My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 MERRILL CREEK PKY BLDG 3 2020 Plans 2022-12-16
>
Address Records
>
MERRILL CREEK PKY
>
1707
>
Plans
>
1707 MERRILL CREEK PKY BLDG 3 2020 Plans 2022-12-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 9:37:51 AM
Creation date
12/16/2022 9:35:56 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1707
Unit
BLDG 3
Permit
B2011-006
Year
2020
Notes
REFRAMING SELECT STAIR TOWERS, LANDINGS, STRIP AND RECLAD OF
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y ti <br />I, <br />MATERIAL DESCRIPTION <br />ALL SURFACES FROM P __ STAIR TOWER COLUMNS, <br />INCLUDING BUT NOT LIMITED TO SID-1, FLASHINGS, W <br />TRIM & BLOCKING @ STAIR TOWER WALLS <br />ALL SURFACES, FRONT ELEV & COLUMNSOF STAIR TOWERS, <br />INCLUDING BUT NOT LIMITED TO SID-1, REVEALS, FLASHINGS, WD <br />TRIM & BLOCKING @ STAIR TOWER WALLS <br />UPPAINT FOR ALL EXPOSED GALVANIZED & PRE -PRIMED <br />_TOUCH <br />FLASHINGSMETAL <br />COLOR TO MATCH <br />r <br />#XeTJ* NTJM*l a t - <br />JIM01114wro <br />.T <br />COLORPNT-6 <br />STAIR TOWER <br />COLORSOFFIT <br />- + .- <br />ll <br />PNT-7 <br />COLOR TO MATCH <br />ALUMINUM <br />-- <br />RAILINGS <br />COLORS.2. REF METAL FLASHING SCHEDULE ON 1/A0.1 FOR METAL FLASHING COLORS & FINISHES. <br />REF SECTION 07 60 00 - FLASHING & SHEET METAL FOR SPECIFIED PRE -FINISHED METAL <br />3. MISCELLANEOUS PRE -PRIMED GALVANIZED METAL FLASHINGS ADJACENT TO SIDINJ <br />SHALL BE PAINTED TO MATCH SIDING COLOR, UNO & IN METAL FLASHING SCHEDULE <br />11 <br />F" <br />1AINT ALL EXPOSED SEALANTS TO MATCH ADJACENT MATERIALS, LINO IN SEALANT <br />SCHEDULE. <br />Jill I <br />two <br />SEALANT <br />PE COLOR <br />APPLICATION <br />LOCATION <br />PRIMER <br />PAINTED <br />VISIBLE <br />BACKER ROD & <br />INTEGRAL V# FF-1 <br />SLNT-1 N/A <br />SEALANT JOINT <br />SYSTEM @ ALL DOORS <br />NONE <br />NO <br />NO <br />SACKER. ROD & <br />MISC SACKER ROD & <br />SEALANT JOINT <br />SEALANT JOINTS <br />VERIFY <br />YES <br />YES <br />ALL WD TRIM SET IN <br />SLNT-2 TBD <br />SET IN SEALANT <br />SEALANT @ BUTT <br />VERIFY <br />NO <br />NO <br />JOINTS <br />FILLET ALL EXPOSED FILLET <br />SEALANT JOINT <br />SEALANT JOINTS <br />VERIFY <br />YES <br />YES <br />METAL TO <br />MISC METAL TO METAL <br />METAL <br />LAP SEAMS <br />NONE <br />NO <br />NO <br />ALL METAL FLASHINGS <br />SET IN SEALANT <br />SET IN SEALANT O/ <br />VERIFY <br />NO <br />NO <br />METAL ACCESSORIES <br />METAL TO <br />ALL FLAT LAPPED <br />SLNT-3 <br />TBD <br />METAL CONC <br />SEAMED JOINTS <br />NONE <br />NO <br />NO <br />CONC <br />PRIMER P <br />REQUIRED <br />METAL TO <br />ON <br />CONC - SET IN <br />MTL-4 SET IN SEALANT <br />CONCRETE; <br />NO <br />NO <br />SEALANT <br />CONC OR BRICK <br />MASK OFF <br />PRIOR TO <br />PRIMING <br />ALL FILLET SEALANT <br />TBD BYARCH <br />FILLET <br />JOINTS AS AN <br />VERIFY <br />YES <br />YES <br />SEALANT JOINT <br />INTEGRAL PART OF <br />MEM-1 <br />ALL METAL TO METAL <br />METAL TO <br />LAP SEAMS <br />TBD BY MFR <br />ASSOCIATED AS <br />VERIFY <br />NO <br />NO <br />METAL <br />INTEGRAL PART OF <br />MEM-1 SYSTEM <br />SLNT-4 <br />METAL & FLEXIBLE <br />FLASHINGS SET IN <br />TBD BY MFR <br />SET IN SEALANT <br />SEALANT `JYHERE <br />VERIFY <br />NO <br />NO <br />INSTALLED AS <br />INTEGRAL PART OF <br />Mr-M-1 SYSTEM <br />MEM-1 TERMINATION <br />BACKER ROD & <br />SEALANT JOINT; W/ & <br />TBD BYARCH <br />SEALANT JOINT <br />W/O SAND <br />VERIFY <br />NO <br />YES <br />BROADCAST PER <br />DETAILS <br />SLNT®5 N/A <br />SET IN SEALANT <br />INTEGRAL W/ WRB & <br />VERIFY <br />NO <br />NO <br />SAM-1 INSTALLATIONS <br />1. SEALANT SCHEDULE IS A GUIDELINE FOR COMMON SEALANT INSTALLATIONS W1 <br />RESPECT TO FINISHED MATERIALS, COLORS & PRODUCTS. NOT ALL SEALANT <br />INSTALLATIONS ARE ACCOUNTED FOR ON THE SCHEDULE. <br />r 11il 111„ <br />LOCATIONSb. PAINT SEALANTS IN ACCORDANCE W/ SEALANT SCHEDULE; PAINT EXPOSED SLNT-2 @ <br />ALL O- <br />"AI - <br />DEPENDENT7. A VARIETY OF SLNT-2 & SLNT-3 COLORS MAY BE SELECTED BY ARCH; SELECTED COLORS <br />ARE ,A COLORS. <br />TYPE ' <br />ABBREVIATION <br />DESCRIPTION <br />ESCRIPTION <br />COMMENTS <br />CONCRETE <br />CGNC=1 <br />CAST -IN -PLACE CONCRETE <br />COLUMN PLINTHS & SOG REPAIRS <br />MEMBRANE <br />ME-1 <br />POLYDECK 150SC <br />LIOUI® APPLIED COATING <br />LANDINGS & WALKWAYS <br />SEALANTS <br />SL T-1 <br />PROSOCO R-GUARD AIRDAM <br />USE IN CONJUNCTION W/ FF-1 <br />SYSTEM <br />LNT-2 <br />BASF MASTERSEAL NP150 <br />MISC EXPOSED SEALANT JOINTS <br />THATARE PAINTABLE <br />SLIJ <br />SLIJ <br />DOWSIL 791 DR 795 <br />BASF MASTERSEAL NP-1 <br />REF SEALANT SCHEDULE <br />SEALANT ASSOCIATED W/ -1 <br />INTEGRATION OF METAL & FLEXIBLE <br />FLASHINGS <br />SL T-5 <br />FORTIFIBER MOISTOP <br />SEALANT ASSOCIATED W1WRB & <br />SA -1 <br />FLEXIBLE <br />FLASHING <br />FF-1 <br />LIQUID APPLIED FLEXIBLE <br />FLASHING - RGUARD <br />FASTF LAS H <br />MAIN FLASHING @ MAN DOORS <br />FF-2 <br />FORTIFIBER MOISTOP PF <br />FLEXIBLE COUNTER FLASHING (IF <br />NEEDED) <br />FF-3 <br />LIQUID APPLIED FIBER <br />REINFORCED FLEXIBLE <br />FLASHING - RGUARD JOINT & <br />SEAM FILLER <br />SUPPLEMENTAL FLEXIBLE <br />FLASHING W/ FF-1 <br />FF-4 <br />QUICK FLASH FLASHING <br />PANELS <br />@ ALL MISC PENETRATIONS (OR FF- <br />1 ASSEMBLYOPTION) <br />F -5 <br />FF-6 <br />BAMILEX GLASS MESH TAPE <br />TBD BY -1 MFR <br />ME-1 DECK TO WALL <br />REINFORCEMENT 6" TO 4" ROLL <br />ME-1 FLAT SEAM <br />REINFORCEMENT; 4" ROLL <br />SA -1 <br />FORTIFIBER FORTIFLASH <br />@ BLDG CORNERS <br />SIDING & <br />PLY-1 <br />1 1/8" T&G AC PLYWOOD <br />@ALL LANDINGS & WALKWAYS <br />ACCESSORIES <br />PLY-2 <br />MATCH (E) <br />@ WALLS WHERE (E) PLY IS RE/REP <br />ID-1 <br />HARD IEPANE L VERT SIDING <br />ALL LOCATIONS WHERE SIDING IS <br />RE/REP <br />WR13 <br />FORTIFIBER SUPER JUMBO <br />TEX 60 MINUTE <br />ALL LOCATIONS WHERE SIDING IS <br />RE/REP <br />GYPA <br />5/8" DENSGLASS