My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1820 100TH PL SE 2021 ICON DENTAL CENTER Plans 2025-05-02
>
Address Records
>
100TH PL SE
>
1820
>
ICON DENTAL CENTER
>
Plans
>
1820 100TH PL SE 2021 ICON DENTAL CENTER Plans 2025-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 10:35:03 AM
Creation date
12/16/2022 9:17:01 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH PL SE
Street Number
1820
Tenant Name
ICON DENTAL CENTER
Permit
B2110-047
Year
2021
Notes
INTERIOR TI FOR DENTAL OFFICE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: SEE INTERIOR ELEVATIONS AN REFLECTED CEILING/ <br />LIGHTING PLANS FOR PAINT COLOR INDICATIONS. <br />FINISH MATERIALS ALEGEND,: <br />FLOORING <br />BASE <br />WALL NO. I <br />WALL NO. 2 <br />WALL NO, 3 <br />WALL NO. 4 <br />CEILING <br />ROOM <br />NO ROOM NAME <br />MATERIAL FIN. <br />REMARKS <br />MATERIAL <br />FIN. MATERIAL <br />FIN. <br />MATERIAL <br />FIN. <br />MATERIAL <br />FIN. <br />MATERIAL <br />FIN. <br />MATERIAL <br />FIN. <br />HEIGHT <br />ioi ENTRY/WAITINGENTRY/WAITING ROOD <br />P <br />FF <br />PTI <br />PTI <br />Fw---0-4 <br />PTI <br />PTI <br />i'-i'I <br />EXi T iN 3" DROPPED SOFFITS TH15 AREA TO BE PAINTED <br />W-02 <br />SAME COLOR AS CEILING, <br />im RECEPTION <br />rr <br />FF <br />PTI <br />PTI <br />PTI <br />PTI <br />i'=i'I <br />EXISTING 3" DROPPED SOFFITS THIS AREA TO BE PAINTED <br />SAME COLOR AS CEILING. <br />103 <br />RECORDS <br />I-r <br />®®1 <br />FF <br />PTI <br />©C 1 <br />PTI <br />PTI <br />PTI <br />C® 1 <br />PTI <br />i'=III <br />104 <br />TOILET <br />Fr <br />I+ <br />FF <br />FF <br />FF <br />F-F <br />PT2 <br />io5 <br />APPOINTMENTS�=�1 <br />FF <br />�m�l <br />���� <br />FF��� <br />FF <br />PT15 FF <br />PTI <br />1Io1II <br />W-0 <br />uj <br />lor. <br />TREATMENT Room <br />I <br />FF <br />FF <br />PTi <br />><X <br />FF <br />W-01 <br />PTI <br />FF <br />CcOl <br />PTI <br />-1--TI <br />W-03 <br />lo-t <br />TREATMENT ROOM <br />2 <br />-bI <br />FF <br />FF <br />PTI <br />PTI <br />PTI <br />W-01 <br />PTI <br />IFF <br />Ceti <br />PTI <br />W=031 <br />i®a <br />MECHANICAL AL ROOM <br />E <br />XF5-02uj <br />�'rn�ll <br />_X`�X <br />l�� <br />TREATMENT ROOM3 <br />��®1 <br />FF <br />�a®1 <br />1JJ=�i <br />PT <br />W-01 <br />pTl <br />FF <br />�ll� 1 <br />FT1 <br />Cc�i <br />�T1 <br />i'=III <br />W-03_ <br />11�TREATMENT <br />ROOM <br />4 <br />1=F <br />� <br />�►J��1 <br />PTI <br />W-01 <br />PTi <br />FF <br />PTI <br />Cw>�1 <br />PTI <br />_03 <br />111 <br />TREATMENT <br />-1 <br />.