Laserfiche WebLink
Y ti <br />I, <br />MATERIAL DESCRIPTION <br />ALL SURFACES FROM P __ STAIR TOWER COLUMNS, <br />INCLUDING BUT NOT LIMITED TO SID-1, FLASHINGS, W <br />TRIM & BLOCKING @ STAIR TOWER WALLS <br />ALL SURFACES, FRONT ELEV & COLUMNSOF STAIR TOWERS, <br />INCLUDING BUT NOT LIMITED TO SID-1, REVEALS, FLASHINGS, WD <br />TRIM & BLOCKING @ STAIR TOWER WALLS <br />UPPAINT FOR ALL EXPOSED GALVANIZED & PRE -PRIMED <br />_TOUCH <br />FLASHINGSMETAL <br />COLOR TO MATCH <br />r <br />#XeTJ* NTJM*l a t - <br />JIM01114wro <br />.T <br />COLORPNT-6 <br />STAIR TOWER <br />COLORSOFFIT <br />- + .- <br />ll <br />PNT-7 <br />COLOR TO MATCH <br />ALUMINUM <br />-- <br />RAILINGS <br />COLORS.2. REF METAL FLASHING SCHEDULE ON 1/A0.1 FOR METAL FLASHING COLORS & FINISHES. <br />REF SECTION 07 60 00 - FLASHING & SHEET METAL FOR SPECIFIED PRE -FINISHED METAL <br />3. MISCELLANEOUS PRE -PRIMED GALVANIZED METAL FLASHINGS ADJACENT TO SIDINJ <br />SHALL BE PAINTED TO MATCH SIDING COLOR, UNO & IN METAL FLASHING SCHEDULE <br />11 <br />F" <br />­1AINT ALL EXPOSED SEALANTS TO MATCH ADJACENT MATERIALS, LINO IN SEALANT <br />SCHEDULE. <br />Jill I <br />two <br />SEALANT <br />PE COLOR <br />APPLICATION <br />LOCATION <br />PRIMER <br />PAINTED <br />VISIBLE <br />BACKER ROD & <br />INTEGRAL V# FF-1 <br />SLNT-1 N/A <br />SEALANT JOINT <br />SYSTEM @ ALL DOORS <br />NONE <br />NO <br />NO <br />SACKER. ROD & <br />MISC SACKER ROD & <br />SEALANT JOINT <br />SEALANT JOINTS <br />VERIFY <br />YES <br />YES <br />ALL WD TRIM SET IN <br />SLNT-2 TBD <br />SET IN SEALANT <br />SEALANT @ BUTT <br />VERIFY <br />NO <br />NO <br />JOINTS <br />FILLET ALL EXPOSED FILLET <br />SEALANT JOINT <br />SEALANT JOINTS <br />VERIFY <br />YES <br />YES <br />METAL TO <br />MISC METAL TO METAL <br />METAL <br />LAP SEAMS <br />NONE <br />NO <br />NO <br />ALL METAL FLASHINGS <br />SET IN SEALANT <br />SET IN SEALANT O/ <br />VERIFY <br />NO <br />NO <br />METAL ACCESSORIES <br />METAL TO <br />ALL FLAT LAPPED <br />SLNT-3 <br />TBD <br />METAL CONC <br />SEAMED JOINTS <br />NONE <br />NO <br />NO <br />CONC <br />PRIMER P <br />REQUIRED <br />METAL TO <br />ON <br />CONC - SET IN <br />MTL-4 SET IN SEALANT <br />CONCRETE; <br />NO <br />NO <br />SEALANT <br />CONC OR BRICK <br />MASK OFF <br />PRIOR TO <br />PRIMING <br />ALL FILLET SEALANT <br />TBD BYARCH <br />FILLET <br />JOINTS AS AN <br />VERIFY <br />YES <br />YES <br />SEALANT JOINT <br />INTEGRAL PART OF <br />MEM-1 <br />ALL METAL TO METAL <br />METAL TO <br />LAP SEAMS <br />TBD BY MFR <br />ASSOCIATED AS <br />VERIFY <br />NO <br />NO <br />METAL <br />INTEGRAL PART OF <br />MEM-1 SYSTEM <br />SLNT-4 <br />METAL & FLEXIBLE <br />FLASHINGS SET IN <br />TBD BY MFR <br />SET IN SEALANT <br />SEALANT `JYHERE <br />VERIFY <br />NO <br />NO <br />INSTALLED AS <br />INTEGRAL PART OF <br />Mr-M-1 SYSTEM <br />MEM-1 TERMINATION <br />BACKER ROD & <br />SEALANT JOINT; W/ & <br />TBD BYARCH <br />SEALANT JOINT <br />W/O SAND <br />VERIFY <br />NO <br />YES <br />BROADCAST PER <br />DETAILS <br />SLNT®5 N/A <br />SET IN SEALANT <br />INTEGRAL W/ WRB & <br />VERIFY <br />NO <br />NO <br />SAM-1 INSTALLATIONS <br />1. SEALANT SCHEDULE IS A GUIDELINE FOR COMMON SEALANT INSTALLATIONS W1 <br />RESPECT TO FINISHED MATERIALS, COLORS & PRODUCTS. NOT ALL SEALANT <br />INSTALLATIONS ARE ACCOUNTED FOR ON THE SCHEDULE. <br />r 11il 111„ <br />LOCATIONSb. PAINT SEALANTS IN ACCORDANCE W/ SEALANT SCHEDULE; PAINT EXPOSED SLNT-2 @ <br />ALL O- <br />"AI - <br />DEPENDENT7. A VARIETY OF SLNT-2 & SLNT-3 COLORS MAY BE SELECTED BY ARCH; SELECTED COLORS <br />ARE ,A COLORS. <br />TYPE ' <br />ABBREVIATION <br />DESCRIPTION <br />ESCRIPTION <br />COMMENTS <br />CONCRETE <br />CGNC=1 <br />CAST -IN -PLACE CONCRETE <br />COLUMN PLINTHS & SOG REPAIRS <br />MEMBRANE <br />ME-1 <br />POLYDECK 150SC <br />LIOUI® APPLIED COATING <br />LANDINGS & WALKWAYS <br />SEALANTS <br />SL T-1 <br />PROSOCO R-GUARD AIRDAM <br />USE IN CONJUNCTION W/ FF-1 <br />SYSTEM <br />LNT-2 <br />BASF MASTERSEAL NP150 <br />MISC EXPOSED SEALANT JOINTS <br />THATARE PAINTABLE <br />SLIJ <br />SLIJ <br />DOWSIL 791 DR 795 <br />BASF MASTERSEAL NP-1 <br />REF SEALANT SCHEDULE <br />SEALANT ASSOCIATED W/ -1 <br />INTEGRATION OF METAL & FLEXIBLE <br />FLASHINGS <br />SL T-5 <br />FORTIFIBER MOISTOP <br />SEALANT ASSOCIATED W1WRB & <br />SA -1 <br />FLEXIBLE <br />FLASHING <br />FF-1 <br />LIQUID APPLIED FLEXIBLE <br />FLASHING - RGUARD <br />FASTF LAS H <br />MAIN FLASHING @ MAN DOORS <br />FF-2 <br />FORTIFIBER MOISTOP PF <br />FLEXIBLE COUNTER FLASHING (IF <br />NEEDED) <br />FF-3 <br />LIQUID APPLIED FIBER <br />REINFORCED FLEXIBLE <br />FLASHING - RGUARD JOINT & <br />SEAM FILLER <br />SUPPLEMENTAL FLEXIBLE <br />FLASHING W/ FF-1 <br />FF-4 <br />QUICK FLASH FLASHING <br />PANELS <br />@ ALL MISC PENETRATIONS (OR FF- <br />1 ASSEMBLYOPTION) <br />F -5 <br />FF-6 <br />BAMILEX GLASS MESH TAPE <br />TBD BY -1 MFR <br />ME-1 DECK TO WALL <br />REINFORCEMENT 6" TO 4" ROLL <br />ME-1 FLAT SEAM <br />REINFORCEMENT; 4" ROLL <br />SA -1 <br />FORTIFIBER FORTIFLASH <br />@ BLDG CORNERS <br />SIDING & <br />PLY-1 <br />1 1/8" T&G AC PLYWOOD <br />@ALL LANDINGS & WALKWAYS <br />ACCESSORIES <br />PLY-2 <br />MATCH (E) <br />@ WALLS WHERE (E) PLY IS RE/REP <br />ID-1 <br />HARD IEPANE L VERT SIDING <br />ALL LOCATIONS WHERE SIDING IS <br />RE/REP <br />WR13 <br />FORTIFIBER SUPER JUMBO <br />TEX 60 MINUTE <br />ALL LOCATIONS WHERE SIDING IS <br />RE/REP <br />GYPA <br />5/8" DENSGLASS GOLD <br />STAIR TOWER SOFFIT & SHEATHING <br />RE/REP LOCATIONS <br />SPA <br />T1 11 SOFFIT PANELS <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />VENT-1 <br />LINEAR SOFFIT VENT STRIP <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />TRIM-1 <br />2 X 2 <br />VERT TRIM @ INT CORNERS <br />TRIM-2 <br />5/4 X 12 <br />TRIM @ COLUMNS & WALL ENDS <br />TRIM-3 <br />1 X 2 <br />SOFFITTRIM <br />L -1 <br />5/4 X 6 <br />RAILING MOUNT LOCATIONS & MlSC <br />PENETRATIONS <br />L <br />5/4 X 12 <br />STANDPIPE PENETRATIONS <br />REVA <br />FCP-VERTICAL <br />VERT REVEAL <br />REV-2 <br />FCP®OUTSIDE CNR <br />OUTSIDE CORNER REVEAL <br />REV-3 <br />FCP-INSIDE CNR <br />INSIDE CORNER REVEAL <br />REV-4 <br />FCP-HOZ TRIM <br />HORIZ REVEAL <br />REV-5 <br />FCP-J CHANNEL <br />VERT/HORN J-CHANNEL <br />METALS <br />TL-1 <br />PRE -PRIMED <br />REF METAL FLASHING SCHEDULE, <br />TL-2 <br />GALVANIZED <br />REF METAL FLASHING SCHEDULE <br />TL-3 <br />SHASTA WHITE <br />MISC HEAD FLSHIN S <br />TL-4 <br />PARCHMENT <br />BASE METAL FLASHING I CONC <br />TL-5 <br />TBD <br />BASE METAL FLASHING @ BRICK <br />DOORS <br />DOOR-1 <br />STEELC FT L-20 SERIES <br />REPLACEMENT DOOR @ STAIR <br />TOWER TO HALLWAY <br />LIGHTS <br />LIGHT-1 <br />SEA GULL LIGHTING; 4325-68 <br />SOFFIT MOUNTED LIGHT <br />PAINT <br />P T-1 <br />TBD <br />STAIR TOWER BODY COLOR; REF <br />PAINT SCHEDULE <br />P T-2 <br />TBD <br />STAIR TOWER ACCENT COLOR; REF <br />PAINT SCHEDULE <br />P T-3 <br />COLOR TO MATCH TL-3 <br />REF PAINT SCHEDULE <br />PNT-4 <br />COLOR. TO MATCH MTLA <br />REF PAINT SCHEDULE <br />P T-5 <br />COLOR TO MATCH TL-5 <br />REF PAINT SCHEDULE <br />PNT-6 <br />TBD <br />STAIR TOWER SOFFIT & TRIM <br />COLOR; REF PAINT SCHEDULE <br />PIJ <br />TBD; COLOR TO MATCH <br />RAILINGS <br />REF PAINT SCHEDULE <br />P Ta E <br />GENERAL FOR "PAINT TO <br />MATCH E)" <br />AS NEEDED <br />1. MATERIAL SCHEDULE IS PROVIDD FOR REFERENCE <br />MATERIALSRESPONSIBLE FOR IDENTIFYING ALL <br />W/IN THE <br />SCOPE <br />SPECIFICATIONS FOR • INSTALLATION <br />HERE.2. ADDITIONAL PRODUCTS & MATERIALS MAY BE INCLUDED IN SPECIFICATION SECTIONS & <br />NOT NOTED <br />'F <br />- 0 , Avenue, ' <br />eatt el WA 98104 <br />9016 REGISTERED <br />ARCHITECT <br />LISA CLARK MOE <br />STATE OF WASHINGTON <br />The documents created by the <br />Architect and its Consultants <br />for this project are instruments <br />of the Architect's service, The <br />Architect retains all common <br />law, statutory and other <br />reserved rights, including the <br />copyrights The Architect's <br />documents shall not be used <br />by anyone on any other <br />project, except with the <br />Architect's written permission, <br />PROJECT #: <br />DRAWN BY: <br />N.rlxy 0 11%I <br />REVISIONS: <br />BLDG DEPT: <br />DATE: <br />SHEET TITLE: <br />s <br />aR4,100- <br />' <br />R <br />16; <br />ai"kin <br />Emm <br />