GOLD <br />STAIR TOWER SOFFIT & SHEATHING <br />RE/REP LOCATIONS <br />SPA <br />T1 11 SOFFIT PANELS <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />VENT-1 <br />LINEAR SOFFIT VENT STRIP <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />TRIM-1 <br />2 X 2 <br />VERT TRIM @ INT CORNERS <br />TRIM-2 <br />5/4 X 12 <br />TRIM @ COLUMNS & WALL ENDS <br />TRIM-3 <br />1 X 2 <br />SOFFITTRIM <br />L -1 <br />5/4 X 6 <br />RAILING MOUNT LOCATIONS & MlSC <br />PENETRATIONS <br />L <br />5/4 X 12 <br />STANDPIPE PENETRATIONS <br />REVA <br />FCP-VERTICAL <br />VERT REVEAL <br />REV-2 <br />FCP®OUTSIDE CNR <br />OUTSIDE CORNER REVEAL <br />REV-3 <br />FCP-INSIDE CNR <br />INSIDE CORNER REVEAL <br />REV-4 <br />FCP-HOZ TRIM <br />HORIZ REVEAL <br />REV-5 <br />FCP-J CHANNEL <br />VERT/HORN J-CHANNEL <br />METALS <br />TL-1 <br />PRE -PRIMED <br />REF METAL FLASHING SCHEDULE, <br />TL-2 <br />GALVANIZED <br />REF METAL FLASHING SCHEDULE <br />TL-3 <br />SHASTA WHITE <br />MISC HEAD FLSHIN S <br />TL-4 <br />PARCHMENT <br />BASE METAL FLASHING I CONC <br />TL-5 <br />TBD <br />BASE METAL FLASHING @ BRICK <br />DOORS <br />DOOR-1 <br />STEELC FT L-20 SERIES <br />REPLACEMENT DOOR @ STAIR <br />TOWER TO HALLWAY <br />LIGHTS <br />LIGHT-1 <br />SEA GULL LIGHTING; 4325-68 <br />SOFFIT MOUNTED LIGHT <br />PAINT <br />P T-1 <br />TBD <br />STAIR TOWER BODY COLOR; REF <br />PAINT SCHEDULE <br />P T-2 <br />TBD <br />STAIR TOWER ACCENT COLOR; REF <br />PAINT SCHEDULE <br />P T-3 <br />COLOR TO MATCH TL-3 <br />REF PAINT SCHEDULE <br />PNT-4 <br />COLOR. TO MATCH MTLA <br />REF PAINT SCHEDULE <br />P T-5 <br />COLOR TO MATCH TL-5 <br />REF PAINT SCHEDULE <br />PNT-6 <br />TBD <br />STAIR TOWER SOFFIT & TRIM <br />COLOR; REF PAINT SCHEDULE <br />PIJ <br />TBD; COLOR TO MATCH <br />RAILINGS <br />REF PAINT SCHEDULE <br />P Ta E <br />GENERAL FOR "PAINT TO <br />MATCH E)" <br />AS NEEDED <br />1. MATERIAL SCHEDULE IS PROVIDD FOR REFERENCE <br />MATERIALSRESPONSIBLE FOR IDENTIFYING ALL <br />W/IN THE <br />SCOPE <br />SPECIFICATIONS FOR • INSTALLATION <br />HERE.2. ADDITIONAL PRODUCTS & MATERIALS MAY BE INCLUDED IN SPECIFICATION SECTIONS & <br />NOT NOTED <br />'F <br />- 0 , Avenue, ' <br />eatt el WA 98104 <br />9016 REGISTERED <br />ARCHITECT <br />LISA CLARK MOE <br />STATE OF WASHINGTON <br />The documents created by the <br />Architect and its Consultants <br />for this project are instruments <br />of the Architect's service, The <br />Architect retains all common <br />law, statutory and other <br />reserved rights, including the <br />copyrights The Architect's <br />documents shall not be used <br />by anyone on any other <br />project, except with the <br />Architect's written permission, <br />PROJECT #: <br />DRAWN BY: <br />N.rlxy 0 11%I <br />REVISIONS: <br />BLDG DEPT: <br />DATE: <br />SHEET TITLE: <br />s <br />aR4,100- <br />' <br />R <br />16; <br />ai"kin <br />Emm <br />
The URL can be used to link to this page
Your browser does not support the video tag.