����2 <br />PT1eil <br />ib�l <br />PTI <br />C®mil <br />PTI <br />112 <br />TREATMENT ROOM <br />(o <br />FF <br />FF <br />PTI <br />W-01 <br />PTI <br />FF <br />PJ�W-03 <br />PTI <br />PTI <br />'-III <br />113 <br />T ATE1NT ROOM <br />'I <br />FF <br />11�02 <br />PTI <br />=�1 <br />PTI <br />�� <br />uJ��2 <br />PTI <br />C�O1 <br />PTI <br />I .I <br />� �i <br />1�U��� <br />114 <br />TREATMENT ROOM <br />a <br />1 =O1 <br />r-F <br />®O1 <br />P <br />>< <br />UJ®O1 <br />PTI <br />FW_-_0_1j <br />PTI <br />�� <br />®O2 <br />PTI <br />C�O1 <br />PTIW <br />m <br />HALLWAY <br />FF <br />� <br />�J6� <br />FF <br />W-01 <br />PT1 <br />�� <br />C®OI <br />PTi <br />91c`�II <br />l�J�O� <br />ii� <br />T ILIZATION <br />�01 <br />FF <br />�Oi <br />� <br />UJ=O1 <br />PT2 <br />9-06 <br />FF <br />iU� 1 <br />PT2 <br />�J�O1 <br />�� <br />PT2 <br />C=O1 <br />PT2 <br />q <br />I'=4il <br />11 <br />STAFF LOUNGE <br />FF <br />FF <br />PTI <br />PTI <br />®O1 <br />PT1 <br />PTI <br />PTI <br />i'--i" <br />Clio <br />DOCTORS OFFICE <br />FF <br />B -OI <br />Fr- <br />PTI <br />PTI <br />PTI <br />Pit <br />C=®1 <br />PTI <br />I'-TI <br />Ili <br />STAFF TOILET <br />mO1 <br />FF <br />FF <br />K <br />FF <br />FF <br />FF <br />CdOi <br />PT2 <br />''sill <br />12O <br />LAB <br />=Oi <br />FIF <br />PT2 <br />® 11 <br />PT2 <br />PT2 <br />®O1 <br />PT2 <br />PT2 <br />_T-T' <br />r122121 <br />? BALL�Oi�01 <br />Ff: <br />�� <br />C�O1 <br />PTl <br />�Ic1 <br />STORAGE CLOSET <br />I <br />0 <br />F <br />B-01 <br />FF <br />IIJ�O1 <br />PTI <br />WJ-01 <br />PTI <br />UJ=Ol <br />� <br />PTI <br />�J=O1 <br />PTI <br />C�C�i <br />PTI <br />123 <br />PAIN/CEPH <br />01 <br />F-F <br />FF <br />11J®O1 <br />PTI <br />PTI <br />PTI <br />PTI <br />C=Oi <br />PTI <br />124 <br />STORAGE CLOSET <br />2 <br />FF <br />®O1 <br />P <br />PTI <br />®O1 <br />PTi <br />IJJ®O1 I <br />PTI <br />®Oi <br />PTI <br />C�Oi <br />PTI <br />-1---P <br />125 <br />MECHANICAL ROOM 2 <br />12ro <br />COMPE5. GAS TANK 5TO. <br />��02 <br />x <br />x <br />x <br />> <br />12`1 <br />(SPARE) <br />120 <br />(SPARE) <br />129 <br />(SPARE) <br />i3O <br />(SPARE) <br />DOOR SCHEDULE <br />NO. <br />LOCATION <br />SIZE <br />MATERIAL <br />AFRAME <br />GLASS <br />REMARKS <br />PlOi <br />ENTRY/WAITING POOPS <br />v <br />Y-O" x ro'-5" x 1-3/4"' �.