES. <br />1. THE TEMPORARY EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE CONSTRUCTED PRIOR TO ANY <br />6. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A <br />GRADING OR LAND CLEARING IN ACCORDANCE WITH THE APPROVED TEMPORARY <br />MINIMUM THICKNESS OF TWO INCHES. <br />EROSION/SEDIMENTATION CONTROL PLAN. THESE FACILITIES MUST BE SATISFACTORILY MAINTAINED UNTIL <br />CONSTRUCTION AND LANDSCAPING IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS <br />7. ANY AREA NEEDING T.E.S.C. MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED <br />PASSED. <br />WITHIN FIFTEEN (15) DAYS. <br />2. NONCOMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS, WATER QUALITY REQUIREMENTS, AND/OR <br />B. THE T.E.S.C. FACILITIES ON INACTIVE SITES SMALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A <br />CLEARING LIMITS MAY RESULT IN REVOCATION OF PROJECT PERMITS OR PLAN APPROVAL, FINES AND BOND <br />MONTH OR WITHIN THE 48 HOURS FOLLOWING A STORM EVENT. <br />FORECLOSURES. <br />9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER <br />3. THE T.E.S.C. FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE <br />FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. <br />CONDITIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING IMPROVED OR MODIFIED <br />TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM <br />FACILITIES AS NECESSARY TO MAINTAIN RUNOFF WATER QUALITY DURING AND AFTER SIGNIFICANT STORM <br />REMOVAL SHALL BE PERMANENTLY STABILIZED. <br />EVENTS AND TO ADDRESS THE ACTUAL SITE AND SOILS CONDITIONS ENCOUNTERED. <br />10. CONTRACTOR SMALL USE INDUSTRY BEST MANAGEMENT PRACTICES TO PREVENT PETROLEUM PRODUCTS, <br />4. CONTRACTOR SHALL MAINTAIN ON SITE AT ALL TIMES SUFFICIENT QUANTITIES OF EROSION CONTROL <br />FERTILIZERS, CONCRETE BY --PRODUCTS AND OTHER POLLUTANTS FROM ENTERING OFF -SITE DRAINAGE <br />MATERIALS TO COVER ALL EXPO T OF UNANTICIPATED WEATHER CONDITIONS. <br />COURSES. SLASH PILES AND OTHER SOLID WASTE SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL <br />CONTRACTOR MAY CONSIDER PHASING GRADING ON LARGE SITES TO MINIMIZE BARE SOIL EXPOSURE. <br />APPLICABLE LOCAL REGULATIONS. <br />S. THE IMPLEMENTATION OF THESE TESL PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, <br />11. WASTEWATER FROM PROJECT ACTIVITIES AND DE -WATERING SHALL BE ROUTED TO AN UPLAND AREA FOR <br />AND UPGRADING OF THESE T.E.S.C. FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR <br />REMOVAL OF FINE SEDIMENTS AND OTHER CONTAMINANTS. ONLY CLEAN, UNPOLLUTED WATER SHALL <br />UNTIL ALL CONSTRUCTION IS APPROVED. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED FOR <br />LEAVE TIME SITE. <br />NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY <br />1 THROUGH SEPTEMBER 30, STABILIZE WITH APPROVED T.E.S.C. METHODS (E.G. SEEDING, MULCHING, <br />12. THE CONTRACTOR SHALL KEEP OFF --SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE <br />NETTING, EROSION BLANKETS, PLASTIC COVERING, ETC.). SOIL STOCKPILES SHALL BE STABILIZED WITHIN 24 <br />STREETS WILL NOT BE ALLOWED WITHOUT PRIOR CITY OF EVERETT APPROVAL. <br />HOURS. <br />EROSION/SILTATIONCONTRACTOR RESPONSIBILITY FOR <br />IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN THAT STORM WATER <br />CONTROLLING EROSION AND SILTATION, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO AND CONSULT <br />RUNOFF BE CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND TO MAINTAIN WATER QUALITY. <br />WITH THE C.E.S.C.L. TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION ACTIVITIES, WITH THE EXCEPTION <br />ANY AND ALL MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR. <br />OF EROSION AND SILTATION CONTROL MEASURES, SHALL CEASE UNTIL SUCH TIME AS THE WATER QUALITY IS <br />BROUGHT INTO COMPLIANCE WITH D.O.E. AND CITY OF EVERETT REQUIREMENTS. <br />1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR SHALL BE FULLY <br />RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR <br />4. THECONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND ANTICIPATING STORM <br />SILT -LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, STREAM, WETLAND OR <br />ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER. <br />WATER BODY ON OR OFF THE SITE, <br />5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPS SHALL BE STORED ON SITE AND SHALL BE <br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE <br />IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED TO, <br />RESPONSIBLE FOR SELECTING AND IMPLEMENTING APPROPRIATE METHODS, "BEST MANAGEMENT <br />STRAW BALES OR OTHER MULCHING MATERIAL, SILT FENCING AND STAKES, FILTER FABRIC, ETC. <br />PRACTICES" (BMPS), FOR STORM WATER TREATMENT AND CONTROL THAT MEET" THE REQUIREMENTS <br />OF BOTH THE WASHINGTON STATE DEPARTMENT OF ECOLOGY AND CITY OF EVERETT. <br />6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, THE CONTRACTOR SHALL MONITOR ALL EROSION <br />CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND <br />3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE CERTIFIED <br />SILTATION CONTROL MEASURES ABOVE ALL OTHERS. <br />EROSION AND SEDIMENT CONTROL LEAD (C.E.S.C.L.) AND TO CITY OF EVERETT. IN THE EVENT THAT <br />THE INSTALLED WATER QUALITY CONTROL MEASURES ARE INEFFECTIVE AT <br />H <br />w <br />0 <br />U <br />V) <br />0' <br />REVISIONS <br />Aw . <br />zWE- <br />L� <br />( <br />L <br />D� <br />*� <br />'i:i_A, , <br />b9 B <br />.-ul <br />- <br />a <br />N <br />d <br />� r' <br />, ; <br />9 <br />€ r <br />LU <br />LU <br />1 <br />R <br />> <br />2 <br />CA <br />F <br />I, <br />Z- <br />t I <br />cc <br />I <br />LLJ <br />I <br />I <br />Uj <br />f <br />sus <br />DATE: <br />7-31-18 <br />LLJ <br />Uj fx <br />LJAt <br />0 Lu <br />b j <br />LIJ <br />UNPUBLISHED WORK COPYRIGHT© 2G19 BY HARMSEN & ASSOCIATES INC. 0 <br />