My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 MERRILL CREEK PKY BLDG 6 2020 Plans 2023-01-04
>
Address Records
>
MERRILL CREEK PKY
>
1707
>
Plans
>
1707 MERRILL CREEK PKY BLDG 6 2020 Plans 2023-01-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 1:47:03 PM
Creation date
12/16/2022 10:17:15 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1707
Unit
BLDG 6
Permit
B2011-009
Year
2020
Notes
REFRAMING SELECT STAIR TOWERS, LANDINGS, STRIP AND RECLAD OF
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MATERIAL DESCRIPTION <br />- �.- <br />_ TOWER <br />f ..ACES FROM (E) SIDING <br />,■ TO STAIR TOWER COLUMNS, <br />.i Y COLOR <br />INCLUDING BUT NOT LIMITED TO SIDA, REVEALS, FLASHINGS, WD <br />TRIM & BLOCKING @ STAIR TOWER WALLS <br />PNT-2 <br />STAIR TOWER <br />ALL SURFACES @ FRONT ELEV & COLUMNS OF STAIR TOWERS, <br />ACCENTCOLOR <br />INCLUDING BUT NOT LIMITED TO SID-11, REVEALS, FLASHINGS, WD <br />TRIM s BLOCKING @ STAIR TOWER WALLS <br />COLOR TO MATCH <br />TOUCH UP PAINT FOR ALL EXPOSED GALVANIZED & PRE -PRIMED <br />COLOR TO MATCH <br />iTOUCH UP PAINT FORALL EXPOSED GALVANIZED & PRE -PRIMED <br />MTLA <br />,i i <br />METAL FLASHINGS <br />COLOR TO MATCH ::TOUCH <br />UP PAINT FOR ALL EXPOSED GALVANIZED & PRE -PRIMED <br />MTL-5 <br />METAL FLASHINGS V _ -5 <br />STAIR TO E R <br />ALL SURFACES @ STAIR TOWER SOFFITS, INCLUDING BUT NOT <br />SOFFIT COLOR <br />LIMITED TO, SPA, VENT-1 & ASSOCIATED WD TRIM <br />P ., , <br />COLOR O MATCHO <br />PAINT FOR ALUMINUM GUARDRAILS R, <br />ALUMINUM <br />PREVIOUSLY PAINTED TO MATCH RAILINGS, INCLUDING BUT NOT <br />RAILINGS <br />LIMITED TO, STAIR STRINGERS, METAL DOORS & STAIR GUARDS <br />PNT-ME <br />COLOR TO MATCH <br />!AS NEEDED FOR BLDG COMPONENTS AFFECTED BYTHE WORK <br />— t A <br />2. REF METAL FLASHING SCHEDULE ON 1/A0.1 FOR METAL FLASHING COLORS & FINISHES. <br />REF SECTION 07 60 00 - FLASHING & SHEET METAL FOR SPECIFIED PRE -FINISHED METAL <br />3. MISCELLANEOUS PRE -PRIMED & GALVANIZED METAL FLASHINGS ADJACENT TO SIDING <br />SHALL BE PAINTED TO MATCH SIDING COLOR, UNO & IN METAL FLASHING SCHEDULE <br />4. PAINT ALL EXPOSED SEALANTS TO MATCH ADJACENT MATERIALS, UNO IN SEALANT <br />SCHEDULE, <br />SEALANT <br />TYPE COLOR <br />APPLICATION <br />LOCATION <br />PRIMER <br />PAINTED <br />VISIBLE <br />BACKER ROD & <br />INTEGRAL W/ FF-1 <br />SLNT-1 N/A <br />NONE <br />NO <br />NO <br />SEALANT JOINT <br />SYSTEM @ ALL DOORS <br />BACKER ROD & <br />MISC BACKER ROD & <br />SEALANT JOINT <br />SEALANT JOINTS <br />VERIFY <br />YES <br />YES <br />ALL WD TRIM SET IN <br />SLNT-2 TBD <br />SET IN SEALANT <br />SEALANT @ BUTT <br />VERIFY <br />NO <br />NO <br />JOINTS <br />FILLET ALL EXPOSED FILLET <br />SEALANT JOINT <br />SEALANT JOINTS <br />VERIFY <br />YES <br />YES <br />METAL TO <br />MISC METAL TO METAL <br />METAL <br />LAP SEAMS <br />NONE <br />NO <br />NO <br />ALL METAL FLASHINGS <br />SET IN SEALANT <br />SET IN SEALANT O/ <br />VERIFY <br />NO <br />NO <br />METAL ACCESSORIES <br />ALL FLAT LAPPED <br />SLNT-3 <br />METAL TO <br />SEAMED JOINTS @ <br />NONE <br />NO <br />NO <br />TBD <br />METAL @ CONC <br />CONIC <br />PRIMER P <br />REQUIRED <br />METAL TO <br />CONIC SETT IN <br />IU1TL- SET IN SEALANT <br />CONCRETE; <br />NO <br />NO <br />CONC OR BRICK <br />SEALANT <br />lIASK OFF <br />PRIOR TO <br />PRIMING <br />ALL FILLET SEALANT <br />FILLET <br />JOINTS AS AN <br />TBD BYARCH <br />SEALANT JOINT <br />INTEGRAL PART OF <br />VERIFY <br />YES <br />YES <br />MEM-1 <br />ALL METAL TO METAL <br />LAP SEAMS <br />TBD BY MFR <br />METAL TO <br />ASSOCIATED AS <br />VERIFY <br />NO <br />NO <br />METAL <br />INTEGRAL PART OF <br />MEM-1 SYSTEM <br />SLNT-4 <br />METAL & FLEXIBLE <br />FLASHINGS SET IN <br />SEALANT NbPrIERE <br />TBD BY MFR <br />SET IN SEALANT <br />VERIFY <br />NO <br />NO <br />INSTALLED AS <br />INTEGRAL PART OF <br />MEM-1 SYSTEM <br />MEM-1 TERMINATION <br />SEALANT JOINT; W/ & <br />TBD BYARCH <br />BACKER ROD & <br />\J\//O SAND <br />VERIFY <br />NO <br />YES <br />SEALANT JOINT <br />BROADCAST PER <br />DETAILS <br />SLNT-5 N/A <br />SET IN SEALANT <br />INTEGRAL W/ WRB & <br />VE R I F Y <br />NO <br />NO <br />SAM-1 INSTALLATIONS <br />"0111 ZfA <br />:CIF12 <br />A ` .._- - m, <br />f. PAINT SEALANTS ACCORDANCE SEALANT i PAINT @ <br />ALL <br />LOCATIONS EN INSTALLED AS A PART <br />_ OR ADJACENT IA' <br />SCHEDULED TO BE PAINTED. <br />f COLORS MAY BE SELECTED BY ARCH; SELECTED COLORS <br />ARE DEPENDENTADJACENT rIAL COLOw116S. <br />TYPE <br />ABBREVIATION <br />DESCRIPTION <br />COMMENTS <br />CONCRETE <br />CONC-1 <br />CAST -IN -PLACE CONCRETE <br />COLUMN PLINTHS & SOG REPAIRS <br />MEMBRANE <br />-1 <br />POLYOECK 150SC <br />- LIQUID APPLIED COATING <br />LANDINGS & WALKWAYS <br />SEALANTS <br />SL T-1 <br />PROSOCO R-GUARD AIRDAM <br />USE IN CONJUNCTION W/ FF-1 <br />SYSTEM <br />L T-2 <br />BASF MASTERSEAL NP150 <br />MISC EXPOSED SEALANT JOINTS <br />THAT ARE PAINTABLE <br />SLNT-3 <br />DOWSIL 791 OR 795 <br />REF SEALANT SCHEDULE <br />SLNT-4 <br />BASF MASTERSEAL NP-1 <br />SEALANT ASSOCIATED Wl —1 <br />INTEGRATION OF METAL & FLEXIBLE <br />FLASHINGS <br />SLNT-5 <br />FORTIFIBER MOISTOP <br />SEALANT ASSOCIATED W/WRB & <br />SA -1 <br />FLEXIBLE <br />FF-1 <br />LIQUID APPLIED FLEXIBLE <br />MAIN FLASHING @ MAN DOORS <br />FLASHING <br />FLASHING - RGUARD <br />FASTF LAS H <br />FF-2 <br />FORTIFIBER MOISTOP PF <br />FLEXIBLE COUNTER FLASHING (IF <br />NEEDED) <br />FF-3 <br />LIQUID APPLIED FIBER <br />SUPPLEMENTAL FLEXIBLE <br />REINFORCED FLEXIBLE <br />FLASHING W/ FF-1 <br />FLASHING - RGUARD JOINT & <br />SEAM FILLER <br />FF-4 <br />QUICK FLASH FLASHING <br />@ ALL MISC PENETRATIONS (OR F- <br />PANELS <br />1 ASSEMBLY OPTION) <br />li <br />BAMILEX GLASS MESH TAPE <br />-1 DECK TO WALL <br />REINFORCEMENT 6" TO 4" ROLL <br />FF-6 <br />TBD BY -1 MFR <br />-1 FLAT SEAM <br />REINFORCEMENT; 4" ROLL <br />SA-1 <br />FORTIFIBER FORTIFLASH <br />@ BLDG CORNERS <br />SIDING & <br />PLY-1 <br />1 1/8" T&G AC PLYWOOD <br />@ ALL LANDINGS & WALKWAYS <br />ACCESSORIES <br />PLY-2 <br />MATCH (E) <br />@ WALLS WHERE (E) PLY IS RE/REP <br />SID-1 <br />HARD IEPANE L VERT SIDING <br />ALL LOCATIONS WHERE SIDING IS <br />RE/REP <br />WRB <br />FORTIFIBER SUPER JUMBO <br />ALL LOCATIONS WHERE SIDING IS <br />TEX 60 MINUTE <br />RE/REP <br />GYPA <br />5/8" DENSGLASS GOLD <br />STAIR TOWER SOFFIT & SHEATHING <br />RE/REP LOCATIONS <br />SP-1 <br />T1 11 SOFFIT PANELS <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />VENT=1 <br />LINEAR SOFFIT VENT STRIP <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />TRIM-1 <br />2 X 2 <br />VERT TRIM @ INT CORNERS <br />TRIM- <br />5/4 X 12 <br />TRIM @ COLUMNS & WALL ENDS <br />TRIM-3 <br />1 X 2 <br />SOFFITTRIM <br />LING-1 <br />5/4 X 6 <br />RAILING MOUNT LOCATIONS & MISC <br />PENETRATIONS <br />L -2 <br />5/4 X 12 <br />STANDPIPE PENETRATIONS <br />VA <br />FCP-VERTICAL <br />VERT REVEAL <br />REV-2 <br />FCP-OUTSIDE CNR <br />OUTSIDE CORNER REVEAL <br />REV-3 <br />FCP-INSIDE CNR <br />INSIDE CORNER REVEAL <br />REV-4 <br />FCP-HOZ TRIM <br />HORIZ REVEAL <br />V- <br />FCP-J CHANNEL <br />VERT/HORIZ J-CHANNEL <br />METALS <br />TL-1 <br />PRE -PRIMED <br />REF METAL FLASHING SCHEDULE <br />TL-2 <br />GALVANIZED <br />REF METAL FLASHING SCHEDULE <br />MTL-3 <br />SHASTA WHITE <br />MISC HEAD FLSHINGS <br />TL-4 <br />PARCHMENT <br />BASE METAL FLASHING @ CONC <br />TL-5 <br />TBD <br />BASE METAL FLASHING @ BRICK <br />DOORS <br />DOOR-1 <br />ST ELCRAFT L-20 SERIES <br />REPLACEMENT DOOR @ STAIR <br />TOWER TO HALLWAY <br />LIGHTS <br />LIGHT-1 <br />SEA GULL LIGHTING; 4325-68 <br />SOFFIT MOUNTED LIGHT <br />PAINT <br />P T-1 <br />TBD <br />STAIR TOWER BODY COLOR; REF <br />PAINT SCHEDULE <br />P T-2 <br />TBD <br />STAIR TOWER ACCENT COLOR, REF <br />PAINT SCHEDULE <br />P T-3 <br />COLOR TO MATCH MTL-3 <br />REF PAINT SCHEDULE <br />Pll <br />COLOR TO MATCH MTL4 <br />REF PAINT SCHEDULE <br />P T <br />COLOR TO MATCH T L-5 <br />REF PAINT SCHEDULE <br />PINT-6 <br />TBD <br />STAIR TOWER SOFFIT & TRIM <br />COLOR; REF PAINT SCHEDULE <br />PNT-7 <br />TBD; COLOR TO MATCH <br />REF PAINT SCHEDULE <br />RAILINGS <br />PNTm E <br />GENERAL FOR "PAINT TO <br />AS NEEDED <br />MATCH (E)" <br />SPECIFICATIONS1. MATERIAL SCHEDULE IS PROVIDED FOR REFERENCE ONLY. CONTRACTOR IS <br />RESPONSIBLE FOR IDENTIFYING ALL MATERIALS W/IN THE SCOPE OF REPAIR. REFER TO <br />FOR A A INSTALLATION INFORMATION <br />2. ADDITIONAL x - t MATERIALS MAYBE INCLUDED IN SPECIFICATION <br />- I - <br />WERE.NOT NOTED <br />20, <br />A A Nt t .::.a" <br />ROUP <br />Seattle, WA 98104 <br />V,<6FRESTERED <br />ITECT <br />nor <br />LISA CLARK MOE <br />STATE OF WASHINGTON <br />The documents created by the <br />Architect and its Consultants <br />for this project are instruments <br />of the Architect's Service. The <br />Architect retains all common <br />law, statutory and other <br />reserved rights, including the <br />copyright. The Architect's <br />documents shall not be used <br />by anyone on any other <br />project, except with the <br />Architect's written permission. <br />PROJECT #: <br />DRAWN BY: <br />L' <br />CHECKED BY: <br />jwe <br />REVISIONS: <br />10-16-2020 PERMIT SET <br />BLDG DEPT: <br />DATE: <br />SHEET TITLE: <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.