�. <br />$TILEIR,AIL <br />STD <br />WOOD <br />PTi � <br />TEMPERED <br />D- 02 <br />TREATMENT ROOM 2 <br />:lO3 <br />DOCTOR-5 OFi=1CL <br />�10 <br />STAFF LOUNGE <br />---� <br />�l0:5 <br />MECHANICAL ROOM 2 <br />DIO6 <br />COMPPE66ED GAS TANK STOP. <br />STAFF- LOUNGE <br />B <br />3'-0" x (V® " x 1-3/4" <br />S.C. WO OD <br />SLAB <br />PTI <br />WOOD <br />PTI <br />r lOE, <br />HALLWAY iIE5 <br />B <br />3'-0" x ro'-a" x 1-3/4" .C. WOOD <br />PTi <br />WOOD <br />PTI <br />:C:510� <br />RECORD <br />mil® <br />TOiLLT <br />_ <br />MECHANICAL <br />- <br />Ix <br />— <br />- - <br />- <br />D112 <br />STAFF LOUNGE <br />D11 DDOCTOR'S <br />OFFICE <br />Dii4 <br />STAFF TOILET <br />Dli <br />LAB <br />D11 <br />STORAGE CLOSET i <br />- <br />- - <br />Dll-T <br />STORAGE CLOSET 1 <br />I <br />:11 <br />$TO AGE CLOSET 2 <br />Dlll� <br />(SPARE) <br />- <br />- <br />- — <br />DOOR TYPES. <br />SIMPSON DOOR CO, O <br />EQUAL, 41YJi2, 1-3/4" TNK. <br />IMP CN '��� CO, OR <br />I „ <br />®� <br />SOLID CO FIR, I II <br />STAINED TO MATCH W/ � � <br />EQUAL, 1-3" THK. sour> <br />11 <br />DUAL -GLAZED, SCREEN <br />CORE WOOD, PRIMED <br />DOT PATTERN GLASS. <br />POP PAINT. <br />TRIMGC 1001-2 613 <br />TPIMCO 100id2 613 <br />3.D x 15 PUSH PLATE. <br />3.5 x 15 PUSH PLATE. <br />TRIMCO 11134®3 613 i0" <br />T IMCO 11'34-3 613 1011 <br />--�� <br />PULL 6 EXTERIOR, <br />EXTER(OR, <br />SCHL E 09-50"75 <br />SCHLAGE Oc3-DC'2) <br />021 L583 THUM5TUPN - <br />L583 THUI`15TUR, <br />DE,AD5OLT; KEYED 0 <br />DE ADIBOLTg KEYED <br />EXTERIOR SIDE. <br />EXTERIOR SIDE. <br />METAL KfCKPLATE <br />METAL KICKPLATE <br />0 ! <br />_ <br />ESA. SIDE. ' ! <br />EA. SIDE. <br />ADA COMPLIANT � � <br />DADA COMPLi,ANT <br />�A <br />DRONZE THRESHOLD- <br />BRONZE THRESHOLD. <br />FIN. FLR. LiNE <br />FIN. FL - LINE e <br />TYPE A <br />TYPE- <br />B <br />MIA <br />LOCATI 3i <br />'1�101 <br />ENTRY/WAITING POOP <br />WI 2 <br />r=NTRYAWAITiNG ROOM <br />1 J1ORECORDS <br />W104 <br />RECEPTION <br />25 <br />TREATMENT ROOM 1 <br />W1O6 <br />TREATMENT ROOM 2 <br />w:I:0 <br />LA <br />`wI <br />!' TREATMENT ROOM 0 <br />W1O9 <br />TREATMENT POOP' <br />,r liO <br />TREATMENT ROOM <br />EXISTING 3" DROPPED SOFFIT THIS AREA TO BE PAINTED <br />SAME COLOR AA CEILING; VERIFY ITT. OF WAINSCOT DTL, <br />EXISTING 3" DROPPED SOFFIT THIS AREA TO BE PAINTED <br />SAME COLOR AS CEILING. <br />NO NE1) FINISHES THIS ROOM, <br />EXISTING 3" DROPPED SKIT THIS AREA TO BE <br />PAINTED <br />SAME COLOR AS CEILING. <br />EXISTING 3" DROPPED SOFFIT AND SKYLIGHT WALLS <br />THIS <br />AREA TO BE PAINTED SAME COLOR AS CEILING. <br />EXISTING 3" DROPPED SOFFIT THIS AREA TO BE <br />PAINTED <br />SAME COLOR AS CEILING. <br />EXISTING 3" DROPPED SOFFIT THIS AREA TO BE <br />PAINTED <br />SAME COLOR AS CEILING, <br />EXISTING 3" DROPPED SOFFIT TOTS AREA TO BE <br />PAINTED <br />SAME COLOR AS CEILING. <br />EXISTING 3" DROPPED SOFFIT THIS AREA TO BE PAINTED <br />SAME COLOR 45 CEiLING. <br />NO NEW FINiSHES THI15 ROOM. <br />NO NEW FINiSHES TH16 ROOM. <br />NOTE, PRIOR TO MANUFACTURE, THE WINDOW <br />SUPPLIER SMALL FIELD MEASURE EXISTING <br />REMARKS CONDITiON5 4 MAKE NECESSARY A JU TMENT . <br />EX15TING WINDOWS NO CHANGE TIT CUNT PROJECT, TYPICAL <br />DETAILS <br />REFER TO SHEET <br />'3" HEAD I JAM r3 I JAMB���� <br />DETAILS <br />REFER TO SHEET <br />ViMmUffivium <br />BASE MATERIALS,:- <br />� 1 RUBBER BASE, J HNSONiT , 1/ " STANDARD TOE, <br />CODED, 4" HIGH; COLOR 4 'B MYSTIFY, <br />(EXISTING BASE - 1N0 CHANGE) <br />-03 (NO BASE TH15 AREA) <br />�UQ1 EXISTING GYPSUM 50ARD WALL 5HTG. TO BE PATCHED <br />AND REPAIRED AS NECE55ARY AS A RESULT OF- CURRENT <br />SCOPES OF WORK. EXTRA CARE TO BE TAKEN TO MATCH <br />AND FLUSH JOIN ADJACENT LIKE -FINISH SURFACES PER <br />TENANT'S APPROVAL; NEW PAiNT PER SCHEDULE, <br />NEW 1/2" THICK GYPSUMWALLBOARD TAPED AND <br />FINISHED WITH TEXTURE TO MATCH EXISTING a TO BE <br />PAINTED WITH COLOR AS SELECTED BY TENANT AND <br />ARCHITECT. <br />� NEW 1/2" THICK GYPSUM WALL50A D TAPED AND <br />�INI�i��� IJJITII �i�®Tl� i-XTUP� TC� P�C�I�r° i"INi'L <br />WALL COVERING WITH TEXTURE AND COLOR AS <br />SELECTED 5Y TENANT AND ARCHITECT. SEE DTL. <br />>,A-i FOR HORIZONTAL TPAN61TiON TRIM. <br />Jm� EXISTING GYPSUM WALLBOARD WITH VINYL WALL <br />COVERING TO BE REMOVED. SURFACE TO BE <br />PATCHED, TAPED, AND PREPARED WITH FINISH TO <br />MATCH EXISTING, NEW PAINT PEP, SCHEDULE. <br />l JamEX15TING GYPSUM WALLE30.ARD WITH EXISTING VINYL <br />WALL COVERING TO BE REMOVED. SURFACE TO BE <br />PATCHED, TAPED, AND PREPARED TO RECEIVE NEW <br />VINYL WALL COVERING IN TEXTU EE/COLOR A <br />SELECTED BY TENANT AND ARCHITECT. 6EE DTL. <br />ro/A- 1 FOP, HORIZONTAL TRANSITiON TRIM, <br />! ®�� EXISTING GYPSUM 50A WALL HT . TO BE PATCHED <br />AND REPAIRED AS NECESSARY IN ORDER FOP NEW <br />VINYL WALL COVERING TO BE INSTALLED FULL HEIGHT. <br />1 , 0 <br />e r <br />v 3 <br />0 <br />-4 11 <br />00 <br />uj <br />0 <br />z <br />m <br />w 00 <br />0 <br />Err) <br />Ljj <br />0 <br />z <br />- <br />L) <br />0 <br />19 <br />PA <br />F. <br />0 <br />F__ <br />0 <br />x <br />LL <br />2: <br />0 <br />0 <br />e= <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.